Waterproof protective layer (protection over membrane waterproofing): quantity calculation, BOQ itemization, and norm application — roof, floor, and foundation positions

Protective layers are computed by design-shown area (m2) (DB11/T 2382-2024, 4.10.27): roofs follow the roofing caliber (flat roofs by horizontal projection, sloped by slope area; upturns and gutters merge, 4.10.20); floors do not deduct partition walls and single <= 0.30 m2 columns/piers/holes, upturns <= 300mm merge (4.10.25); > 300mm executes wall waterproofing (4.10.16); foundation upturned beams merge by developed area (4.10.26). In BOQs, roof protection uses "rigid roofing layer" with its function described (GB/T 50854-2024, J.6.5); foundation/floor fine-stone concrete protection uses "fine-stone concrete floor" (J.6.11); reinforcement mesh listed separately (J.6.12); Beijing lists protective-layer items separately (2021: 9-265~267; 2024: A-9-264~267), all in m2.

Applicable Codes

  • DB11/T 2382-2024 · Standard for Construction Consumption of Construction Works (Beijing) 第4.10节(屋面及防水工程)
  • GB/T 50854-2024 · Standard for measurement of building construction and fitting out works App. J(第J.6.5、J.6.11、J.6.12条、Table J.2.1、Table J.4.1)、App. L(Table L.1.1)

Topic Positioning

Quantity calculation, BOQ itemization, and norm application for protective layers over (membrane) waterproofing — a reusable three-layer "takeoff -> itemization -> norm application" rule set covering roof, floor, and foundation positions.

Core Conclusions

1. Takeoff: by design-shown area (m2), not volume Beijing DB11/T 2382-2024, 4.10.27: "Waterproof protective layers and joint sealing: (1) protective layers by design-shown area; (2) sealing by design-shown length." By position:

  • Roof (4.10.20): sloped roofs by slope area, flat (incl. sloping-to-drain) by horizontal projection; areas of roof chimneys, vent bases, ducts, small skylights, and valley gutters are not deducted, nor are upturns added; upturns at parapets, expansion joints, and skylights merge into the roof quantity; valleys, eaves gutters, cantilevers, and canopies merge by developed area.
  • Floor (4.10.25): by design-shown area, no deduction for partition walls or single columns, piers, chimneys, holes <= 0.30 m2; upturns <= 300mm merge into the floor; > 300mm executes wall waterproofing (4.10.16).
  • Foundation (4.10.26): by design-shown area, upturned (counter) beams merge by developed area; pile-head waterproofing by count; waterproof fabric by area; waterstops by length.

2. Itemization: the protective layer is an independent BOQ item, not merged into waterproofing GB/T 50854-2024:

  • J.6.5: roofing screeds, protective layers, and rigid isolation layers are coded as "rigid roofing layer" with the function described in characteristics; roof insulation formed slopes and integrated waterproof-insulation roofs use Annex K "insulated roofs".
  • J.6.11: wall waterproofing screeds use Annex M "vertical mortar screed"; floor and foundation screeds use Annex L screed items; foundation fine-stone concrete protection uses Annex L "fine-stone concrete floor".
  • J.6.12: factory mesh and wire mesh use Annex E "reinforcement mesh"/"wire mesh"; other reinforcement uses "reinforcement in rigid roofing layer".

3. Norm application: Beijing lists "waterproof protective layer" items separately, unit m2

  • 2021: 9-265 mortar DS pea-gravel concrete, 9-266 mortar DS polyethylene foam, 9-267 mortar DS polystyrene board;
  • Current 2024: A-9-264~267, split into mortar / pea-gravel concrete / polyethylene foam / polystyrene board types.

4. Common errors

  1. Protection and waterproofing are two independent items — same drawing scope but never mutually inclusive;
  2. Floor upturns > 300mm belong to "wall waterproofing" — the protection there itemizes by wall position;
  3. Mesh/wire in the protection itemizes separately (factory mesh via Annex E, other via "reinforcement in rigid roofing layer").

Applicable Boundaries

  • Takeoff and norm calibers per Beijing DB11/T 2382-2024; non-Beijing follows local standards; itemization per the national GB/T 50854-2024.
  • Protective-layer type, thickness, upturn heights per drawings; 300mm is the floor-vs-wall item boundary.
  • BOQ and consumption calibers are two records: roof waterproofing under Table J.2.1, floor waterproofing under J.4.1, fine-stone protection under L.1.1 — different deduction/merge rules, do not mix.
  • Insulation-formed slopes and integrated waterproof-insulation roofs do not use "rigid roofing layer" — Annex K applies.

Further Reading

  • DB11/T 2382-2024 Section 4.10: 4.10.16, 4.10.20, 4.10.25-4.10.27 (also 4.10.15 cold-bond and 4.10.18 sealing coefficients).
  • GB/T 50854-2024 Annex J: Tables J.2.1 (010902), J.4.1 (010904), J.6.5/J.6.11/J.6.12; Annex L Table L.1.1 (011101).
  • Beijing item consumptions: 2024 A-9-264~267, 2021 9-265~267.