Engineering Knowledge Cards.
Confidence HighUpdated 2026-09-25

Design formulas for the fixed roofs of dome-roof tanks and their sources (GB 50341-2014)

GB 50341-2014 gives the full series of fixed-roof formulas: plain spherical-shell roof-plate thickness (7.5.2, t = 0.1·R_s·sqrt(T), nominal thickness <= 12 mm); effective section area at the roof-shell junction (7.5.3); allowable external load / equivalent thickness / stability check for ribbed spherical shells (Appendix H.2.1-H.2.3); external-pressure roof plate and tension ring (Appendix B.2.4); slightly-pressured anchored roof plate (Appendix A.6.3); construction essentials in 7.5.1 (radius of curvature 0.8-1.2 x tank diameter, minimum external load 2.2 kPa). US counterpart API 650.

Applicable Codes

  • GB 50341-2014 立式圆筒形钢制焊接油罐设计规范
  • API 650

Topic Positioning

A formula index for the structural design of fixed roofs (self-supporting dome roofs) per GB 50341-2014 — for quickly locating formulas and clauses.

Core Conclusions

  • 7.5.1: dome roofs divide into plain spherical shells, ribbed spherical shells, and single-layer spherical reticulated shells; the radius of curvature is preferably 0.8-1.2 x the tank diameter; the minimum external load is 2.2 kPa (conservative).
  • 7.5.2: plain spherical-shell roof-plate thickness t_rs = 0.1·R_s·sqrt(T) (mm), nominal thickness <= 12 mm; T is the load combination (kPa) per Table F.0.1, item e.
  • 7.5.3: the effective section area A at the roof-shell junction is checked per this clause, with [sigma] taken as 1/1.6 of the specified minimum yield strength at design temperature.
  • Appendix H: ribbed spherical shells — allowable external load [P] (H.2.1), equivalent thicknesses t_1m/t_2m (H.2.2, rib-plus-plate composite sections), stability check P_L <= [P] (H.2.3, P_L per 7.1.2).
  • Appendix B.2.4 (external-pressure tanks): roof plate t_d, tension ring A_r ([sigma] >= 140 MPa), effective roof-plate length X_d, and the shell's effective height at stiffening rings — all not less than the corresponding 7.5.2/7.5.3 values.
  • Appendix A.6.3 (slightly-pressured anchored tanks): roof plate computed by the membrane method (single-lap full-fillet welds phi = 0.35) and not less than the 7.5.2 thickness.

Applicable Boundaries

Applies to vertical cylindrical welded steel oil tanks designed to GB 50341-2014; US counterpart clauses in API 650, Section 5.10 and Appendices F/V. Formulas in the clause library are stored as images — verify coefficients against the original text. Tank diameters over 40 m suit single-layer spherical reticulated shells (7.5.4).

Further Reading

GB 50341-2014, Clauses 7.5.1-7.5.4, Appendix H.2.1-H.2.3, Appendix B.2.4, Appendix A.6.3, Table F.0.1; US counterpart API 650, Section 5.10 and Appendices F/V.

Keywords

  • 拱顶罐
  • 固定顶
  • 自支撑拱顶
  • GB 50341
  • 带肋球壳
  • 光面球壳
  • 顶板计算厚度
  • 许用外荷载
  • 油罐设计