Statutory cap and practical rules for bid bonds: not exceeding 2% of the estimated project price; validity consistent with the bid validity period (Implementation Regulations Article 26)

The bid bond shall not exceed 2% of the tendered project's estimated price (Implementation Regulations Article 26), the base being the project estimate - not the section cap, tender price ceiling, or contract price; validity shall match the bid validity period. For domestic bidders on mandatory-tender projects paying in cash or cheque, the bond must come from their basic bank account; the tenderer shall not misappropriate it; the tenderer shall return the bond plus bank interest within 5 days after signing the written contract (Article 57). Distinguish: the performance bond under Article 58 shall not exceed 10% of the awarded contract price.

Applicable Codes

  • 《中华人民共和国招标投标法实施条例》(国务院令第709号,2019修订)第二十六条
  • 《中华人民共和国招标投标法实施条例》第五十七条
  • 《中华人民共和国招标投标法实施条例》第五十八条
  • 《工程建设项目施工招标投标办法》(七部委令第30号)第六十二条

Topic Positioning

The statutory cap and supporting practical rules for bid bonds: computation base (project estimate), cap ratio (2%), validity, basic-account transfer, no misappropriation, return deadline, and the base/ratio distinction from performance bonds (10% of contract price) - for tender-document review, bid preparation, and compliance checks.

Core Conclusions

  • Statutory cap (Article 26, original): "Where the tenderer requires a bid bond in the tender documents, it shall not exceed 2% of the tendered project's estimated price. The bond's validity shall be consistent with the bid validity period."
  • Base: the project estimate - not the section price cap, tender price ceiling, or contract price; validity must match the bid validity period - the documents may not set a longer one.
  • Fund path (item 2): "For domestic bidders on mandatory-tender projects, bid bonds paid in cash or cheque shall be transferred out of their basic bank account." Guarantees/insurance and foreign bidders are exempt.
  • No misappropriation (item 3): "The tenderer shall not misappropriate bid bonds."
  • Return: at the latest within 5 days after signing the written contract, return bonds plus bank interest of the same period to the winner and losers alike (Article 57).
  • Performance bond distinction (Article 58, original): "Where the tender documents require the winner to provide a performance bond, the winner shall provide it as required. The performance bond shall not exceed 10% of the awarded contract price." Different base (estimate vs contract price), ratio (2% vs 10%), and function (securing the bid vs securing performance).
  • Bond clauses exceeding the statutory cap are unlawful; bidders may question (object) in writing under Article 60 and complain to the supervision department.

Applicable Boundaries

Applies to bid-bond compliance for mandatory and voluntary tenders; "estimated price" per the figure stated in and approved tender documents; the basic-account rule binds only domestic bidders paying cash/cheque - bank guarantees, insurance bonds, and e-guarantees are exempt; government procurement and e-bidding follow their own rules where special provisions exist; stricter local/sectoral caps prevail. Retention money (defect-liability deposit, capped at 3% of the settlement total per Jianzhi [2017] No. 138) is outside this card.

Further Reading

Implementation Regulations (Decree No. 709, 2019) Articles 26 (cap, validity, basic account, no misappropriation), 57 (return deadline and interest), 58 (performance bond cap); Measures for Tendering of Construction Projects (7-Ministry Order No. 30) Article 62 (if a performance bond is required, the tenderer shall concurrently provide payment security and shall not raise the bond); policy trend: Guobanfa [2024] No. 21 on replacing cash bonds with guarantees/insurance. The performance-bond vs retention-money boundary is in related cards.