检验批
- 01
Inspection-lot division rules for installation works: general principle (one design system or equipment group), plan preparation/review procedure, and discipline details for water/sewer, electrical, HVAC, energy saving, industrial, and intelligent buildings
Installation inspection lots are generally divided as one lot per design…
GB 50300-2013《建筑工程施工质量验收统一标准》第4.0.5、4.0.7条GB 55032-2022《建筑与市政工程施工质量控制通用规范》第4.1.1、4.1.2条GB 50242-2002《建筑给水排水及采暖工程施工质量验收规范》第3.1.5条2026-09-12 - 02
Differences and division basis among the four levels: inspection lots, sub-item works, sub-divisional works, and unit works
Construction quality acceptance is divided into four levels "unit work →…
GB 50300-2013 建筑工程施工质量验收统一标准 第4章GB 55032-2022 建筑与市政工程施工质量控制通用规范 第4.1.1条2026-08-11