Minimum thickness of steel-concrete composite slabs and constructional limits on profiled sheeting base thickness (GB 55004-2021 Article 5.3.2), and the composition of the effective section for stiffness calculation

GB 55004-2021 General Code for Composite Structures, Article 5.3.2 (mandatory): the total thickness of a steel-concrete composite slab shall be not less than 90 mm, and the base thickness of the profiled steel sheeting not less than 0.7 mm. The article sets constructional lower limits on the minimum slab thickness and the net base thickness of the sheeting to ensure composite action between the concrete and the sheet. The effective section for stiffness calculation comprises the concrete above the sheeting ribs, the concrete in the sheeting troughs and the effective section of the sheeting itself; its thickness is determined economically and rationally subject to the ultimate limit states, serviceability limit states and fire performance.

Applicable Codes

  • GB 55004-2021 组合结构通用规范
  • GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准
  • DB 34/T 3463-2019 钢筋桁架楼承板系统应用技术规程

Scope of the question

The constructional minimum dimensions of steel-concrete composite slabs (profiled-sheet composite slabs; cast slabs on rebar-truss floor decks) and the composition of the effective section for stiffness calculation - for deck type and thickness selection, drawing review and construction-document examination.

Core conclusions

GB 55004-2021 General Code for Composite Structures, Article 5.3.2: the total thickness of steel-concrete composite slabs shall be not less than 90 mm, and the base thickness of the profiled steel sheeting not less than 0.7 mm.

Commentary points: this article sets constructional lower limits on the minimum thickness of composite slabs and the minimum net base thickness of the sheeting, to ensure composite action between concrete and sheeting. The effective section for stiffness calculation of a composite slab comprises the concrete above the rib crests of the sheeting, the concrete in the sheeting troughs and the effective section of the sheeting itself; its thickness is determined on economic and rational principles subject to the ultimate and serviceability limit states and fire performance.

Key readings:

  1. 90 mm is the total thickness of the composite slab (including the rib height of the sheeting and the concrete above), not just the concrete topping;
  2. 0.7 mm is the lower limit of the net base thickness of the sheeting (excluding galvanising);
  3. the effective section for stiffness has three parts - concrete above the rib crests + concrete in the troughs + the sheeting itself; only their combined section is effective;
  4. that thickness is not simply the total thickness: it is set economically and rationally under the ultimate limit state, the serviceability limit state and fire performance - fire often governs, and the practical thickness is commonly set by the fire-resistance rating, not by the 90 mm minimum.

Applicability limits

  • Applies to steel-concrete composite slabs designed for composite action (sheeting and concrete working together); where the sheeting serves only as permanent formwork without composite action (non-composite), this article does not directly bind - see the product and workmanship standards for profiled sheeting.
  • 90 mm and 0.7 mm are constructional minima and do not replace the project's capacity, deformation and fire calculations; design values come from calculation and shall not fall below the minima.
  • GB 55004-2021 is a fully mandatory engineering construction code - its provisions are strictly enforceable and prevail over inconsistent provisions of older recommendatory standards.
  • This card gives only the constructional limits and the effective-section concept, not project thickness values.

Further reading

GB 55004-2021 General Code for Composite Structures, Chapter 5 design of composite members, Article 5.3.2 and its commentary. Companion bases: the BOQ measurement split of profiled steel decking and rebar-truss decks in GB/T 50854-2024 Measurement Standard for Building and Decoration Works, Appendix F notes F.10.5 with Table F.5.1 and Appendix E note E.7.4; acceptance of rebar-truss concrete floor systems per DB 34/T 3463-2019 Technical Specification for Rebar-Truss Floor Deck Systems, Article 6.1.1 (conforming to the design, the specification, JG/T 368 Rebar-Truss Floor Decks, GB 50204 Code for Acceptance of Construction Quality of Concrete Structures, JGJ 162 Technical Code for Safety of Forms in Construction and GB 50300 Unified Standard for Acceptance of Construction Quality of Building Works).

Keywords

  • GB 55004-2021
  • 组合结构通用规范
  • 钢-混凝土组合楼板
  • 压型钢板基板厚度
  • 组合楼板最小厚度
  • 组合楼板刚度
  • 有效截面