FIDIC 工程师的计量-估价-付款职责链:红皮书 12.1/12.2/12.3/14.1 与 2017 版差异
是,且是核心职责。FIDIC 红皮书为重新计量(re-measurement)合同:合同价格不是签约时 BOQ 加总,而是工程师按实测量×适用费…
FIDIC Conditions of Contract for Construction, 1st Edition 1999(红皮书)Sub-Clause 3.2/3.5/12.1/12.2/12.3/14.1/14.6/14.7/14.13FIDIC Conditions of Contract for Construction, 2nd Edition 2017(红皮书)Sub-Clause 3.1/3.7/12.2/12.3/14.1FIDIC Conditions of Contract for Plant and Design-Build, 1st Edition 1999(黄皮书)Sub-Clause 3.12026-09-08 - 暂无英文版02
FIDIC 合同的 Engineer(工程师)是什么角色:雇主任命的合同管理职位、1999→2017 身份中立化演变,及其与国内监理人/总监理工程师体系的职能对应与差异
FIDIC 的 Engineer 不是职称或设计工程师,而是雇主任命并支付报酬的合同管理职位,可为个人也可为法人(2017 版法人须委派自然人代…
FIDIC Conditions of Contract for Construction (Red Book) First Edition 1999, Sub-Clause 3.1/3.2FIDIC Conditions of Contract for Plant and Design-Build (Yellow Book) First Edition 1999, Sub-Clause 3.1FIDIC Conditions of Contract 2017 (Second Edition) 红/黄皮书 Sub-Clause 3.1/3.4/3.72026-09-08