火灾自动报警系统
- 01
Wiring (wire-pulling) rules for automatic fire alarm systems: protective conduit selection, conductor voltage rating and burning performance (not below B2), installation combinations, and workmanship (GB 50116-2013, GB 55036-2022, GB 50166-2019)
Transmission circuits of automatic fire alarm systems shall be protected…
GB 55036-2022 消防设施通用规范(第12.0.16条)GB 50116-2013 火灾自动报警系统设计规范(第11.1.1、11.1.2、11.2.1、11.2.3、11.2.5、11.2.6条;其中11.2.5条已废止)GB 50166-2019 火灾自动报警系统施工及验收标准(第3.2.2、3.2.5、3.2.10~3.2.13、3.2.16条)2026-09-12 - 02
Attribution of fire-power monitoring, electrical-fire monitoring, and fire-door monitoring systems: fire-service nature and calibers under the three systems of fire acceptance, construction-quality acceptance, and cost division
All three are companion subsystems of the automatic fire alarm system (F…
DBJ/T 15-248-2022《建筑工程消防施工质量验收规范》第8.1.1条、第3.2.2条GB 50116-2013《火灾自动报警系统设计规范》第9.1.2条、第6.11.3条GB 55036-2022《消防设施通用规范》第12.0.14条2026-09-12