Definitions and treatment mechanisms of preservative-treated wood (preservative vacuum/pressure impregnation) versus carbonised wood (heat-treated timber), material selection limits for outdoor timber facilities (carbonised wood banned in load-bearing members) and minimum construction requirements for timber boardwalks
Preservative-treated wood and carbonised wood work by different mechanisms: preservative-treated timber is 'timber and timber products treated with wood preservatives', the treatment being 'the process of impregnating timber with preservatives under vacuum/pressure' (GB 50828-2012 Clauses 2.0.1 and 2.0.5); carbonised wood is heat-treated wood, thermally modified timber treated at high temperature (generally 160C to 240C) under a protective medium (water vapour, vegetable oil), which gains dimensional stability and mould- and decay-resistant functions from thermal modification and contains no preservative (JGJ/T 191-2009 Clause 5.5.3). Non-structural members of outdoor timber public facilities may use naturally durable timber, preservative-treated timber or carbonised wood, but load-bearing members must not use carbonised wood (DBJ50/T-332-2019 Clause 5.1.13). Boardwalk installation: seaside boardwalk foundations of concrete, steel, rock or other hard materials; preservative-treated timber joists with a section no less than 60mm x 80mm; decking no thinner than 38mm and no narrower than 90mm, with drainage gaps left; clear spacing of vertical guard posts no more than 140mm; fixings not standing above the walking surface (GB 50828-2012 Clause 7.4.6).
Applicable Codes
- GB 50828-2012 防腐木材工程应用技术规范 第2.0.1、2.0.5条、第7.4.6条
- JGJ/T 191-2009 建筑材料术语标准 第5.5.3条
- DBJ50/T-332-2019 户外公共设施木质材料应用技术标准 第5.1.13条
- GB/T 14019-2009 木材防腐术语
Scope
Distinguishes the two timber types most often confused in outdoor landscape work - preservative-treated wood (preservative impregnation) and carbonised wood (heat-treated wood) - and gives the material selection limits for outdoor timber facilities and the minimum construction requirements for timber boardwalks, for use in material selection, item description drafting and drawing review.
Core Conclusions
1. Different definitions and treatment mechanisms
- Preservative-treated wood: GB 50828-2012 Clause 2.0.1 - 'timber and timber products treated with wood preservatives'. The process, per Clause 2.0.5, is 'wood preservative treatment: the process of impregnating timber with preservatives under vacuum/pressure'. The decay resistance of preservative-treated wood thus comes from preservatives (such as CCA, ACQ) impregnated into the timber under vacuum/pressure: a chemical treatment, and the material contains preservative.
- Carbonised wood (heat-treated wood): JGJ/T 191-2009 Clause 5.5.3 - 'heat-treated wood: thermally modified timber treated at high temperature (generally 160C to 240C) under a protective medium (such as water vapour or vegetable oil). Heat-treated wood is also called carbonised wood. It has good dimensional stability and mould- and decay-resistant functions. See GB/T 14019-2009 Terminology of Wood Preservation.' Carbonised wood therefore gains mould and decay resistance and dimensional stability from thermal modification of the timber constituents, with no preservative added.
2. Selection limit: carbonised wood banned from load-bearing members
DBJ50/T-332-2019 Clause 5.1.13: 'non-structural members of outdoor timber public facilities may use naturally durable timber, preservative-treated timber or carbonised timber; carbonised timber shall not be used for load-bearing members.' High-temperature treatment reduces mechanical strength, so carbonised wood is confined to non-structural members (decking, balustrades, decorative screens and the like); load-bearing members such as posts, beams and joists must use naturally durable timber or preservative-treated timber.
3. Minimum construction requirements for timber boardwalks (GB 50828-2012 Clause 7.4.6, original text)
'The installation of timber boardwalks shall comply with the following: 1 The foundations of seaside timber boardwalks shall be of concrete, steel, rock or other hard materials. 2 Preservative-treated timber used as battens (joists) shall have a cross-section no smaller than 60mm x 80mm. 3 Preservative-treated timber used as decking shall be no thinner than 38mm and no narrower than 90mm, and drainage gaps shall be left during installation. 4 The clear spacing of vertical guard posts shall not be greater than 140mm. 5 Fixings connecting the decking shall not stand above the walking surface.'
Hence: the 38mm minimum decking thickness is a constructive lower bound that directly sets the thickness band of the consumption quota item (the 40mm flat plank item and its thicker bands); the 60mm x 80mm minimum joist section governs joist quantities and the m3 content level; keeping fixings below the plank surface is a requirement against tripping and water ponding.
4. Pricing consequences
Preservative-treated wood is a finished material: the impregnation treatment is completed in production and its cost is already in the material unit price, so no separate preservative treatment item is billed. Carbonised wood is a different material variety (thermally modified) and is not interchangeable with preservative-treated wood; the item description must state whether the material is 'preservative-treated wood' or 'carbonised/heat-treated wood', with its preservative class, moisture content, and plank thickness and width, otherwise both the rate build-up and the acceptance basis go astray.
Applicability Boundaries
- Both are timber, but their performance comes by different routes: where preservative type or retention (chemical loading) must be specified, follow the preservative-treated wood system (GB 50828-2012); where dimensional stability and absence of preservative leaching matter, follow the heat-treated wood (carbonised wood) system.
- The 'mould and decay resistance' of carbonised wood does not equal a durability class equal to preservative-treated wood; the two must not substitute for each other in load-bearing members or strongly corrosive settings such as underwater or seaside exposure.
- The boardwalk requirements of 7.4.6 are minima; specific projects must also satisfy stricter provisions of the design documents and local standards; the seaside foundation material limit applies only to seaside environments.
- The terminology standards give material definitions and performance descriptions; they do not replace the quality acceptance indicators of preservative type, retention and penetration for preservative-treated timber (see the relevant chapters of GB 50828-2012 and GB/T 14019-2009 Terminology of Wood Preservation).
Further Reading
- GB 50828-2012 Technical Code for Engineering Application of Preservative-Treated Wood, Chapter 2 terms (2.0.1 preservative-treated wood, 2.0.5 wood preservative treatment), Clause 7.4.6 (boardwalk installation construction).
- JGJ/T 191-2009 Standard for Terminology of Building Materials, Clause 5.5.3 (heat-treated wood / carbonised wood).
- DBJ50/T-332-2019 Technical Standard for Application of Wood-Based Materials in Outdoor Public Facilities, Clause 5.1.13 (material selection for outdoor timber public facilities and the ban on carbonised timber in load-bearing members).
- GB/T 14019-2009 Terminology of Wood Preservation - source of preservative treatment terms and chemical systems.
Keywords
- 防腐木
- 碳化木
- 热处理木材
- 木材防腐处理
- CCA
- ACQ
- 木栈道安装
- 户外木质材料