The quality-standard system and colour of aluminium-zinc coated steel sheet (continuously hot-dip aluminium-zinc coated sheet, trade names aluzinc / aluminium-zinc-clad sheet): product standard, building coating and thickness requirements, site inspection, and mill finish versus coil-coated colour
Aluzinc sheet is continuously hot-dip (zinc-alloy) coated sheet under the current product standard GB/T 2518-2019 (Continuous Hot-Dip Zinc and Zinc-Alloy Coated Steel Sheet and Strip); the former standalone GB/T 14978-2008 is withdrawn and merged into GB/T 2518. Building uses add companion standards: profiled sheet per GB 50896-2013 clauses 4.1.1 / 4.1.3 (outer sheet 0.6 mm or more, inner 0.5 mm or more); portal-frame envelopes per GB 51022-2015 clause 11.1.4 (aluzinc base coating not under 150 g/m2, coated); strong-wind metal roofs per DBJ/T 15-148-2018 clause 4.6.3 (hot-dip aluzinc double-face coating not under 185 g/m2); member corrosion per JGJ/T 486-2020 clause 3.1.6 (ordinary zones not under 100 g/m2, severe not under 175; 3.76 g/m2 aluzinc = 1 um); site inspection per JGJ 383-2016 clause 7.2.2 (one lot per 60 t, 3 specimens per lot). The mill finish is silver-white to silver-grey with alloy spangle - bare sheet comes in no colour; colour requires pre-coated sheet per GB/T 12754.
Applicable Codes
- GB/T 2518-2019 连续热镀锌和锌合金镀层钢板及钢带
- GB/T 14978-2008 连续热镀铝锌合金镀层钢板及钢带(已废止)
- GB/T 12754 彩色涂层钢板及钢带
- GB/T 12755 建筑用压型钢板
- GB 50896-2013 压型金属板工程应用技术规范
- GB 51022-2015 门式刚架轻型房屋钢结构技术规范
- DBJ/T 15-148-2018 强风易发多发地区金属屋面技术规程
- JGJ/T 486-2020 轻板结构技术标准
- JGJ 383-2016 轻钢轻混凝土结构技术规程
- DB62/T 3147-2018 内衬聚乙烯水箱(池)技术规程
- https://openstd.samr.gov.cn/bzgk/std/newGbInfo?hcno=E0E9513AD17781BA85E6F8DDFE11CA0D
- https://openstd.samr.gov.cn/bzgk/std/newGbInfo?hcno=6971F67FB71664C0E82722B24FB82259
- https://std.samr.gov.cn/gb/search/gbDetailed?id=71F772D77497D3A7E05397BE0A0AB82A
Topic Positioning
The product-standard system, building companion requirements and colour of aluminium-zinc coated sheet (aluzinc) - which standard governs, what coating and thickness floors apply, how site inspection runs, what the mill finish looks like, and whether colour is possible.
Core Conclusions
1. Quality standards
1. Product standard (currency)
- Aluzinc sheet is continuously hot-dip zinc-(alloy) coated sheet under GB/T 2518, current edition GB/T 2518-2019; the former standalone GB/T 14978-2008 (Continuous Hot-Dip Aluminium-Zinc Alloy Coated Steel Sheet and Strip) is withdrawn, its content merged into GB/T 2518-2019. Some live clauses still cite "GB/T 14978" - procure and inspect per the current GB/T 2518.
- Make-up: aluzinc sheet carries an aluminium-zinc alloy coat of 55% Al, 43.4% Zn and 1.6% Si solidified at about 600 degrees C - a dense quaternary Al-Fe-Si-Zn crystal barrier against corrosion (commentary to DB62/T 3147-2018 clause 3.0.5).
- Steel-plastic composite bolted water tanks: outer layer of galvanised or aluzinc sheet - galvanised to GB/T 2518, aluzinc to GB/T 14978 - with thicknesses per its table 3.0.5 (DB62/T 3147-2018 clause 3.0.5).
2. Building companion requirements
- Profiled sheet: per GB/T 2518, GB/T 14978, GB/T 12754 (pre-coated) and GB/T 12755 (profiled sheet for buildings); chemistry and mechanics per GB 50896 annex A (clause 4.1.1).
- Thickness: roof and wall profiled sheet - important buildings preferably pre-coated, ordinary buildings aluzinc or galvanised; outer-sheet nominal thickness not under 0.6 mm (important) / preferably 0.6 mm (ordinary), inner not under 0.5 mm (clause 4.1.3). Important / ordinary per GB 50068: safety classes I-II or design life 50 years and over are important.
- Portal-frame envelopes: pre-coated base sheet mechanics per GB/T 12755, yield not under 350 N/mm2 (snapped-lap systems 500); hot-dip zinc base not under 275 g/m2, coated; aluzinc base not under 150 g/m2, per GB/T 12754 and GB/T 14978 (GB 51022-2015 clause 11.1.4).
- Strong-wind roofs: profiled sheet preferably zinc-aluminium-magnesium at 180 g/m2 double face or more; hot-dip aluzinc not under 185 g/m2; 360-degree snap roofs from 0.5 mm; perforated sheet unsuited outdoors, damp or corrosive settings; nominal thickness = base sheet including coating (DBJ/T 15-148-2018 clause 4.6.3).
- Member corrosion (light-gauge steel): ordinary zones zinc not under 180 g/m2 or aluzinc not under 100 g/m2; severe or special not under 275 zinc / 175 aluzinc. Conversion: zinc 7.20 g/m2 = 1 um; aluzinc 3.76 g/m2 = 1 um (JGJ/T 486-2020 clause 3.1.6).
- Site inspection: coating thickness per design; one lot per 60 t, 3 specimens per lot; check certificates, mill reports and sampling reports; materials per GB/T 2518 or GB/T 14978 (JGJ 383-2016 clause 7.2.2).
2. Colour
- Mill finish: supplied as standard - silver-white to silver-grey metallic with the alloy "spangle" (normal or mini); trade "mill-finish sheet".
- No colour choice: bare aluzinc comes in no yellow, blue or red; colour requires pre-coated sheet (aluzinc base allowed) per GB/T 12754.
- Shade variance: even mill finish varies with spangle form and surface treatment (passivation, oiling, anti-fingerprint); where appearance uniformity matters, agree samples at ordering and control intra- and inter-lot difference.
Applicability Boundaries
- GB/T 2518-2019 replacing GB/T 2518-2008 and GB/T 14978-2008 is a document-level update; clauses and dates follow the standard texts; clauses still citing GB/T 14978 are old numbers - procure and inspect per GB/T 2518.
- Coating floors differ by standard and scene - never interchangeable: portal envelopes 150 g/m2, strong-wind aluzinc roofs 185 g/m2, member corrosion 100 g/m2 ordinary - take per the standard that fits the works.
- Colour statements are trade knowledge - the sample and product standard govern.
- General code knowledge; no project or regional prices.
Further Reading
- GB 50896-2013 Technical Code for Application of Profiled Metal Sheet, clauses 4.1.1, 4.1.3, annex A.
- GB 51022-2015 Technical Code for Steel Structures of Light-Weight Portal Frame Buildings, clause 11.1.4; DBJ/T 15-148-2018 Technical Regulation for Metal Roofs in Strong-Wind Regions, clause 4.6.3.
- JGJ/T 486-2020 Technical Standard for Light-Plate Structures, clause 3.1.6; JGJ 383-2016 Technical Regulation for Light-Steel Light-Concrete Structures, clause 7.2.2.
- DB62/T 3147-2018 Technical Regulation for PE-Lined Water Tanks, clause 3.0.5.
- Product standards: GB/T 2518-2019 (current), GB/T 12754, GB/T 12755, GB/T 14978 (withdrawn).
- National standards full-text system (verify currency): https://openstd.samr.gov.cn/bzgk/std/newGbInfo?hcno=E0E9513AD17781BA85E6F8DDFE11CA0D ; https://openstd.samr.gov.cn/bzgk/std/newGbInfo?hcno=6971F67FB71664C0E82722B24FB82259