GB 50084-2017 clause 6.2.1 requirements for and functions of alarm valve groups: automatic sprinkler systems shall be provided with alarm valve groups, closed-type systems protecting steel roof trusses and other building elements shall have independent alarm valve groups, and water curtain systems shall have independent alarm valve groups or heat-responsive deluge alarm valves; the roles of wet and dry valves and the deluge valve, and the checking function of the test valve

GB 50084-2017 clause 6.2.1: automatic sprinkler systems shall be provided with alarm valve groups; closed-type systems protecting indoor steel roof trusses and other building elements shall be provided with independent alarm valve groups; water curtain systems shall be provided with independent alarm valve groups or heat-responsive deluge alarm valves. The role of the wet and dry alarm valves is to open or shut the alarm water flow and, once a sprinkler operates, to drive the water motor gong and the pressure switch to alarm while preventing backflow; the deluge alarm valve opens or shuts the water supply to the distribution pipes; the test valve serves to check the reliability of the alarm valve, the water motor gong and the pressure switch. The reason for independent provision is that the functions differ and separate management is easier.

Applicable Codes

  • GB 50084-2017 自动喷水灭火系统设计规范 第6.2.1条
  • GB/T 50856-2024 App. J Table J.1.1(030901004 报警装置)
  • GB 50261 自动喷水灭火系统施工及验收规范

Topic positioning

The number of alarm valve groups to set in an automatic sprinkler system, the requirements for independent groups, and the respective functions of wet and dry alarm valves, the deluge alarm valve and the test valve - this is the design-side basis for counting alarm devices by 'group' and by system in fire water systems and for judging whether an 'independent alarm valve group' is required.

Core conclusion

Clause text (GB 50084-2017 clause 6.2.1): 'Automatic sprinkler systems shall be provided with alarm valve groups. Closed-type systems protecting indoor steel roof trusses and other building elements shall be provided with independent alarm valve groups. Water curtain systems shall be provided with independent alarm valve groups or heat-responsive deluge alarm valves.'

Functional explanations in the commentary (key points):

  • Wet and dry alarm valves: open or shut the alarm water flow; after a sprinkler operates, the alarm water flow drives the water motor gong and the pressure switch to alarm; they prevent backflow of water.
  • Deluge alarm valve: opens or shuts the water supply to the distribution pipes.
  • The test valve in the alarm valve group serves to check the reliability of the alarm valve, the water motor gong and the pressure switch. Because the alarm valve, the water motor gong and the pressure switch all work on the hydraulic-drive principle, they are highly reliable and stable.
  • The closed-type system built for steel roof trusses and other building elements differs in function from the closed-type system used to fight fires at floor level; to make separate management easier, a separate alarm valve group is prescribed. Water curtain systems are similar and are likewise prescribed an independent alarm valve group or a heat-responsive deluge alarm valve.

Measurement implications that follow (linking to the BOQ basis): within one building, the closed-type system 'protecting building elements' and the closed-type system 'fighting floor fires' cannot share one alarm valve group; when alarm devices are counted (BOQ item 030901004 'alarm device', unit 'group'), they must be counted by system; the independent alarm valve group or heat-responsive deluge alarm valve of a water curtain system is likewise counted in separate groups and must not be merged with the main alarm valve group of the sprinkler system.

Applicable boundaries

  • This card answers only 'must one be provided, must it be independent, and what does each valve do'; it does not cover the model selection and valve diameter of alarm valve groups or the hydraulic calculation of the distribution pipes (see the other chapters of GB 50084-2017).
  • 'Independent alarm valve group' is a design and system-division requirement, not a requirement to open a separate item name in the BOQ - at BOQ level all alarm devices fall under the 'alarm device' item, distinguished by the 'name' in the item description (wet, wet/dry combined, electric deluge, pre-action).
  • Local application systems and special locations (such as in-rack sprinklers in warehouses and protective cooling water curtains) still follow their own specific clauses and do not rely on this clause alone.

Further reading

  • GB 50084-2017 'Design code for automatic sprinkler systems', clause 6.2.1 (system components - alarm valve groups) and its commentary; companion clause 6.5.2 (composition of the end-of-line test device).
  • Measurement and listing: GB/T 50856-2024 Appendix J, Table J.1.1 (water-based extinguishing systems, code 030901), item 030901004 'alarm device' (unit 'group') and note 3 on questions (the grouped contents of wet, wet/dry combined, electric deluge and pre-action alarm devices).
  • Acceptance side: GB 50261 'Code for installation and acceptance of automatic sprinkler systems', the chapters on installation and commissioning of alarm valve groups.