Height, thickness and mass-per-area specifications of dimpled plastic drainage (storage) boards, and their jointing and laying requirements (planted roofs and basement-roof greening)
Plastic drainage (storage) boards: height preferably not under 12 mm, mean thickness preferably not under 1.2 mm and mass per area preferably not under 800 g/m2 (DB11/T 1363-2016 Article 4.2.1); planted roofs preferably take high boards of at least 16 mm on a rigid protection layer (5.3.1); laid horizontally under soil, sheet thickness shall be not under 0.8 mm (3.0.2); dimpled boards preferably lap, laps not under 100 mm (JGJ 155-2013 Article 6.5.1); gravel 25-40 mm, expanded clay 10-25 mm with bulk density preferably not over 500 kg/m3, layers preferably not under 100 mm (4.4.1).
Applicable Codes
- DB11/T 1363-2016 第3.0.2条
- DB11/T 1363-2016 第3.0.4条
- DB11/T 1363-2016 第4.1.1条
- DB11/T 1363-2016 第4.2.1条
- DB11/T 1363-2016 第5.3.1条
- DB11/T 1363-2016 第6.4.2条
- JGJ 155-2013 第4.4.1条
- JGJ 155-2013 第6.5.1条
- SJG 19-2019 第4.4.13条
- JC/T 2112-2012
Scope of the question
The product specifications - height, thickness, mass per area - of the dimpled plastic drainage (storage) boards used on planted roofs and basement-roof gardens, and their jointing and drainage (storage) layer laying requirements. Bases: DB11/T 1363-2016 Technical Specification for Plastic Drainage (Storage) Board Construction, JGJ 155-2013 Technical Specification for Planted Roof Works and SJG 19-2019 Shenzhen Standard for Waterproofing of Building Works.
Core conclusions
1. Specification floors for plastic drainage (storage) boards (DB11/T 1363-2016 4.2.1) Height preferably not under 12 mm, mean thickness not under 1.2 mm, mass per area not under 800 g/m2; values by height per Table 4.2.1. Commentary: sheets of HDPE or PP heat-pressed into shape, combining storage and drainage with high stiffness and crush resistance; on planted roofs and basement roofs they carry the soil self-weight and the live loads of backfilling plant, hence the mass and thickness requirements.
2. Slots of boards not laminated with nonwoven (4.1.1) Plastic drainage boards: dimple height not under 8 mm, thickness not under 0.6 mm, mass per area preferably not under 800 g/m2; values per Table 4.1.1, taken from JC/T 2112-2012 plastic protective drainage boards; boards under 0.8 mm mean thickness not preferred. The indices address boards without nonwoven lamination.
3. Thickness by position (3.0.2) Laid horizontally under soil cover, sheet thickness shall be not under 0.8 mm; used vertically as basement wall protection, preferably not under 0.6 mm. (3.0.4 commentary: thickness means the main sheet's film thickness.)
4. Planted-roof build-up (5.3.1) Planted-roof boards sit on the rigid protection layer, preferably high boards of at least 16 mm, dimples down; the boards drain excess percolating water while storing some.
5. Jointing (3.0.4) Drainage boards preferably join by welded laps; drainage (storage) boards preferably by clipped laps.
6. Laying (6.4.2) Roof and basement-roof works shall satisfy: 1 the base flat and clean, obvious hollows or humps levelled with mortar; 2 boards laid fully and flat, gaps not over 5 mm, clipped and lapped, firmly connected; 3 the nonwoven laid loose over the boards, flat and unwrinkled; seams preferably sewn, laps on both sides not under 30 mm, no open seams; with plain laps, not under 100 mm (commentary: sewing preferred to keep fines out of the drainage paths; plain or bonded laps preferably not under 100 mm, kept from parting during backfill).
7. Drainage (storage) materials and laying (JGJ 155-2013) 4.4.1: the performance of dimpled boards and mesh-woven drainage boards per Tables 4.4.1-1 / 4.4.1-2; graded gravel 10-25 mm, pebbles 25-40 mm, layers preferably not under 100 mm; expanded clay 10-25 mm, bulk density preferably not over 500 kg/m3, layers not under 100 mm. To cut roof loads, use light materials - polyethylene dimpled boards and polypropylene mesh-woven boards preferred. 6.5.1: 1 the layer connects to the drainage system; 2 fix the overall drainage direction by the roof slope before starting; 3 lay to the gutter edges or around the outlets; 4 do not damage the root-resistant waterproofing; 5 dimpled boards preferably lapped, laps not under 100 mm; 6 mesh and block boards preferably butted with tidy joints; 7 gravel and clay spread evenly to the design thickness.
8. Shenzhen basis (SJG 19-2019 4.4.13) Filter and drainage layers: 1 boards under the filter laid tightly clipped, continuous and firm, draining freely; 2 granular drainage layers of gravel etc. even and flat, the filtration fabric over them flat, uncreased and undamaged.
Applicability limits
- Two specification sets - choose by board type: drainage (storage) boards (height 12 mm+, mean thickness 1.2 mm+, mass 800 g/m2+) versus non-laminated drainage boards (dimple height 8 mm+, thickness 0.6 mm+, mass 800 g/m2+).
- The 3.0.2 thickness limits (horizontal under soil 0.8 mm+, vertical protection preferably 0.6 mm+) and the 4.2.1 mean thickness (1.2 mm+) are different indices (constructional film floor versus finished-board averages) - do not mix; designs stating 25 mm-high boards and the like execute the design specification, the other indices not relaxed for exceeding the floor.
- Lap widths belong to different standards: board laps (JGJ 155-2013, 100 mm+) versus the nonwoven seams above (DB11/T 1363-2016, sewn 30 mm+ / lapped 100 mm+); one build-up, one standard system, contracts or designs governing where express.
- This card covers material specifications and workmanship, not prices.
Further reading
- DB11/T 1363-2016 Articles 3.0.2, 3.0.4, 4.1.1 (Table 4.1.1), 4.2.1 (Table 4.2.1), 5.3.1, 6.4.2;
- JGJ 155-2013 Article 4.4.1 (Tables 4.4.1-1 / -2), Article 6.5.1;
- SJG 19-2019 Article 4.4.13;
- JC/T 2112-2012 plastic protective drainage boards;
- extensions: green-roof filter geotextile requirements; the cost-volume split and quota items of filter layers and boards.