Engineering Knowledge Cards.
Confidence HighUpdated 2026-09-25

Railway 2024 quotas (TB/T 10829-2024 Volume 8 power works) — pricing pole-pit excavation: per "pit", four soil classes (ordinary / waterlogged / flowing sand / non-blast rock), and DY-1~16 base-period prices

In TB/T 10829-2024 Chapter 1 overhead power lines, Section 1 pit excavation, pole pits are measured per "pit" (each), not by soil volume — 16 items DY-1~DY-16. Four stepping dimensions: soil (ordinary / waterlogged / flowing-sand / rock non-blast), pit shape (round/square), with or without base plate, depth (<=2 m / <=3 m); flowing sand has only square pits (with plate); rock pits have no shape split, non-blast only. Work content uniformly: re-check position, excavate, trim (including ramps), level, protect. Base 2024; apply price adjustment for fluctuation per the administrative compilation rules.

Applicable Codes

  • TB/T 10829-2024 · Budget Quota of Railway Engineering (Volume 8: Power Works) Ch. 1 第一节 挖坑 DY-1~DY-16
  • TB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction Projects

Topic Positioning

The pricing rules of the pole-pit items DY-1~DY-16 in Chapter 1 "overhead power lines", Section 1 "pit excavation" of TB/T 10829-2024 Volume 8: units, soil stepping, item structure, and base-period prices — for estimating and auditing pole-pit excavation on railway overhead power lines.

Core Conclusions

Measurement: pole pits are per "pit", not by soil volume. 16 items DY-1~DY-16; work content uniformly: re-check pit position, excavate, trim (including ramp excavation), level, protect.

Four stepping dimensions: (1) soil in four classes — ordinary, waterlogged, flowing sand, rock (non-blast); (2) pit shape — round/square; (3) with/without base plate; (4) depth — <=2 m / <=3 m. Distribution: ordinary soil 6 items (DY-1~6: round <=2/<=3; square without plate <=2/<=3; square with plate <=2/<=3); waterlogged 6 (DY-7~12, same structure); flowing sand 2 (DY-13~14, square with plate only, <=2/<=3); rock 2 (DY-15~16, no shape split, non-blast, <=2/<=3). Note that not all combinations exist.

Base-period price table (2024, yuan/pit):

  • DY-1 ordinary, round <=2 m: 57.88 (labor 57.88 / materials 0 / plant 0)
  • DY-2 ordinary, round <=3 m: 95.33 (all labor)
  • DY-3 ordinary, square <=2 m, no plate: 65.64 (all labor)
  • DY-4 ordinary, square <=2 m, with plate: 147.84 (all labor)
  • DY-5 ordinary, square <=3 m, no plate: 116.51 (all labor)
  • DY-6 ordinary, square <=3 m, with plate: 261.21 (all labor)
  • DY-7 waterlogged, round <=2 m: 217.07 (labor 160.97 / materials 55.72 / plant 0.38)
  • DY-8 waterlogged, round <=3 m: 374.71 (276.58 / 97.36 / 0.77)
  • DY-9 waterlogged, square <=2 m, no plate: 491.86 (365.64 / 125.43 / 0.79)
  • DY-10 waterlogged, square <=2 m, with plate: 641.80 (404.13 / 236.88 / 0.79)
  • DY-11 waterlogged, square <=3 m, no plate: 893.29 (683.10 / 208.88 / 1.31)
  • DY-12 waterlogged, square <=3 m, with plate: 1,171.96 (809.15 / 361.50 / 1.31)
  • DY-13 flowing sand, square (with plate) <=2 m: 788.97 (663.85 / 121.19 / 3.93)
  • DY-14 flowing sand, square (with plate) <=3 m: 1,414.85 (1,223.87 / 185.21 / 5.77)
  • DY-15 rock (non-blast) <=2 m: 356.01 (282.70 / 6.33 / 66.98)
  • DY-16 rock (non-blast) <=3 m: 737.36 (622.08 / 8.28 / 107.00)

Consumption features (corroborating per-pit compilation): ordinary-soil items are pure labor — e.g., DY-1 only 0.388 class III shifts (149.18 yuan/shift); waterlogged includes drainage — DY-7: 1.079 shifts + galvanized wire 0.42 kg + sawn timber 0.04 m3 + single-stage centrifugal pump 0.022 shifts; rock non-blast — DY-16: 4.17 shifts + tool steel 1.19 kg + pneumatic pick 0.853 shifts + diesel compressor 0.853 shifts.

Use essentials: with-plate items run 1-2.5x the without-plate ones (larger pit opening, plate placement); blast excavation of rock pits is outside DY-15/16; base prices require adjustment for price differentials on labour, materials and plant, plus preliminaries and on-costs (indirect costs); companion stay-wire pits are DY-17~DY-24, likewise per "pit" with the same soil steps.

Applicable Boundaries

  • Only pole pits of TB/T 10829-2024 Volume 8 Chapter 1; other volumes' excavation (subgrade LY, bridge QY, signaling XY) measure differently — no cross-use.
  • Rock items are expressly "non-blast excavation"; blasting is outside — book per blasting items/measures.
  • Items cover only <=3 m (<=2/<=3); pits over 3 m have no item — handle per the quota notes.
  • Prices are 2024 base-period; adjust by region number for percentage rates and apply price adjustment for fluctuation — not contract prices.

Further Reading

  • TB/T 10829-2024 Chapter 1 Section 1: 1. pole pits (DY-1~DY-16); 2. stay-wire pits (DY-17~DY-24).
  • Companion: TB 10801-2024 (labour classes, price adjustment for fluctuation, preliminaries and on-costs).
  • Compare: signaling cable-trench dig-and-fill (hm, count x soil x depth) and subgrade soil haulage (distance boundaries) to see each volume's measurement calibers.

Keywords