Engineering Knowledge Cards.
Confidence HighUpdated 2026-10-15

Material performance and laying requirements of the geotextile (nonwoven) filter layer (filtration course) of planted roofs and planted decks

Filter layers preferably take nonwoven geotextile of nominal breaking strength not under 6.5 kN/m (SJG 19-2019 Article 4.3.7); nonwoven filters may be polyester or polypropylene geotextile, mass per area preferably not under 200 g/m2 (DB11/T 1363-2016 Article 4.3.1); combined with plastic drainage boards, polyester nonwoven of 200-400 g/m2 laid on the board dimples, loose over the studs, adjacent laps not under 200 mm bonded or sewn (GB 50208-2011 Article 7.3.6); laid loose over the boards, flat and uncreased, seams preferably sewn (laps 30 mm+ both ways, no open seams; plain laps 100 mm+) (DB11/T 1363-2016 Article 6.4.2).

Applicable Codes

  • SJG 19-2019 第2.0.5条、第4.3.7条
  • DB11/T 1363-2016 第4.3.1条、第6.4.2条
  • GB 50208-2011 第7.3.6条
  • http://fszj.foshan.gov.cn/webpic/W0201903/W020190320/W020190320532987944183.pdf
  • http://www.gd.gov.cn/zwgk/wjk/zcfgk/content/post_4095070.html

Scope of the question

The material performance indices, laying position and lapping requirements of the geotextile / nonwoven (polyester, polypropylene, polyester felt) filter layer (filtration course) of planted roofs and decks (basement-roof greening).

Core conclusions

1. Definition and position (SJG 19-2019 Article 2.0.5) Filtration course: the build-up layer between the waterproof protection layer and the planting soil of planted decks (roofs) that lets water drain freely.

2. Filter material and build-up (SJG 19-2019 Article 4.3.7) Under the planting medium a filter layer shall sit, preferably nonwoven geotextile of nominal breaking strength not under 6.5 kN/m; outlets carry filtration units and drain pipes; under the filter sits a drainage layer of boards, gravel etc. Commentary: the dimpled board sheds surplus water and stores some in the dimples for dry spells; a nonwoven over the drainage layer keeps the medium from washing away.

3. Material and mass (DB11/T 1363-2016 Article 4.3.1) Nonwoven filters may be polyester or polypropylene geotextile; mass per area preferably not under 200 g/m2. The code sets only this quantitative floor (the layer chiefly filters percolating water).

4. Combined with plastic drainage boards (GB 50208-2011 Article 7.3.6) Boards shall pair with geotextile, preferably polyester nonwoven of 200-400 g/m2, laid on the dimples and loose over the studs - retaining soil, filtering and holding moisture; adjacent laps not under 200 mm, bonded or sewn, to keep backfill from tearing the seams and blinding the drainage layer; over cohesive soils, 5-10 mm of coarse sand under the soil keeps the fabric from clogging and preserves permeability.

5. Laying boards with nonwoven (DB11/T 1363-2016 Article 6.4.2) Roof and basement-roof works: 1 base flat and clean, hollows or humps mortared level; 2 boards fully laid flat, gaps not over 5 mm, clipped and lapped, firmly joined; 3 the nonwoven loose-laid over the boards, flat and uncreased; seams preferably sewn, laps 30 mm+ both ways, no open seams; plain laps 100 mm+. Commentary: sewing preferred to keep fines out of the drainage paths; plain or bonded laps preferably 100 mm+, prevented from parting during backfill.

Applicability limits

  • Not under 200 g/m2 is the mass floor; Shenzhen adds the 6.5 kN/m strength floor; designs stating 300 g/m2 polyester felt must meet both strength and lapping-laying requirements (stricter designs govern).
  • Lap widths belong to different standards: with plastic drainage boards per GB 50208-2011, 200 mm+; in board works per DB11/T 1363-2016, sewn 30 mm+ / lapped 100 mm+. One layer, one standard system; express contracts or designs govern - no mixing.
  • The filter (filtration) course filters, retains soil and holds moisture; it does not replace the waterproofing's root-resistance or full-bond anti-tracking performance.
  • These are material requirements, not prices.

Further reading

Keywords

  • 滤水层
  • 过滤层
  • 无纺布过滤层
  • 土工布单位面积质量
  • 搭接宽度
  • 种植屋面
  • 塑料排(蓄)水板
  • 滤水层材料要求

Cited By