Decision path for selecting quota line items: item description matching -> direct application -> adjusted application -> similar construction process -> supplementary quota item submitted for approval
Applying a quota line item starts with matching "item description (work item specification) + work content": where fully consistent, apply directly (labour/material/machinery consumption taken from the line item, prices taken as market prices at the compilation date, on-costs per the matching norms for on-costs and expenses); where technical conditions differ greatly, apply with adjustment per the quota provisions; for missing items, preferentially refer to quota norms for similar construction processes (cross-industry/local allowed); where no reference exists, compile a supplementary quota item per the project's technical conditions and submit it to the quota administration agency for approval. Red lines: applying a higher-grade quota item and splitting processes for double counting are prohibited.
Applicable Codes
- GB/T 50860-2024 构筑物工程工程量计算标准
- GB/T 51095-2015 建设工程造价咨询规范
- DL/T 5468-2013 输变电工程施工图预算编制导则
- DL/T 5469-2013 输变电工程可行性研究投资估算编制导则
Topic Positioning
Which quota line item a construction item should apply: the decision path of "item description (work item specification) + work content" matching with step-down handling of missing items, applicable to rate build-up under both BOQ-based pricing and quota-based pricing.
Core Conclusions
Four steps in progression: ① Description first — the item description (work item specification) is an indispensable basis for determining the all-in unit rate and must be described accurately and completely; the appendix work content lists main content only, and auxiliary content such as machinery movement and material transport is deemed included; processes must not be split into separately listed BOQ items (GB/T 50860-2024 Clause 4.1.2). ② Description matches -> direct application: labour/material/machinery consumption taken from the line item, prices taken as market prices at the compilation date, on-costs charged per the matching norms for on-costs and expenses (GB/T 51095-2015 Clause 5.3.9). ③ Large differences in technical conditions -> adjusted application per the quota provisions, which requires a quota basis. ④ Missing item -> preferentially refer to quota norms for similar construction processes; where no reference exists, compile a supplementary quota item based on budget/settlement data of similar projects or the project's technical conditions, and submit it to the quota administration agency for approval before use (DL/T 5468-2013 Clause 4.1.4). Red lines: applying a higher-grade quota item (e.g., applying C30 where C25 is used) and splitting processes for double counting are prohibited.
Applicable Boundaries
Applies to rate build-up for divisional/sub-divisional works at the construction contracting stage. Line-item division and on-cost bases differ across industries; when referencing similar line items across industries, on-costs follow the industry basis of the quota applied; supplementary quota items are submitted for approval through the industry's channel. This card only answers "which line item to apply"; conversion and supplementary quota item compilation details are in the referenced cards.
Further Reading
GB/T 50860-2024 Clause 4.1.2; GB/T 51095-2015 Clauses 5.3.9, 5.3.12; DL/T 5468-2013 and DL/T 5469-2013 Clause 4.1.4.
Keywords
Related Cards
- →
Six-step labour-material-plant analysis for the all-in unit rate: apply quota line items -> take consumption and compilation-period unit prices -> add management fee and profit -> fill the all-in unit rate analysis sheet
Labour-material-plant analysis splits the all-in unit rate by "consumption x unit price" into three direct costs — labour cost, material cost, and plant and small tools cost — then superimposes management fee, profit, and the agreed risk cost; consumption is taken from quota line item factor values, unit prices from the report compilation-period market prices / published price information (government guidance prices), and fees per the matching norms for on-costs and expenses (GB/T 51095-2015 Clause 5.3.9). The analysis sheet must be fully consistent with the BOQ all-in unit rate (GB/T 50500-2024 Clause 3.1.7), in the form of Appendix E.2.2.
- →
Preparing supplementary quota items (supplementary unit-rate build-up schedules): trigger conditions, consumption measurement, base price composition, industry approval, and distinction from supplementary BOQ items
Where the budget quota norms do not cover a work item and no similar sub-item can be applied, prepare a supplementary unit-rate build-up schedule per the compilation principles and methods of the budget quota norms (supplementation is the last resort — prefer adjusted application of existing quotas or similar quota items first; the power industry requires approval by the quota administration; railway supplementary unit-price analyses are copied to the industry standards administration, and passenger station buildings etc. may adopt provincial local quota norms instead). Labour consumption = basic labour + extra-haulage labour + auxiliary labour + labour margin, measured by work-study recording / time measurement; materials = net quantity × (1 + wastage rate), turnover materials by amortized quantity; base price = labour cost + material cost + machinery cost, with management fee, profit, statutory levies and fees, and taxes added for the all-in unit rate. A missing BOQ item is a listing-level matter: supplementary item codes use the standard code + B + three digits (e.g., from 07B001) and are filed with the provincial administration.
- →
Conversion judgment and methods when a quota item's work content differs from site reality (no conversion for aggregated content; convert by difference type; supplementary valuation for missing items; "换" mark traceability)
Before converting, judge "whether conversion is allowed": content already aggregated in the quota (formwork support content aggregating steel/wood props, external scaffolding aggregating ramps/loading platforms, on-site handling already included) may not be adjusted even if inconsistent with reality; adjustment is allowed only where technical conditions differ significantly from the quota's basis. Convert by difference type: coefficient adjustment; strength grade / mix-proportion conversion (per mix tables or formulas); thickness increment/decrement items; material substitution (bracketed materials priced separately, ready-mixed concrete deducting mixing-equipment consumption). Missing items are not converted — prepare a supplementary unit valuation table per the quota compilation principles (GB/T 51095-2015 Clause 5.3.12); converted quota codes must carry the "换" mark for traceability.
- →
Avoiding mispricing when material names are similar but specifications differ: three lines of specification-checking defense across preparation, pricing, and audit
The three forms of mispricing (specifications missing from item characteristics, near-name mismatches, missing specification/unit dimensions) can be intercepted by three lines of defense: at preparation, write full specifications and models into the item characteristics (GB/T 50500-2024 Clause 4.2.2); at pricing, check the quota item's bracketed specification against the drawings + match material price on three fields simultaneously — name/specification/unit (do not pick the published price directly; mark conversions with "换"); at audit, use same-name specification gradients (C30>C25, DN32>DN25) to back-detect mismatches.
- →
How to build up rates for additional works with no applicable quota norms: the progressive path of apply → convert → cost-plus-profit → market price enquiry
For additional works or variation items with no quota norms to apply, rate build-up follows the progression "identical items use the contract unit rate → similar items are converted and adjusted → quota norms for similar technology are adjusted in applying quota items, or supplementary quota items are compiled → rates are re-derived on a cost-plus-profit basis → confirmed by market price enquiry → a supplementary agreement is negotiated and signed by both parties"; the order of price sources is contract-agreed information sources → published price information (government guidance prices) issued by the construction cost administration or industry bodies (tax-exclusive) → contractor procurement unit prices confirmed by both parties; additional works are works outside the contract and are not necessarily bound by the original contract unit rates — submit for review before implementation, with the contractor bearing the burden of proof.
Cited By
- ←
Selecting quota items for metal decorative mouldings (stainless steel strips, aluminium alloy grooved strips): two measurement conventions - finished moulding installation by linear metres (centre-line length) versus site-fabricated structural steel framing by weight in tonnes - with item numbers and chapter positions in each system, separation of main-material and installation costs, the boundary against drip grooves, drip noses and plaster mouldings, and adjustment coefficients for curved mouldings
Metal decorative mouldings split into two conventions - 'finished moulding installation' and 'site-fabricated framing/steel members': moulding items whose work content is only setting out, lining, cutting to size, drilling (timber plugs), gluing, installing and fixing are measured by linear metres - bill basis GB/T 50854-2024 table Q.2.1 item code 011502001 'finished decorative mouldings', unit m, computed at the centre-line length of the design dimensions, work content 'installation' only; the railway TB/T 10831-2024 volume 10 items FY-1933 to FY-1948, unit 10 m. Framing items whose work content includes straightening and correcting sections, lofting, cutting, welding and anti-corrosion oil (railway FY-1470 to FY-1472 wall/column aluminium/steel/stainless framing, FY-1528 ceiling structural steel joists) are measured by weight in t. Drip grooves, drip noses and decorative beads formed on site in cement mortar run plastering items (railway FY-1352 plaster mouldings, FY-1969/FY-1970 cement mortar decorative beads; Tianjin table M.2 item 2-140 external elevation decorative-band general plastering) and must not be double priced against finished metal mouldings.
- ←
Quantity take-off and double-counting prevention for field joint coating and damage repair of factory-prefabricated anti-corrosion pipes: whole-pipe anti-corrosion quota line items must not be re-applied; joint coating counted by weld count (per joint/spot) with per-joint nominal length converted to area; damage repair graded by damage size; dual-track pricing of BOQ m2 versus quota joints
The factory-applied anti-corrosion coating cost is already inside the material price of finished coated pipes, so only field joint coating and damage repair may be counted on site; painting, anti-corrosion coating or coal-tar epoxy quota line items must not be applied again over the whole pipe length or surface (GB/T 50856-2024 clause 3.0.8 opens an exception only for painting the design expressly requires to be completed on site and for repainting in reconstruction or extension projects; DB11/T 2382-2024 clauses 7.4.52 and 7.4.53 confine field anti-corrosion to the joints - heat-shrink sleeves and three-layer polyethylene heat-shrink tape are measured by weld count, and coating-type joint methods take the same-scope line item with labour x 1.10). Joint coating count = number of girth welds (standard-length sections - 1, plus fittings, valves and tie-in joints); developed area per joint = pi x pipe OD x nominal length per joint (400 mm for OD no more than 426 mm, 600 mm for OD above 426 mm); the BOQ item is measured in m2 of design-shown surface area per GB/T 50856-2024 table M.9.1 (code 031209) while the quota counts per joint/spot, so units must be converted before pricing; damage repair is treated per spot, graded by damage depth and puncture size (GB/T 50538-2020 clause 8.5.1).
- ←
Algebraic decomposition and value chain of the vertical transportation cost (V = SUM of gross floor area / quota unit x line-item base price; c = machine-shift content; q = quota unit / machine-shift content; banding by eave height x structural type x storeys), plus the cross-band conversion and multi-eave-height splitting rules when the eave-height boundary moves
The vertical transportation cost accrues band by band as area x banded unit price: V = SUM_i (Ai / u) x Pi (u is usually 100m2); the base price Pi = SUM(machine-shift content ci,m x plant rate per machine-shift pm) + SUM(workdays ri,l x daily labour rate pl). The machine-shift output quota and the machine-shift content are reciprocals, qi,m = u / ci,m; total machine-shifts Ni,m = (Ai / u) x ci,m. Crossing the base band: V = (A / u) x (P(base band) + k x P(per added band)), where k is the number of added bands derived from the excess height under the carry rule (each added 10m band: where the excess is under 10m, more than 5m counts as one band, 5m or less counts none). For one building with different eave heights, split vertically, measure the gross floor area separately and band each part by its own eave height.
- ←
Units of measurement for installing fans, fan coil units and air handling units (all measured per unit, computed from the quantities shown on the design drawings), comparison of tiering parameters (model, equipment weight, air volume, installation method) across the standard systems, and the cost boundary between installation of the equipment itself and base grouting, supports and height-related inefficiency
Installation line items for the three equipment classes are all measured per unit from the design drawings, so the unit itself is not in dispute - the disputes are all about the tiering parameters. The fan tiering basis varies with the standard system: the civil-building ventilation and air-conditioning volume tiers by fan type/model + installation method (DB11/T 2382-2024 clause 6.1.37 states that 'fan installation for general industrial and civil building works shall follow the corresponding ventilation and air-conditioning items'); industrial fans go to the machinery installation volume and tier by equipment weight (clauses 6.1.33 and 6.1.39; direct-drive includes body + motor + base, non-direct-drive excludes the motor); the railway building works volume tiers by air volume (TB/T 10831-2024 FY-2635 to FY-2646) and the railway motive power and rolling stock volume by equipment weight (TB/T 10833-2024 JY-1174 to JY-1177); fan coil units tier by installation method (clause 6.7.11), with induction units and multi-split indoor units absorbed into the fan coil items (clause 6.7.7); combined air handling units tier by cooling capacity or air volume (clause 6.7.10), with fresh-air units absorbed into the combined AHU items (clause 6.7.8). Base concreting goes to the building and finishing works volume and secondary grouting to machinery installation (clause 6.7.1); supports and packing supplied with the equipment are included in its installation, site-fabricated supports by weight and fan hangers by model (clauses 6.7.5 and 6.7.24).
- ←
Fixing the quota home of communication cables in low-current systems: separating control cables / multicore flexible cords / twisted-pair cables / telecom optic-electric cables by the product standard behind the type code, with laying items banded by 'method + section + cores', conversion factors, and the treatment of screened and armoured constructions
Fix the product identity first, then the item - never the system it serves or the signal it carries: KVV / KVVP / KVV22 / KVVR (GB/T 9330.2 plastic-insulated control cables) run the electrical 'control-cable laying' items, banded by method + single-core section + core count; RVV / RVVP (JB/T 8734.3 flexible cords) run the 'multicore flexible cord' wiring items (drawn into conduit / laid in trunking, trays and on brackets), screened cords on the same items with labour x 1.20, sheathed cords over eight cores in conduit reverting to control-cable items; twisted-pair and large-pair-count cables are structured cabling, on the intelligent-building 'twisted-pair / multipair' items; local telephone cables belong to the information-communication volume's 'optic (electric) cable laying'. Under DB11/T 2382-2024 clause 6.4.54, screening, armouring and flexible construction never open separate laying items (only cable terminations split armoured / unarmoured); compiled on three-core (three-core-with-earth) copper, five-core x 1.15, single-core x 0.67, aluminium or alloy x 0.67.
- ←
Attributing the ironmongery of proprietary doors and windows (hinges, locks, handles, closers, coordinators): the list basis folds it into the door's all-in rate with no separate item, while quota bases split by their door-and-window chapter notes - 'proprietary with ironmongery / hinges only / ordinary in, special out' - with special ironmongery on separate items
Two bases decide 'included or not': the list basis (GB/T 50854-2024 Appendix H) holds hinges, pivots, handles, locks, latches, stops, closers, rollers and tracks, floor springs and the like as inherent to the door - folded into the all-in rate, never listed apart, save 'locks installed alone' at 010801006 per set; where the item description omits ironmongery, clause 4.1.2 ('deemed to include all work necessary') with GB/T 50500-2024 clause 3.3.3 bars both separate listing and claims. The quota basis reads the chapter notes of the volume applied: Beijing 4.9.3 - metal doors carry their matched ironmongery, fire doors exclude locks / closers / hinges / coordinators / concealed latches; Jiangsu and Shaanxi timber-door items carry hinges only, the rest on special-ironmongery items; Shenzhen's proprietary fire doors carry all - the same project may flip conclusions between systems.
- ←
Deciding the relation between bell-and-spigot joints and rubber-ring joint items: joint nature (rigid cement caulked / flexible rubber ring) -> quota basis (joint inside the pipe-laying metre, or a joint item counted per piece) -> whether the ring double-charges, split by pipe material (cast iron / reinforced concrete / plastic) and quota system
Bell-and-spigot is only an end construction, never a pricing basis: cement or asbestos-cement caulked joints (oakum packing included) are rigid; rubber rings, flanged gland plus ring, and clamp plus ring are flexible. Where the joint method is written into the pipe-laying item's name or work content, it is inside the metre-priced laying - never add a 'ring joint' item; only where the quota lists joints as items (railway pipe-jacking joints PY-407~PY-414; municipal collar joints / caulking) do joints count per piece or per ten. Rings as joint auxiliaries already sit in the item's materials (ductile iron laying lists rubber ring at 0, i.e. supplied none extra); pipe main materials outside the base price price separately per the annex table - rings never charge twice.
- ←
Steel cover plates for trenches (channel troughs): quota-system attribution of steel grating covers versus chequer-plate covers, line item selection, measurement-unit conventions, whether the main material is priced separately, separate billing against the trench body, and the distinction from manhole-cover items at inspection chambers
For steel cover plates, first identify the applicable system, then pick the line item: steel covers laid continuously along a trench follow the metal-structures basis - self-fabricated covers (steel included) are measured in t for fabrication plus erection, while proprietary grating covers are measured in m2 for erection only with the main material priced separately; cast iron or composite covers at inspection chamber openings are counted per piece or per set, and the two systems must not be cross-applied. The structures BOQ bills trench base slabs, walls and cover slabs separately (the cover is a stand-alone item); masonry trench line items carry only blockwork plus joint pointing, so the cover must be billed separately, whereas the all-in trench item measured by m already includes 'trench cover fabrication and erection' in its work content and must not be re-billed. Section-steel edge frames and angle stiffening frames of covers are merged into the cover quantity in t by theoretical mass, and grating apertures with a single-opening area of no more than 0.30 m2 are not deducted.
- ←
Deciding when firestop collars are required on plastic drainage pipes (GB 50015-2019 clause 4.4.10 and the fire-code family), measurement per piece and BOQ / quota item application (including the dedicated items of Beijing DB11/T 2382-2024 with the collar as main material priced by pipe size), and the pricing boundaries against floor-penetration sleeves and firestop sealing materials
Firestop collars on plastic drainage pipes measure per piece ('ge'), banded by main-pipe / nominal diameter, counted as shown on the design: DB11/T 2382-2024 clause 6.10.44 - collar installation counts by main-pipe diameter as shown - with dedicated items under Table C.10.25-6 (DN50 -> C10-4-82, DN100 -> C10-4-84, unit 'piece', work content marking, drilling, setting, bolting, collar installation), the 'firestop collar' main material listed separately at 1.0000 piece per piece. GB/T 50856-2024 Appendix K Table K.2.1 (pipe accessories, 031002) and the local list guide Table N.1 (other and ancillary works, 031301) set no dedicated collar item - add a supplementary item (last three digits 801~999) or fold into the plastic drainage pipe's all-in unit rate. The setting test is not a blanket 'DN110': GB 50015-2019 clause 4.4.10 requires collars on both sides of fire walls (no diameter threshold); in high-rise buildings, exposed soil stacks of dn110 and over crossing floors take a collar below the slab (all three preconditions); pipes crossing shaft walls take collars outside the shaft wall; GB/T 51410-2020 clause 5.2.4 adds that pipes over 50mm nominal take a collar or firestop wrap below vertical penetrations or on both sides of horizontal ones.
- ←
Selecting quota items for TDF (integral thin-sheet-steel flange) ducts and treating the fabrication part: dedicated items first, borrowing and conversion rules where none exist, the main-material treatment of corner clips and spring clips, and the cost-gap make-up against angle-steel flanges
TDF ducts take the dedicated 'TDF duct fabrication and erection' items first (DB11/T 2382-2024 Table C.7.16, C7-2-87~C7-2-91, per m2, work content already including 'fitting corner clips and spring clips', fabrication and erection in one) - the fabrication part is never borrowed out. Systems without dedicated items run the like flanged-duct items per the volume notes (SJG 111.3-2022 clause 4.1.7 note 8: 'where flange-less connection items are used, no adjustment'), never self-applied experience factors; conversion factors come only from the notes' express text (tapered uniform-supply ducts labour x 2.50, air-curtain ducts labour x 3.00, curved ducts labour and materials x 1.12); true gaps borrow from similar processes with a paper trail or compile supplementary unit-rate build-up schedules for approval. Ducts, valves, diffusers and other main materials list in brackets, never as the base of sundry-material rates.
- ←
Quota line item classification for factory-finished spiral welded steel pipe (large diameters DN800/DN1000): apply the low-pressure carbon steel plate-rolled pipe (spiral rolled pipe) installation item with the pipe as an unpriced principal material; do not apply the finished carbon steel pipe installation item, and do not add any pipe rolling fabrication item
Under Chapter 6.8 of DB11/T 2382-2024: low-pressure spiral rolled pipe installation shall follow the corresponding carbon steel plate-rolled pipe items (6.8.16), and the pipe is an unpriced principal material (shown in brackets under 6.8.13). When factory-finished spiral welded pipe arrives on site for direct installation, only the installation item applies; no pipe rolling fabrication item may be added (the chapter contains only 'pipe fittings fabrication' items 6.8.80-6.8.82, with no pipe-body fabrication item). Large diameters DN800/DN1000 exceed the size bands of the finished carbon steel pipe installation items; borrow the nearest band of the plate-rolled / spiral rolled pipe installation items at the same pressure class and connection type. Upgrading to higher-priced items and splitting fabrication from installation for double counting are both prohibited.
- ←
Quota application for the erection cost of vertical storage tanks (metal oil tanks) built by the reverse jack-up method with hydraulic lifting: line-item selection by construction form and capacity class, measurement by shell metal weight in t, lifting gear and temporary stiffening to preliminaries, and NDT and the water filling test charged separately
The reverse jack-up method has no standalone line item in the erection consumption quota: the item is selected by 'tank type x shell construction form (lap-jointed / butt-jointed) x capacity class' and measured by shell metal weight in t (no deduction for the area of openings in the shell, and including bottom plates, shell plates, roof plates, curb angle, stiffening rings, wind girders, and shim and reinforcement plates); where only one tank is built on one site, labour and plant consumption is multiplied by 1.25 (materials not). Neither the plant schedule nor the work content of the items contains a lifting step, so the hydraulic lifting devices and the temporary stiffening of the reverse method are charged as preliminaries; the work content stops at 'leak testing' - shell weld NDT, the water filling test and foundation settlement monitoring are outside the items and must be listed separately.
- ←
Pricing of steel-framed glass daylighting roofs (glass skylights): the daylighting sub-items include the framing, spider-fitting installation transfers to the curtain-wall chapter with labor x 0.90, and independent steel supporting frames are itemized separately in tonnes under metal-structure works (Beijing DB11/T 2382-2024 basis)
One decisive rule governs glass-daylighting-roof pricing - Beijing DB11/T 2382-2024 Clause 4.10.5: the construction consumptions of daylighting roofs are determined as required by the design drawings and include the work content of the framing (frame); the glass together with its accompanying framing is priced under one daylighting sub-item (A-9-46 aluminium framing / A-9-47 steel framing; the work content already includes framing fabrication and installation, protective paint, and sealant application), the framing not being itemized separately; spider-fitting installation transfers to the curtain-wall chapter (4.13) with labor x 0.90 and framing/hardware/skin itemized separately; independent supporting steel frames beyond the scope of the "framing (frame)" (steel skylight trusses, steel beams etc.) are itemized separately by mass (t) under A.6 Metal-Structure Works, with anti-corrosion and fireproof coatings charged separately (4.7.11).
- ←
Determining missing items not listed in the BOQ appendices and setting supplementary items: the three-element comparison search path, the discipline-code + B coding rule (from 01B001), the five required accompanying elements, the tender-document explanation / filing requirements, and the boundary of error when fitting near-match items
Under GB/T 50854-2024 Clause 4.1.4, for items not covered in Appendices A~R the compiler may add supplementary items, coded with this standard's code 01 plus B and three Arabic numerals, numbered sequentially from 01B001, and must attach the item name, item description, unit of measurement, quantity take-off rule and work content (for preliminaries that cannot be measured: name, work content and scope of inclusion). The determination is a three-element comparison (item description + work content + unit of measurement with calculation rule): so long as any element can be carried by an existing appendix item, the existing item must be applied forward and the difference expressed in the item description, and no supplementary code may be created; work content lists only principal operations, auxiliary content such as plant movement and material transport is deemed included, and operations may not be split out and listed separately unless specifically stated. The 2024 editions (GB/T series) say 'may add' and no longer require filing; instead GB/T 50500-2024 Clause 3.1.3 requires the supplementary basis to be explained in the tender and contract documents; the 2013 compulsory national standards required 'shall add + file with the provincial or industry construction cost administration institution', and local standards may still retain the filing requirement.
- ←
Cost split and variation difference formula for changing rebar from tied lapping to straight-thread mechanical connection: lap length and deductible steel quantity, new coupler and thread-cutting costs, labour changes, joint sampling and testing costs, plus the measurement bases for rebar quantity and joint count and the wastage rate
Changing rebar from tied lapping to mechanical connection is split across four accounts: (1) deduct the lapped steel quantity = joint count x lap length ll x unit theoretical mass (ll = zl x la, the correction factor taken per GB 50010-2010 clause 8.4.4 and the lap no less than 300mm), with the material cost deduction multiplied by (1 + wastage rate; fabrication wastage and spacer bars such as chairs are best taken at 5%); (2) new straight-thread coupler and thread-cutting cost = joint count x all-in rate per joint, or rate build-up from the quota line item consumptions (e.g. DB11/T 2382-2024 item A-5-113: labour 0.0250 workdays per joint, couplers 1.0100 nos per joint); (3) labour up and down: the new thread-cutting labour follows the item labour consumption, while tying labour is normally already included in the installation item and is not deducted separately; (4) joint sampling and testing costs are taken per JGJ 107-2016 technique inspection (no fewer than 3 specimens per bar specification) and site inspection (500 joints per acceptance lot, 3 specimens drawn, retest of 6 where only 1 fails) and split under the testing-cost attribution rules. The variation difference = new joint cost + labour delta - deducted lap steel quantity x rebar unit price x (1 + wastage rate); positive means an increase to the contract price, negative a decrease. The joint count is measured as the design-shown quantity (9m per joint for bars over d10, 12m per joint for bars up to d10, by stock-length interval), and no additional lap steel is measured for mechanical connections.
- ←
Classification basis and table numbers for soil and rock on site (soft rock / hard rock / boulders), the threshold position on measuring boulders as rock, and the price adjustment boundary where the actual class differs from the BOQ item description
BOQ item descriptions are entered per Table A.4.3-1 of GB/T 50854-2024 (soil classes 1-4, judged by soil name plus excavation method) and Table A.4.3-2 (extremely soft rock through extremely hard rock); where classes cannot be fixed precisely, describe from the geotechnical investigation report. The quota-system classes 'loose rock / sub-hard rock / ordinary hard rock / extra-hard rock' (Protodyakonov I-XVI) are not listed in the BOQ classification tables and must not be entered as item descriptions. Boulders: the building works position has only a qualitative boundary - clearance of natural obstructions 'removable together with the earthworks' is already inside the earthwork items, while boulders needing separate breaking or crushing are listed separately as rock or handled as missing items or variations; the water sector position expressly measures boulders larger than 0.7 m3 as rock excavation. Where the class differs from the BOQ description, under a unit-rate contract the all-in unit rate is re-determined on the item description actually constructed (GB 50500-2013 clause 9.4.2), with a 15% quantity deviation as the boundary for rate adjustment (clause 9.6.2).
- ←
Key points for the item description of earthworks BOQ items: how to set soil class and rock class (tables A.4.3-1 and A.4.3-2), the optional dry or wet soil supplement, the geotechnical investigation report as fallback, and the GB/T 50500-2024 compilation requirements for coding, names, descriptions, units and work content plus the itemisation principles
GB/T 50854-2024 A.4.3: soil class and rock class are set per table A.4.3-1 and table A.4.3-2, with dry or wet soil descriptions added where needed; where the class cannot be accurately determined, the description is based on the geotechnical investigation report. Item descriptions, together with coding, item names, units of measurement and work content, must be compiled per the national and industry quantity take-off standards (GB/T 50500-2024 clause 4.1.7); itemisation follows 'clear, unambiguous boundaries, easy to price and pay', with codes preferably ascending (clause 3.1.4); the description entries are governed by the exact wording of tables A.1.1, A.2.1 and A.3.1, and disposal of surplus excavated material is a separate item under table A.3.1, not an incidental entry in the excavation item's description.
- ←
Beijing "Construction Consumption Standard" DB11/T 2382-2024 - method of applying water-supply-and-drainage plastic-pipe sub-items banded by "nominal diameter (mm inclusive)": convert the de value on the drawings to DN before selecting the band (de110 -> DN100 band)
The water-supply-and-drainage plastic-pipe sub-items of DB11/T 2382-2024 are banded by "nominal diameter (mm inclusive)"; a plastic pipe marked de110 on the drawings corresponds to the DN100 band (indoor polypropylene silent drainage pipe C10-2-115 and outdoor drainage plastic pipe with fusion jointing C10-1-65 are both the within-100 mm bands, and the accompanying rubber rings / fusion couplings are all DN100) - convert by the DN-de correspondence before selecting the band; do not take the de value directly as the nominal diameter and pick the nearest band.
- ←
Cable laying in vertical shafts (electrical risers): choosing the quota line item, the labour factor adjustment, and pricing the shaft and horizontal sections separately (including where reserve lengths sit and the link to the BOQ code)
DB11/T 2382-2024 clause 6.4.59: cable laying in vertical shafts does not distinguish whether floors exist within the shaft - it follows the corresponding cable laying items, with labour consumption preferably multiplied by a factor of 1.30 (the 2021 edition said labour workdays multiplied by factor 1.3); the factor adjusts labour only and acts on the shaft section only, so one cable must be priced in a shaft section and a horizontal section under separate line items - multiplying the whole cable on the shaft basis does not hold; pre-fabricated branch cables are already comprehensively measured for shaft laying and take no factor; the cable laying length already includes reserve (additional) length, and no separate item is listed; on the BOQ side cable installation is Table D.9.1 code 030409, and shaft laying is a different item description from other laying methods.
- ←
Labour cost pricing basis within the all-in unit rate: norm-based labour cost (base-period workday rate) versus current-period published labour price information and labour market prices, the applicable rules at the tender price ceiling and tender stages, and the test that the labour cost differential and the labour cost inside the all-in unit rate are not adjusted twice
Labour cost in the all-in unit rate = norm (budget) labour consumption x the current-period labour rate (published price information or a market price confirmed by the parties): consumption is locked to the quota manual while the rate is opened to the current-period market (GB/T 51095-2015, clause 5.3.9). The base-period workday rate published with the quota manuals is not itself the pricing input for BOQ rate build-up; it is a component of norm-based labour cost and the comparison base of the labour cost differential. At the tender price ceiling stage the published labour rates / published price information take precedence (GB/T 50500-2024, clauses 5.2.1 and 5.2.8); the tender is priced freely by the tenderer on its in-house norms and the market, but not below cost and not above the tender price ceiling (clauses 6.1.1, 6.1.3, 6.2.1). Differentials caused by changes in costs carry VAT only, not overheads or profit (clause 3.3.5); the same labour differential may be taken once only, in either the current-period-price pricing system or the base-period-price-plus-differential system, and must not be stacked on the labour cost already inside the all-in unit rate.
- ←
Choosing the format of the all-in unit rate analysis sheet, its mandatory preparation requirements, and its roles across tendering, settlement and audit (GB/T 50500-2024 Appendix E, tables E.2.2-1 and E.2.2-2)
GB/T 50500-2024 Appendix E provides that detailed all-in unit rate analysis shall follow table E.2.2-1 and simplified analysis table E.2.2-2, the choice being fixed by the tender requirements and the contract; the rates in the analysis sheet and the prices of lump-priced items must be 'completely consistent' with the corresponding figures in the BOQ (clause 3.1.7); at tender the sheet, together with tables E.3.2, E.3.3 (which must list initial set-up, mid-term operation and final dismantling costs) and E.3.4, must be submitted in full, consistent with the priced BOQ (clauses 6.2.12 and 6.2.13). The all-in unit rate carries risk costs within the agreed scope and bands and excludes VAT (clauses 2.0.9 and 3.2.2), so the risk allowance sits inside the rate build-up rather than as a stand-alone charge. At settlement, clause 3.1.6 requires item-by-item checking that rates match the priced BOQ in the contract, with no adjustment except for variations and agreed matters; dayworks and additional works may draw on 'the detailed price make-up in the all-in unit rate analysis sheet of similar BOQ items' (clause 8.6.3; cost expert assessment guideline clause 4.8.4); audit examines whether new rate build-ups follow the quota pricing rules agreed in the contract, whether every line-item price is fixed, and whether common material prices are reasonable.
- ←
Comparative review of the all-in unit rate of one BOQ item under two construction methods: the three-identity sameness test, quantity-price separated line-by-line comparison sheets, attribution on unit output (machine-shift consumption), build-up compliance anchors, method-price consistency checks, and detection of unbalanced rates
First run the three-identity test (BOQ code + item description + unit of measurement) to confirm it is the same BOQ item; if not, price under the GB/T 50500-2024 clause 8.9.1 variation valuation rules. Then attribute the rate gap line by line, quantity separated from price, to consumption and price gaps in labour, materials and plant and to overhead and profit rate gaps; plant cost must be reduced to unit output (machine-shift rate x machine-shift consumption per unit of quantity), not compared on machine-shift rates alone, and machine models and shifts must also close against the plant allocation in the method. Compliance anchors: the analysis sheet fully consistent with the priced BOQ rate (clause 3.1.7), not below cost and not above the tender price ceiling (clause 6.1.3), deviation from the evaluation benchmark price (DB37/T 5161-2020 clause 5.3.4). The standards set no uniform deviation-percentage threshold; judging 'unreasonably low or high' and any magnitude threshold must be agreed in the tender documents and evaluation rules.
- ←
Re-derivation of the all-in unit rate when a changed construction method makes the quota machine-shift consumption inapplicable: the three-path quota conversion test, the hierarchy of bases for recalculating plant consumption, the requirements for recasting the all-in unit rate analysis sheet, and the procedure for confirmation by the employer
Changes of construction method and plant usage are factors expressly listed in GB/T 50500-2024 Clause 8.9.1 as changes of item description or construction condition that can trigger adjustment of the all-in unit rate, but conversion must step down level by level: a conversion line item within the same chapter (DL/T 5468-2013 Clause 4.1.4 item 1: 'where the technical conditions prescribed by the quota (index) differ materially from the actual conditions of the works, the applicable quota (index) may be adjusted and applied according to the technical conditions of the works and the provisions of the quota') -> an express quota coefficient -> borrowing a similar process -> building up a rate from supplementary consumption (GB/T 51095-2015 Clause 5.3.12; TB 10801-2024 Clause 2.4.3); with no express coefficient, none may be invented. The hierarchy for recalculating machine-shift consumption is: contractor's in-house norms (GB/T 50875-2013 Clause 2.3.3) -> construction quotas (Clause 2.3.5) -> budgets or final accounts of similar works, or site measurement records certified by both parties (DL/T 5468-2013 Clause 4.1.4 item 2). After conversion, the all-in unit rate analysis sheet must be recast (GB/T 51095-2015 Clause 5.3.9; GB/T 50500-2024 Clause 6.2.12 and Annex E Table E.2.2-1) and submitted to the employer under the 'submission, checking, review, re-examination and confirmation' procedure (Clauses 8.1.2 and 8.1.3; for additional works, the project execution plan or implementation scheme and the priced offer must also be submitted before execution, Clause 8.10.2). The original quota line item must never be applied in departure from the approved construction scheme.
- ←
Pricing comparison method for prefabricated supports versus site-fabricated supports: precondition test of the billing itemisation basis, item-by-item comparison of cost components (principal materials / wastage / fabrication labour and plant / anti-corrosion and galvanising / installation labour), comparison of fabrication and installation quota line items, and the code-based selection rule that favours prefabrication
Prefabricated supports (billed per set) and site-fabricated supports (steel sections priced by kg through fabrication plus installation quota line items) cannot be compared directly as CNY/kg against CNY/set. The billing itemisation basis must first be tested under GB/T 50856-2024 clause 3.0.10: without a special design requirement, supports and hangers are already included in the all-in unit rate for pipe installation and must not be listed separately; with a special design requirement (Annex N, code 031301), prefabricated supports are billed per set and supports and hangers per kg, while seismic supports are always coded as prefabricated supports per set and must not be converted into kg to apply fabrication line items. The cost component differences concentrate in four points: whether the principal materials include fittings, anchors and galvanising; site fabrication labour and hot-work cutting plant; consumables such as welding materials and gases; and the anti-corrosion grade (fabrication line items include ordinary anti-rust paint plus ready-mixed paint only, and hot-dip galvanising must be priced separately).
- ←
Pricing yardstick of the railway works budget quota manual for demolition works: counting only labour and machine-shift consumption multiplied by demolition coefficients by object category, excluding material cost, plus operating-height adjustment coefficients
The railway quota system sets no separate demolition line items: the corresponding installation line item is taken and multiplied by a demolition coefficient. The Volume 8 (Power Works) preamble Table 3 of TB/T 10829-2024 multiplies both labour and machine-shift consumption by 0.40 for lighting fittings, transformer and distribution boxes, control/power/lighting packaged cabinets (boxes), cable brackets, cable troughs and trays; 0.75 for concrete poles and foundations; 0.80 for angle-steel towers, steel-tube towers, beacon towers, light bridges, steel columns, busbar structures and their foundations; 0.50 for overhead lines and cables; 0.65 for underground cable routes. The information works and signal works volumes under Guotie Kefa [2017] No. 33 give 0.7 for wiring systems and outdoor/indoor cables and 0.5 for equipment and materials, and expressly count 'only labour and machine-shift consumption (excluding instruments and meters)' with no material cost.
- ←
The rate build-up path from quota line items to the all-in unit rate of a BOQ item and the cost calculation procedure: divisional work item cost as BOQ quantity x all-in rate, sum of quota line item amounts / BOQ item quantity (3 decimal places for quantities, 2 for rates), the three pricing methods, the analysis sheet identical to the BOQ rate, and the taxed versus tax-exclusive cost structures
The all-in unit rate of a BOQ item is converted as 'sum of quota line item amounts / BOQ item quantity' (item amounts at full precision with no rounding, BOQ quantities to 3 decimals, all-in rates to 2), and divisional work item cost = sum of (item quantity x all-in rate); the rates and prices in the all-in unit rate analysis sheet must exactly match those in the BOQ (GB/T 50500-2024 clause 3.1.7); pricing methods are unit-rate, lump-sum and percentage-rate, with divisional items and dayworks best priced at unit rates and preliminary items by lump sum or percentage; the taxed cost follows 'tax-exclusive cost of works = (divisional items + unit-rate preliminaries) + lump-sum preliminaries + other charges, and VAT = tax-exclusive cost x rate'; the scope of the all-in rate must be confirmed first - GB/T 50500-2024 clause 2.0.9 excludes VAT, while GB/T 51095-2015 clause 5.3.8 and article 5 of Ministry of Construction Order No. 107 are full-cost scopes including statutory levies and taxes.
- ←
Rate build-up basis and confirmation procedure when a BOQ omission or new item has neither an applicable nor an analogous rate: GB 50500-2013 Section 9.5 (citing the four tiers of cl. 9.3.1) mapped against GB/T 50500-2024 Sections 8.2/8.9/8.10, plus the time limits for adjustment reports
GB 50500-2013 cl. 9.5.1 provides that 'where, during performance, new divisional and sub-divisional works BOQ items arise because of omissions in the tender BOQ, the unit rates shall be determined per cl. 9.3.1 of this code and the contract price adjusted'. Tier 3 of cl. 9.3.1 reads 'where the priced BOQ contains neither an applicable nor an analogous item for the varied work, the contractor shall propose a unit rate for the varied work based on the variation documents, the measurement rules and pricing methods, the published price information issued by the government construction cost administration and the contractor's price fluctuation rate, and adjustment follows employer confirmation'; tier 4 switches, where the published price information lists no price, to a rate based on 'market prices with a lawful basis obtained through market enquiry and other means', again subject to employer confirmation -- so published price information comes first and a lawful market price only fills gaps, and tier 3 must carry the contractor's price fluctuation rate. GB/T 50500-2024 no longer has a stand-alone 'omission' section: erroneous and omitted items are folded into 'errors and omissions in the BOQ' (cl. 8.2.1 -> cl. 8.9.1/8.9.2), additional works outside the contract scope follow Section 8.10 (cl. 8.10.2 requires the contractor to submit the project execution plan or execution scheme, the programme and the priced offer to the employer for review and approval before executing the additional works), the adjustment procedure is unified as 'submission, checking, re-checking, review and confirmation' (cl. 8.1.2 to 8.1.4), and employer silence past the time limit counts as deemed approval of the contractor's report.
- ←
Stages and charging of landscape greenery maintenance: the start points of construction-period, establishment and conservation (routine) maintenance, the period adjustment factors and the quantity measurement objects
Greenery maintenance divides into three non-overlapping stages: construction-period maintenance (planting to completion acceptance) is inside the planting items, never charged again; establishment maintenance runs in 'months', quantities by plant counts for trees, shrubs, climbers, standards and bamboos, length for hedges, area for lawns, flowers, colour bands, perennials and aquatics - Beijing counts from completion of planting, part months as whole months, and the part beyond one year at x 0.85 (Hunan: within one year of the planting unit works' passing acceptance - months 1-3 on establishment items, months 4-12 labour-material-plant x 0.8); conservation (routine) maintenance runs in 'years' from passing completion acceptance, its term per design or contract. Hence aquatics etc. 'plant by count, maintain by area'.
- ←
Selecting quota items for drip lines and drip grooves: the two routes of mortar beads / pressed grooves versus proprietary drip strips, the application and unit of moulded-render (decorative-line) items (extended metres or area), and avoiding double pricing against the element's finish plaster
No edition of the building and decoration consumption (budget) quotas carries an item named 'drip line / drip groove': for mortar-bead or pressed-groove drips, where the local quota has a 'moulded render (decorative line)' item, apply that item by extended metres (10m / 100m); without it, merge into the element's plaster by area with no extra charge. Proprietary metal / PVC drip strips take the proprietary decorative-line items with main-material conversion, by the metre. Where window-sill lines, string courses, eaves projections, parapet cappings, sun-shade edges etc. have already been priced as moulded render, the drip formation is deemed included - no further extended-metre drip line may be added.
- ←
Curtain boxes and curtain tracks (rods): BOQ itemisation, quota item selection and units - proprietary erection and site fabrication listed apart, measurement by extended metres, tracks never merged with boxes
Curtains, curtain boxes and tracks are itemised per GB/T 50854-2024 Table H.10.1 (code 010810), measured by length (extended metres) from the drawings, never developed area; proprietary boxes take 'proprietary erection' items and site-made boxes 'fabrication and erection' items, the proprietary box entering as an unpriced main material; curtain tracks and rods are not inside the box items - every quota volume sets separate items, and they must be listed apart.
- ←
Whether roof steel purlins, horizontal bracing and tie rods list separately: purlins are independent flexural members listed apart by mass; bracing and ties take 'horizontal steel bracing / tie rod' items - never merged into roof trusses nor mistaken for excavation-retention struts
Steel purlins run across the trusses carrying the roof build-up - independent flexural members functionally unlike trusses - and list separately in both quota and BOQ, by mass (t) from the drawings. Railway TB/T 10831-2024 Volume 10 sets 'steel purlin fabrication and erection' apart: fabrication in three bands - pipe (FY-724), C and Z sections (FY-725), other sections (FY-726) - plus one erection item (FY-727), all in t; in its member classification purlins, bracing and ties all sit in class II. Beijing DB11/T 2382-2024 Appendix A.6.5 sets 'horizontal steel bracing / tie rods (cold-formed)' items taking the top-chord plan bracing, bottom-chord horizontal bracing, column bracing and ties, by t; roof bracing never takes the excavation-retention strut items.
- ←
The building repair works quota (railway 2024 building volume): scope of application, auxiliary work already included (30m haul, vertical transport, propping and watch), and the quantity rules of demolition and strengthening items
The 'repair works' section of the railway 2024 building quota applies to piecemeal demolition and structural strengthening of buildings - not to whole-building demolition. The items already include propping and strengthening of the building and adjoining parts, site watching, hauling reusable material and debris to designated points within 30m, vertical transport, and clearing, stacking and tidying. Demolition always measures 'as actually removed': roofing by removed area; masonry by removed volume (holes up to 0.03m2 not deducted); ceilings by horizontal projected area (interior columns not deducted); floors by horizontal projected area (skirtings merged in); concrete and reinforced members by removed volume. Static cutting measures the cut face area; where cut blocks need breaking, the concrete demolition item applies x 0.80. Steel demolition measures mass from the drawings (no deduction for holes, cropped limbs or edges; electrodes, rivets and bolts add no mass); steel-plate and carbon-fibre strengthening measure the actually bonded area (laps included).
- ←
The depth standard for describing item descriptions in the bill of quantities: describe item by item per the appendices, satisfy the needs of fixing the all-in unit rate, and never substitute the quota work content (trades)
The item description is the pricing parameter that fixes the all-in unit rate; the depth floor is 'describe item by item per the item descriptions prescribed in the appendices of the corresponding discipline measurement standard + satisfy the needs of fixing the all-in unit rate' (GB/T 50854-2024 clauses 4.2.4, 4.1.2). Citing a standard drawing collection or drawing number covers only 'the part it can satisfy' - the rest still needs words (GB 50860-2013 clause 4.2.4 commentary). Copying the work content (trades) of the quota / appendices replaces no item description: work content defines the included scope of the offer and the trade boundaries, and trades must not be split into separate items - copying produces no pricing parameters such as material, grade or strength class, and invites trade-splitting double pricing.
- ←
Splitting equipment from piping in insulation works and selecting items: equipment versus pipe insulation by insulated object, and the volume of the insulation layer and area of the cladding of box-type equipment (bolted panel tanks)
Insulation items divide by 'insulated object', not by bore or material: GB/T 50856-2024 Appendix M Table M.8.1 (code 031208) lists equipment insulation, other piping insulation, ventilation duct insulation, and valve and flange insulation. Equipment insulation must describe the equipment form (vertical / horizontal / spherical) and pipe insulation the pipe outside diameter - the description items and consumptions differ and the two classes are not interchangeable. Rectangular bolted box equipment such as stainless panel tanks is itemised as equipment insulation under equipment items; the insulation layer is by volume m3 (outer surface area x thickness; cylinders by pi x (D+1.03d) x 1.03d x L), cladding and vapour barriers by the outer area of the insulation m2, lap and seam wastage already inside the item materials. The GB 50264-2013 clause 5.7.3 commentary line 'pipes over 720mm count as equipment for insulation and cladding' is a banding reference only.
- ←
Classifying and measuring slope treatment works by protection type: plant protection by slope area, masonry protection by masonry volume, anchoring and facing listed apart (anchor length / mass + facing area), SNS flexible nets by laid area with anchors and posts separate
Slope treatment pricing first fixes the sector system (railway / highway / municipal) and the protection type, then itemises on the measurement line: (1) plant protection (grass seeding, hydro-seeding, geotextile mats, planting bags) by laid slope area; (2) masonry protection (mortared rubble slope protection, skeleton (rib) protection, protection walls) by solid masonry volume, rendering and pointing extra by area; (3) anchoring + facing (anchor-mesh hydro-seeding, shot-seed-mix, anchor-mesh shotcrete) split with anchors by design length / mass and facings by area / volume; (4) SNS flexible protection nets by design laid area, with anchors and post foundations / posts listed separately. What the work content already includes (meshing, scaffolds, energy dissipators etc.) is never listed again.
- ←
Quantity rules for triaxial cement deep-mixing piles: measuring by 'panel', no double counting of the three-circle overlaps inside a panel, and the three paradigms for inter-panel laps (one-hole re-stacking / full-section re-stacking), with a d850@600 panel-section worked example
Triaxial cement mixing pile quantities count by 'panel' (the three shafts of one driving pass): panel = panel cross-section x pile length (plus over-cast); the mutual overlaps of the three circles inside a panel never count twice (Shaanxi deducts the overlap volume, Jiangsu bars double-counting overlap area, Shenzhen takes the per-panel unit section, Fujian counts 3 circles for the opening panel and 2 thereafter), group-pile overlaps not deducted; inter-panel laps follow the quota rules - full-section re-stacking labour and plant x 1.50 (railway, Shaanxi), the re-mixed lap holes charged as empty boring (Shenzhen), or the re-stacked quantity not deducted with cement based on the design reinforced-soil volume (Jiangsu); pile counts are whole panels, not single shafts x 3. For d850@600: one panel net of internal overlaps 1.4949 m2; a panel after a one-hole lap adds 1.1349 m2.
- ←
Defining the scope of bridge abutment backfill (fill behind abutments): longitudinal backfill length, full-width transverse placing, whether fill under the approach slab belongs, plus fill material, compaction requirements, measurement by volume and quota application
Abutment backfill is the filling of the gap between the rear face of the abutment stem (back wall) and the original ground/subgrade, including the areas behind the wing walls, the backfill under the approach slab and the abutment drainage layer; it excludes pile-cap excavation backfill and conical-slope surface protection. The longitudinal length follows CJJ 2-2008 clause 11.5.7 item 3: not less than the abutment height plus 2m at the top of the stem and not less than 2m at the bottom, and for arch bridges not less than 3 to 4 times the abutment height (the design governs where specified); transversely it is placed to the full designed width in one operation, simultaneously with the conical slopes. Backfilling may start only when the abutment/retaining-wall concrete has reached 75% of the design strength, and the degree of compaction of the transition zone behind the abutment must exceed 96%. The backfill is measured by volume (m3) and priced by quota line item according to fill class; the approach slab itself is a separate line item.
- ←
Pricing and measurement of CCTV/QV/sonar in-pipe inspection: extended metres along the centre line of the pipe or culvert without deducting manholes, line items banded by diameter and inspection method, working conditions (water level, clearing and cleaning) and excluded work charged separately
CCTV in-pipe inspection of pipelines is measured in metres (m) by the extended length of the centre line of the pipe or culvert as designed (actually inspected), without deducting the length occupied by fittings or manholes; the CCTV line items are banded by internal diameter or height of the pipe, with 100m as the line-item unit, and QV and sonar likewise. The line items comprehensively allow for differences of pipe type, material and age, but exclude pipe plugging and reinstatement, desilting, culvert-wall washing, dewatering, and image analysis and assessment, digital mapping and archiving, and compilation of inspection deliverables, which are charged separately when they occur; desilting for the inspection and repair categories is charged at the labour, material and plant of the corresponding items multiplied by a factor of 1.5.
- ←
Split quota pricing of motorised two-way control valves (temperature-control valves) on chilled-water systems: valve-body item plus electric-actuator item (plus a wiring item) as three charges, versus the single all-in item for ordinary globe and gate valves, and the criteria for charging wiring
A motorised two-way control valve is not covered by one valve line item but split into three charges: the valve body takes a valve-installation line item by connection form and size (DB11/T 2382-2024: threaded valve DN20 is C10-5-2, all-in labour category II 0.060 workdays per valve; welded-flange valve DN50 is C10-5-35, 0.295 workdays per valve); the electric actuator takes the building-equipment-monitoring 'motorised two-way control valve' item (C5-3-59 up to DN50, 0.522 workdays per valve; C5-3-63 up to DN100, 1.017 workdays per valve, the work content already including actuator installation, wiring and testing); wiring is charged separately or not depending on which volume applies (electrical volume C4-4-156 'valve wiring', 0.126 workdays per valve; instrumentation volume C6-2-45/C6-2-46 'valve check-out and wiring', 0.290/0.336 workdays per unit, only for control valves already installed on industrial pipework). Ordinary globe and gate valves are covered by one line item whose work content already includes pipe cutting, beveling, flange gasket fabrication and installation, valve and flange installation and pressure-test-pump machine-shifts.
- ←
Pricing and member-wise itemisation of stone balustrades (granite balustrades): the basis test, the post / panel / sill items and their measurement rules
Stone balustrades route by works basis first: landscape / scenic and antique-style balustrades (posts + panels + continuous sill as grouped stonework) take Beijing 2024 antique volume B.2 stonework (B-2-15 to B-2-19) or landscape volume E.3.3-10 / 11; modern stone panels of stairs, corridors and outdoor platforms take building volume A.15.3-7. Member-wise measurement: sill stones by length m (landscape) or volume m3 (antique); posts by size per piece; Xunzhang and Luohan panels by drawn height x base length in m2; drum-end stones by base length x mean height in m2. BOQ itemisation per GB/T 50855-2024 Table B.2.1 (code 020202) or GB/T 50854-2024 Table Q.3.1 (code 011503).
- ←
Measuring and pricing the hand-laminated joints of GRP pipes and ducts (resin-impregnated lay-up joints, resin filling and joint reinforcement): the lamination sits inside the pipe / fitting / duct installation items' work content, not itemised separately; only where the joint form exceeds the quota range does it count separately per joint or per developed lamination area
The hand-laminated joint of GRP pipes and ducts is no independent quota item: its resin filling, glass-cloth reinforcement and glue-smeared insertion are written into the work content of the pipe (fitting) / duct installation items, so pricing follows pipe length (m, unit 10 m, on the drawn centre line without deducting fittings and valves), fitting count (pieces, unit 10) or duct developed area (m2, unit 10 m2), not per joint; only where the designed joint form exceeds the quota's scope (site butt joints with double-sided lamination, hand-laminated joints of finished ducts on site) does it count separately per joint or per developed lamination area, applying hand-laminated GRP items (GB/T 50856-2024 Appendix M Table M.3.1, code 031203) or a supplementary quota compiled on quota principles and approved.
- ←
Measuring and pricing drainage (discharge) pipes: fixing the measurement basis and quota items by scenario - roofs, urban rail transit, municipal bridges and culverts, railway bridge decks
Drainage pipe measurement splits by scenario: pipe bodies (downpipes / drainage pipes / the discharge pipes themselves) by drawn length in m (extended metres), and finished parts - discharge outlets, rainwater heads, hoppers, drain inlets - by count (per set / per piece). Building roofs follow DB11/T 2382-2024 Articles 4.10.21 to 4.10.23 (downpipes by length; hoppers, bends and drain inlets by count; roof drain (drip) pipes and vent pipes by count); urban rail follows Article 10.1.90 of the same standard (discharge pipes by length); municipal bridges follow SJG 181.2-2024 Article 7.2.4 (drainage pipes and weep holes by length in metres); railway bridge-deck drainage quotas count per 10 extended metres. The same member carries different units across industry quotas - apply the volume the project executes.
- ←
Structural layering of permeable brick paving (sponge-city permeable paving), each layer's material / thickness / porosity requirements and construction control indices - also the build-up basis for pricing layer by layer
Permeable brick paving layers as surface of permeable bricks - levelling (bedding) layer - permeable base - permeable subbase (cushion) - subgrade, each layer differing in build-up and materials - the basis of design, construction and layer-by-layer quota itemisation. DB37/T 5060-2016 Article 5.2.7: surface preferably 60-80 mm, levelling layer 20-40 mm, cushion 100-300 mm, surface porosity at least 20% and permeable cushion at least 30%; DB11/T 685-2021 Article 7.2.12: the levelling layer's permeability coefficient shall be not less than the surface's; the permeable base may be graded crushed stone, porous cement-stabilised crushed stone or pervious concrete, thickness per the ground load intensity; DB3201/T 1150-2023 Article 5.3.1: subbase compaction at least 93%, dry-hard mortar bedding cement-sand 1:3, spreading thickness not under 20 mm, pervious concrete base joints at 4.5-5.5 m and never over 6 m.
- ←
Pricing when design sizes exceed the top band of budget quota items (quota gap / over-range): over-range is a gap, not a conversion; proportional extrapolation is banned; four steps - express note, top band, borrowing similar-workmanship quotas, supplementary build-up for approval
Design sizes above the quota's top band are a quota gap, not a quota conversion: no linear extrapolation by diameter, section area or capacity, and no self-invented unfounded coefficients (review reads up-rating). Order: 1 check the volume / chapter notes for express over-range provisions and follow them (e.g. stated adjustment coefficients); 2 absent them, the top band is the ceiling - apply it and record the design difference honestly in the notes, no equivalent-quantity conversion or self-set coefficients; 3 borrow similar-workmanship quotas (cross-volume / discipline / region allowed), listing the borrowing basis, charging following the borrowed volume's rules; 4 compile a supplementary unit-rate build-up per quota compilation principles and submit for approval (GB/T 51095-2015 Article 5.3.12; DL/T 5468-2013 Article 4.1.4). Sizes below the bottom band likewise bar interpolation.
- ←
Deciding between earthwork and rockwork quotas in excavation, and the three soil / rock classification systems with the route to quota items
The test is excavation difficulty, not the geological name: soil dug with shovels, picks and mattocks and fully loaded by machines direct takes earthwork quotas; ground needing ripping, prying, pneumatic breakers or blasting takes rockwork quotas, the line falling between hard soil (class 4) and soft rock (class 5); the class is fixed from the geological survey report against the classification table of the quota volume in use. Building and municipal works use classes 1-2 / 3 / 4 soils and extremely soft to extremely hard rock in five grades; highways use loose / ordinary / hard soil and soft / moderately hard / hard rock (mapping to the 6- and 16-grade I-XVI systems); the Protodyakonov system counts I-IV as soil and V-XVI as rock; then the item follows the method, excavation form (trench / pit / general), depth and dry / wet soil.
- ←
Routing grouting items when existing-line strengthening uses grouting under the 2024 railway budget quotas: the bridges and culverts volume's existing-line strengthening and protection items exclude grouting; grouting routes by location and slurry type to the subgrade volume's underground cavity treatment, the buildings volume's grouting reinforcement and the tunnel volume's mining-method support items
The existing-line strengthening and protection items of TB/T 10823-2024 Volume 2 Bridges and Culverts (QY-843 to QY-846, banded by strengthening length up to 5 m / 7 m x timber / concrete sleeper sections, unit per track) have work content limited to hoisted rail beam erection and removal, sleeper replacement, track dressing and ballast topping-up and track protection (concrete-sleeper sections adding reinstatement of reinforced concrete sleepers) - no grouting. Grouting in existing-line strengthening routes separately by location plus slurry type: subgrade / underground cavities under TB/T 10822-2024 Volume 1 Chapter 7 underground cavity treatment (drilling LY-443-446; grouting LY-447 cement mortar, LY-449 sleeve-valve cement grout, LY-448 sleeve-valve cement-silicate double slurry 1:0.8); general soil under TB/T 10831-2024 Volume 10 grouting reinforcement (layered grouting FY-293/294, compaction grouting FY-295/296); tunnel locations under TB/T 10824-2024 Volume 3 mining-method tunnel support (advance-support grouting SY-119/120, advance reinforcement SY-123-129, perimeter reinforcement SY-130-132, surface reinforcement SY-133-137). Drilling and grouting are separate paired items; double-slurry items carry far higher material shares than plain cement grout.
- ←
Routing monitoring / signal poles and their concrete foundations to quota disciplines: poles to general installation or municipal works, foundations always charged separately under building civil works
The discipline routing of monitoring / signal poles turns on whether the road sits within municipal jurisdiction: poles (monitoring poles, street lights) along plant and residential-estate roads follow general installation works electrical equipment installation (GB/T 50856-2024 Appendix D); only city-road lighting systems / municipal traffic facilities follow GB/T 50857 municipal itemisation. The concrete foundations of poles and equipment (including foundation earthworks and anchor-bolt embedment) are excluded by every installation item and follow the building and decoration (or structures) works items, with secondary grouting under machinery installation.
- ←
Where waterproofing primers (cold primer oil / primer coat / substrate treatment agent) sit in membrane waterproofing quotas: included in the membrane items or to be itemised separately
The test is not the operation's name but whether the executed membrane item's work content states brushing the primer and its consumption table lists the primer material: stated and listed means included - no separate itemisation, which would double count. The railway TB/T 10831-2024 Volume 10 roofing membranes FY-983 to FY-1000 and basement / kitchen / bathroom membranes FY-941 to FY-957 all list brushing primer in the work content - included, not recharged; TB/T 10834-2024 Volume 13 station works notes state that membrane seams, edge terminations and screed joint sealing are already in the quota while the cement mortar screed itself is not (screed chargeable, its sealing included). Beijing DB11/T 2382-2024 membrane items include brushing primer and set no separate cold-primer item; a few systems do set one (Jiangsu 2026 items 9-132 / 9-133 cold primer oil, first and each additional coat; Shenzhen SJG 181.5-2024 dedicated primer under other waterproofing), used only where the quota excludes it or the design requires separate application.
- ←
Adjusting haul-distance changes in quota transport items: items are compiled as a base-haul band plus increment bands; cost is not proportional to distance, so scaling by distance ratio is forbidden
Quota transport items come in a banded ladder of a base haul band plus an increment band; each band's cost carries distance-independent fixed consumptions - loading and unloading, waiting, empty returns - so cost is not proportional to distance: a shortened haul must not be scaled by ratio (1 km cut to 200 m is not x 0.2); where a first band up to 200 m exists, apply that band directly; where the first band is 1 km or more, 200 m still falls within it and the base item applies without reduction; only beyond the first band does base item + increment item x number of increments stack, the count rounding at the half (a remainder under half an increment unit is dropped, at half or more it counts as one); adjusted items must carry a conversion mark on the item number.
- ←
Discipline attribution and quota application of split boxes (splitters): telecom cable split boxes, outdoor cable split boxes and CATV splitters / taps must not borrow items across volumes
The split box / splitter is not one single item: attribute by discipline first, never borrowing across volumes - telecom cable split boxes under railway TB/T 10826-2024 Volume 5 Telecommunications Works TY-256 to 259 (by G0D12 / G0D24 / G0D36 / G0D48 types, unit per piece); outdoor cable split boxes under Beijing DB11/T 2382-2024 Table G.3.27 (split by internal / external wall and pair-count bands, e.g. G3-5-27 internal wall up to 30 pairs, G3-5-29 external wall up to 100 pairs, unit per piece); CATV splitters / taps belong to intelligent building weak-current works, under Table C.5.59 line equipment C5-4-95 (subscriber taps and splitters up to 8 ways, unit per piece).
- ←
Quota pricing route for micro-disturbance cement mixing piles (IMS piles): workmanship classification, quota-gap determination and cement-content conversion
Micro-disturbance cement mixing piles (IMS piles) are a workmanship variant of deep cement mixing piles (T/ZS 0141-2020 Article 2.1.1); pricing lands in the deep cement mixing pile items of the ground-treatment chapter, not a new pile type; because the rig and workmanship parameters differ from conventional triaxial practice (high-pressure air-assisted cutting shall not be used; dedicated combined augers), triaxial items cannot be casually applied, nor pin-type items misattributed - where no matching item exists, treat as a quota gap (first adapt the nearest similar workmanship, else compile a supplementary unit-rate build-up schedule on quota principles for approval); where the cement content differs from the quota basis, stack the per-additional-1%-cement or plus-minus-5-kg/m adjustment items instead of editing consumptions directly.
- ←
Quantity calculation and quota application for metal protective cladding (aluminium sheet, galvanised iron sheet) over pipe insulation
Metal cladding over pipe insulation is measured in developed cladding area m2, not by pipe length or insulation volume; calculated by the GB/T 50856-2024 Appendix M Table M.11.10 notes item 6 formulas (insulation V = pi x (D + 1.03d) x 1.03d x L; vapour barrier / cladding S = pi x (D + 2.1d) x L, D being pipe outside diameter, d insulation thickness, L pipe extended length); apply the metal cladding items of the painting, anti-corrosion and insulation chapter, banded by material (galvanised thin steel sheet, aluminium alloy sheet etc.) and thickness, pipes and equipment listed separately, seaming and lap wastage already in the material consumptions; pipes over 720 mm diameter are treated as equipment; flange and valve insulation box cladding is calculated separately per Table M.11.10-1.
- ←
Choosing the pricing route and item attribution for electrical handholes / manholes under quotas (power cable chambers, street-lighting pull pits, telecom manholes / handholes, precast vs cast-in-place)
Pricing a cable working chamber first chooses between two routes: (1) whole-chamber comprehensive items (unit per chamber, work content covering the base, masonry or casting, rendered and waterproofed walls, covers and frames, even pit excavation and backfill outside - no further sub-items covered by them); (2) split combined items (blinding / masonry base / formwork / rendering / cover fabrication and installation / cover and seat listed separately, units m3 / m2 / set). Power (electric cable) chambers go to the power / cable line chapters (e.g. TB/T 10829-2024 Volume 8 DY-341 to DY-349 cable manhole fabrication); street-lighting pull pits and telecom manholes / handholes go to the telecommunications / ducting chapters (e.g. TB/T 10826-2024 Volume 5 TY-60 to TY-69 masonry manholes / handholes). Whether precast concrete chambers can be applied depends on the item's workmanship: DB11/T 2382-2024 Table F.1.5-2.3 standard concrete cable chambers is a cast-in-place work content and cannot be applied as precast; precast members and shafts are measured by volume / length per Articles 7.4.15 / 7.4.16, and where no precast chamber item exists it is a gap requiring a supplementary quota and approval.
- ←
Whether duct elbow (duct) turning vanes are separately itemised, their quantity measurement basis and pricing rules: duct items exclude turning vanes and local consumption standards set separate items; Shenzhen measures vane area in m2, Beijing counts the quantity shown on the drawings
Duct elbow turning vanes must be separately itemised and separately priced - the duct body items' work content covers only fittings such as elbows, tees, reducers and square-to-round transitions plus flanges, stiffening frames and hangers, not turning vanes; local consumption standards set separate elbow turning vane fabrication and installation (assembly) items, and single vanes and banana-type double vanes all apply the same item. Two measurement routes: Shenzhen SJG 111.3-2022 Article 4.2.2 paragraph 4 - elbow turning vane fabrication and installation is measured in square metres by the vane area shown on the drawings, and where the design is silent by Tables 4.2.2-1 (approximate area of each vane in rectangular bends) and 4.2.2-2 (number of vanes in rectangular bends); Beijing DB11/T 2382-2024 Article 6.7.33 - elbow turning vane fabrication and assembly quantities are calculated per the quantity shown on the drawings or per code requirements. GB/T 50856-2024 Appendix G Table G.2.1 (duct fabrication and installation, 030702) sets no vane BOQ item; in pricing, itemise as a supplementary BOQ item or, after stating it in the 030702 item description / work content, include it in the all-in unit rate, per the contract pricing rules - never both merge it into the duct all-in unit rate and list a separate item.
- ←
Telling quick takeoff valves from steam traps and the quota-matching test: similar names but different systems, media and functions; match quota items by item description + work content, not by name
A quick takeoff valve and a steam trap are not the same device: the takeoff valve (quick coupling water valve) is a draw-off fitting on irrigation and water supply networks, carries ambient-temperature water and supplies water outward, priced under the landscape greening works special item sprinklers and quick coupling valves, unit per valve; the steam trap per GB/T 51218-2017 23.3.81 is a device that discharges condensate from a steam system while preventing the passage of steam, installed on steam systems, discharging water outward and holding back steam, priced under the heating works item steam trap assembly and installation, unit per set. The distinction is which system the device sits in and which medium it carries, not the name; the pricing red line is matching by item description + work content - cross-applying the two is a mis-application.
- ←
BOQ itemisation and quota item scope for lightning protection and earthing devices in street lighting works: code 040806, the chapter's item composition, and excluded contents such as lump-sum earthworks, testing and soil replacement
The BOQ item for lightning protection and earthing devices in street lighting works follows GB/T 50857-2024 Appendix H Table H.6.1 lightning protection and earthing works (code 040806); in quota terms the chapter's items are earth electrode fabrication and installation, earth busbar laying, earthing jumper installation, lightning rod installation and lightning protection down-conductor laying, of which the earth electrode and earth busbar items exclude construction by blasting, soil replacement in high-resistivity soils, chemically treated earthing devices and earth resistance testing; earth busbar laying is comprehensively compiled for natural ground level and ordinary soil, including trench excavation, backfill and compaction - applying the chapter's items, earthworks are not calculated again, while rock, slag, ponded water and obstructions are calculated separately. Under the general installation basis, earthing electrodes and busbars are itemised and measured per GB/T 50856-2024 Appendix D and must not be mixed with the municipal code 040806.
- ←
Double-counting test for BOQ items of anti-corrosion coating and fireproofing coating in steel structures: duplicate item-description wording is not double counting; the test is whether both point to the same coating operation / the same coat
Repetition of item-description wording is not in itself double counting - anti-corrosion paint and fireproofing coating are brushed onto the same member surfaces, so similar descriptions are normal. The test is whether the two point to the same coating operation / the same coat: coats in different systems (primer / intermediate coat / topcoat vs fireproofing coating) are independent items settled as executed; only where the same operation is described in two line items, or where one line item's quota work content already covers the other's operation (e.g. a fireproofing coating item whose work content already includes surface rust removal and primer), is the duplicated portion disallowed. Basis: GB/T 50854-2024 Appendix F.10.11 and GB 50205-2020 Appendix J.0.4 (two independent measurement bases), and GB/T 50854-2024 Article 4.1.2 (necessary work already included in the work content must not be split out as a separate item).
- ←
Routing cast-in-situ and precast terrazzo floors under the quota: monolithic finishes (cast, ground and waxed on site - railway FY-1209 to 1213, Beijing A-11-24 to A-11-27) versus tile (precast slab) finishes laid on a bed with the main material swapped - banding and adjustment rules
Terrazzo routing ignores the word "terrazzo" and reads the construction form: site-mixed casting with grinding and waxing is a MONOLITHIC finish taking the terrazzo monolithic items (TB/T 10831-2024 Volume 10 FY-1209 to FY-1213: 15 mm with divider strips / 15 mm with strips, colour-split / mirror 20 mm with strips / mirror 20 mm with strips, colour-split / per 1 mm up or down, all per 10 m2); factory-precast slabs laid on a bed are a TILE finish - GB 50209-2010 clause 6.4.1 "precast slab finishes of cement concrete, terrazzo and artificial stone slabs shall be laid on a bed" - taking tile items with the main material swapped to precast terrazzo slabs (mainstream quotas set no precast terrazzo floor item). Banding follows divider material and grade: ordinary terrazzo takes glass strips, artistic (coloured) takes brass strips; coloured / artistic and mirror stand as separate items, never coefficient-converted.
- ←
Whether threshold stones (door-sill stones) and tile border stones (edgings) list separately, and their measurement and pricing: different materials take separate items, the opening-merger rule, and the applicable item types
A threshold stone of material different from the adjoining tiles must list and price separately (different kinds and materials on one laid face execute their own quota items); tile finishes compute on the laid face area with door openings and voids merging in - once the threshold lists apart, its area never merges into the surrounding tile area. Ordinary building works take the stone floor items (m2); scattered floor areas of 0.5 m2 or less may list as sundry decoration (code 011108); finished metal trim strips take the trim-strip installation items (m); heritage / traditional stone work measures by volume (m3) (code 920204 sill-cushion, threshold and centre-dividing stones). Border stones merge when of the same material and size as the field, list apart when not.
- ←
Pricing the core filling of hollow blocks (core-column concrete): never merged into the block-wall items - apply the cast-in-place concrete column "core column" item, quantities on hole section area times design-shown height
Block-wall items cover only "mixing mortar, cutting, laying and the like" - core filling is outside; apply the "core column" item among the cast-in-place concrete columns (Beijing DB11/T 2382-2024 A-5-13; 2021 edition 5-13), unit m3; quantities on the hole cross-section area times the design-shown height by volume. Plain and reinforced core columns take the same item; the bars, ties and inserts within them execute under the concrete and reinforced concrete rules. Regions differ (Shaanxi, e.g., already counts the core mortar of vertically laid blocks at opening jambs inside the walling mortar) - apply per the local quota notes.
- ←
When bill and quota measurement units mismatch (m2 bill against m3 quota): no unit conversion - bill and quota quantities run on separate tracks, bridged by the all-in rate P = sum of item prices over Q
Bill units are locked - never rewrite a bill to m3 because the quota runs m3: GB/T 50500-2024 clauses 3.1.4 and 4.1.7 require units per the national and sector measurement standards, and GB 50861-2013 clause 4.2.6 (mandatory) "bill units shall follow the units in the appendix". The right handling is neither unit conversion nor a conversion factor on the quota rate, but: bill quantities on bill rules (keeping the appendix m2 unit), quota quantities converted on quota rules (m3), independent; then bridged per DBJ/T 15-145-2018 clause 6.1.4 - the all-in rate of a bill item equals the sum of the quota item prices under it divided by the bill item quantity.
- ←
Splitting rules for applying consumption items to framed partitions: framing and boards set apart, infills charged separately as insulation, double-faced boards doubled, fire rating never a selection basis (Beijing DB11/T 2382-2024 chapter 4.13 and Annex A.12)
Applying consumption items to fire rock-wool board partitions turns on the build-up and board type, never the fire rating (no "fire partition" subject exists; fire endurance is a design requirement): framed partitions itemise framing and boards separately per DB11/T 2382-2024 clause 4.13.16 item 2; rock-wool and like infills sit outside the partition items per 4.13.20 and execute under 4.11.1 to 4.11.10 (insulation); boards are determined per face, doubled where two-faced, per 4.13.16 item 3; partition quantities per 4.13.27 compute on the frame envelope area without deducting single holes of 0.30 m2 or less.
- ←
Wall and column plaster items in TB/T 10831-2024 Railway Works Budget Quota Manual Volume 10 (building works) - general plaster FY-1346 to 1358, decorative plaster FY-1359 to 1376 - the missing wall levelling screed, and plaster measurement rules
Volume 10 "section 2 wall and column works" sets only (1) general plaster (FY-1346 to FY-1358) and (2) decorative plaster (FY-1359 to FY-1376) - no standalone "wall levelling screed" item; general plaster content already includes "multi-coat levelling and finish trowelling", and only decorative backing runs on FY-1374 "decorative plaster, backing and levelling, 15 thick". Levelling a wall with no finish is a quota gap - never borrow FY-1189 to FY-1193 floor levelling screeds or roof screeds (position, process and measurement all differ).
- ←
Quota line-item application for pneumatic ON/OFF valves (gate/ball valves) under the consumption standard: no separate line item by actuation mode - valve body installation under the piping chapters, checking and wiring under the automatic control instrumentation / electrical chapters, complete-set actuators not split off (DB11/T 2382-2024)
Pneumatic ON/OFF valves (gate/ball valves) are priced as two separate entries: (1) valve body installation applies the valve installation line items of the piping chapter the valve belongs to - industrial pipeline works set items "according to influencing factors such as valve type and size" (6.8.48; likewise medium- and high-pressure), while water supply and drainage, heating and gas works set items "according to influencing factors such as valve type, connection form and size" (6.10.47); the actuation mode (pneumatic/electric) does not create separate line items; (2) checking and wiring follows the corresponding "valve checking and wiring" items of the automatic control instrumentation works (6.6.20 item 1, for regulating valves already installed on the pipelines, such as butterfly valves, on/off valves and shut-off valves), while checking and wiring of electrically actuated valves follows the corresponding items of the electrical equipment installation works (6.8.51). Quantities of electrically and pneumatically actuated regulating valves are measured as complete-set installation and commissioning, including the actuator and the valve, the handwheel and the supplied complete-set accessories, and must not be split off and counted separately (6.6.21).
- ←
Pricing归属 of foundation probing (rod probing/tamping) in Beijing: already综合 in the manual-excavation item work contents, not itemized separately
Beijing DB11/T 2382-2024, 4.2.2: "manual excavation consumption is determined by soil class and shall include rod probing and bottom tamping" — foundation probing has no separate item; it is priced with the manual digging/pit items by soil class; with machine digging, hand trimming of the base (300mm where design is silent) uses the manual items, probing included (4.2.2(3), 4.2.15(2)). On the BOQ side, GB/T 50854-2024 makes base probing a "base treatment method" characteristic description, not a standalone code. Genuine separate listing (e.g., subcontract caliber) is a missing item — compile a supplementary unit-price estimate and guard against double pricing with the manual digging items.
- ←
Beijing DB11/T 2382-2024 consumption standard: quota-application method for water-tank (assembled / integral) installation - capacity banding, measurement per unit, and the treatment of accessories and peripheral works
Water-tank installation quantities shall be classified by total tank capacity and calculated by the numbers shown on the design (Clause 6.10.88), measured per "unit"; site panel assembly applies Table C.10.72-2 assembled-tank installation (work content includes panel assembly and water testing), and factory-finished whole tanks delivered to site apply Table C.10.72-1 integral-tank installation (including fitting-up of parts and the full-water test). Accessories supplied complete with the tank are included in the sub-item work content and not itemized separately; the tank body is priced as an unpriced main material/equipment; steel-section supports are executed under equipment-support fabrication and installation per Clause 6.10.41 (classified by support-group weight, calculated by the design mass in kg); control cabinets (panels) follow the electrical volume, and vibration-isolation devices follow the machinery volume.
- ←
Parapet inner-face plastering: interior or exterior wall items? Attribution method, regional norm precedents, and pricing points
At BOQ level (GB/T 50854-2024) there is no interior/exterior split — attribution is a norm-application question governed by the local current norm notes. The mainstream caliber treats it as exterior (merged into exterior plaster); some regions explicitly use interior items with factors — e.g., Shaanxi 2024: parapets without drip-nose bricks take interior items x 1.10, with drip-nose x 1.30; the outer face merges into exterior. Interior vs exterior items differ sharply (railway general plaster labor differs about 63%), so attribution drives cost.
- ←
Applying quotas to copper wire in conduit: distinguishing "lighting" vs "power" wire-pulling sub-items (<=4 mm2 classified by use; Beijing 2024 C4-11-284/C4-11-288 compared)
Conduit wire-pulling sub-items are classified by use, not cross-section alone: wires <= 4 mm2 for lighting and similar uses (including ordinary 220 V socket circuits) take lighting sub-items; power uses or lighting circuits > 4 mm2 take power sub-items. 4 mm2 is the overlap tier between Beijing 2024's lighting table (C4-11-284) and power table (C4-11-288) — attribution follows use; Shenzhen SJG 181.7-2024 Clause 6.1.2 states expressly: lighting-circuit conductors >= 6 mm2 execute the corresponding power-circuit wire-pulling sub-items.
- ←
Pricing pavement removal: selection criteria between milling and demolition sub-items, with corresponding Beijing DB11/T 2382-2024 Appendix D municipal sub-items and consumptions
Pavement removal is not a binary choice but split by construction essence: asphalt course shaving (maintenance/overlay, milling machine, milled material loaded and recycled) applies milling sub-items; wholesale pavement excavation (structure abolition, pipeline trenching) applies demolition sub-items; full-depth cement-concrete removal can only apply demolition (the milling group has only a "texturing within 1 cm" tier); pre-overlay surface texturing applies milling - texturing. Criteria: material, depth, and the approved method-statement process — all three indispensable. Beijing 2024: milling group D1-6-14-19 (100 m2), demolition group D1-6-1-6, 8-9, 10-11, 26-29 (pneumatic-pick type per 10 m2, mechanical per 100 m2); milling work content already includes loading (do not double-count loading), demolition only "piling old material" without loading/haul — count separately; demolition of pavement/base courses is computed by area.
- ←
Waterproof protective layer (protection over membrane waterproofing): quantity calculation, BOQ itemization, and norm application — roof, floor, and foundation positions
Protective layers are computed by design-shown area (m2) (DB11/T 2382-2024, 4.10.27): roofs follow the roofing caliber (flat roofs by horizontal projection, sloped by slope area; upturns and gutters merge, 4.10.20); floors do not deduct partition walls and single <= 0.30 m2 columns/piers/holes, upturns <= 300mm merge (4.10.25); > 300mm executes wall waterproofing (4.10.16); foundation upturned beams merge by developed area (4.10.26). In BOQs, roof protection uses "rigid roofing layer" with its function described (GB/T 50854-2024, J.6.5); foundation/floor fine-stone concrete protection uses "fine-stone concrete floor" (J.6.11); reinforcement mesh listed separately (J.6.12); Beijing lists protective-layer items separately (2021: 9-265~267; 2024: A-9-264~267), all in m2.
- ←
Quantity take-off for curb backrests (concrete support behind curbs) and pricing by applying quota line items under Beijing DB11/T 2382-2024 (sub-items D2-3-44, D2-5-1, E-3-75)
Curb backrests (back-support concrete) are measured separately in m3 per the design dimensions (section area x length), listed apart from curb setting (measured in m); under Beijing DB11/T 2382-2024 municipal works apply D2-3-44 concrete support behind curbs (per m3: composite labor class II 0.9480 workdays, ready-mixed pea-gravel concrete C20 1.0100 m3, 4 t water truck 0.0615 shifts); landscape projects apply E-3-75 (identical consumptions), with formwork under D2-5-1 formwork curb (m2); note D2-3-43 "cast-in-place concrete curb" (C30) is the curb-body sub-item, not the backrest.
- ←
Septic tank pricing by applying quota line items (Beijing DB11/T 2382-2024 structures works): line-item selection along the three construction routes of cast-in-place concrete / masonry / GRP factory-made tanks, work content already included, and measurement adjustment rules
Under the Beijing DB11/T 2382-2024 system a septic tank belongs to the structures works and is priced by a composite line item per tank ("zuo"): cast-in-place concrete tanks use Table F.1.5-2.4 (F-1-57 to F-1-79, selecting size number / effective volume / with or without groundwater / H+h earth cover), masonry tanks use Table F.2.3-2.1 (F-2-10 to F-2-23), and GRP factory-made tanks use F.3.2 (from F-3-107, further selecting trafficable / non-trafficable); the items already include earthworks, rebar, waterproofing and covers (factory-made tanks also include the riser and vent pipe) and must not be double counted; formwork is billed separately under the preliminary (measures) items; where the riser height differs from the standard atlas, adjust by the number of risers using the "riser, for each 0.10 m increase or decrease" items; integral precast concrete tanks delivered and installed on site are work items not covered by the quota manuals and are handled through supplementary quota items.
- ←
Pricing caliber for reserved holes and hole blocking of sanitary fixtures and pipes (Beijing 2024 consumption standard): fixture installation includes "reserving/blocking", sleeves include blocking — neither counted separately; only where pipes have no sleeve does the "hole blocking" sub-item apply
Per DB11/T 2382-2024 Appendix C general installation: sanitary-fixture sub-items' work content already includes "reserving/blocking holes" (e.g., C10-6-36), so reservation and blocking are not counted separately; where pipes pass walls/floors with sleeves, blocking is included in the sleeve fabrication/installation sub-items (C10-4-75, C10-4-52); only where pipes pass without sleeves is blocking computed separately under Table C.10.28 "hole blocking" (C10-4-95/96, tiered at 0.01/0.05 m3 per hole, measured in m3). The three situations are mutually exclusive — no double pricing.
- ←
Beijing 2024 consumption standard (DB11/T 2382-2024) waterproof mortar: sub-item selection cross-referenced by position and method - roof A-9-83/84/85/89, walls A-9-166/167, floors A-9-209
Under Appendix A.9 of the Beijing 2024 "Construction Consumption Standard" (DB11/T 2382-2024), waterproof mortar has independent sub-items set by "position + method" and they must not be applied across positions: within the roof rigid-waterproofing table, A-9-84 (with waterproofing agent), A-9-83 (SF polymer), A-9-85 (cementitious capillary crystalline), A-9-89 (waterproof concrete); walls A-9-166 (dry-mixed rendering mortar DP M10 + waterproofing agent), A-9-167 (SF polymer); floors A-9-209 (with waterproofing agent). All are measured in m2; the corresponding 2021-edition numbers are 9-84/9-83/9-85/9-89, 9-166/9-167 and 9-209 (the 2024 edition adds the "A-" prefix in one-to-one correspondence).
- ←
Beijing DB11/T 2382-2024 quota application for cooling-tower installation: Table C.7.11 banded by treated water flow, the applicability basis for closed-circuit towers and the multi-motor coefficient
Cooling-tower (including closed-circuit tower) installation applies "Table C.7.11 cooling-tower installation" of the general installation works of Beijing DB11/T 2382-2024 "Construction Consumption Standard", banded by the tower's own cooling-water flow (treated flow) and measured per "unit" (C7-1-166 is the within-100 m3/h band, C7-1-171 the within-700 m3/h band); Clause 6.7.23 provides that quantities are calculated by the numbers shown on the design; where one tower is fitted with multiple motors, the corresponding item is executed by the total cooling-water flow with the labor and tool consumptions multiplied by 1.1; the work content excludes on-site assembly, and anchor bolts are considered supplied with the equipment.
- ←
Painting works on canopies, eaves, balconies, and stair soffits: classify by position into ceiling-surface coating items, not by indoor/outdoor (Beijing DB11/T 2382-2024)
Canopy, eaves, balcony, and stair soffit plastering follows ceiling-plastering calibers; the corresponding painting (putty/paint) uses ceiling-surface coating items (e.g., Beijing A-14-118 "ceiling paint, emulsion, two coats"; 2021 edition 14-118), not interior- or exterior-wall items; painting items split by position (interior wall/exterior wall/ceiling surface), not by indoor/outdoor — only exposed vertical canopy faces take exterior-wall paint, and single painted areas <= 0.50 m2 follow miscellaneous-item paint (DB11/T 2382-2024, 4.14.2, 4.14.10, 4.15.6, 4.15.8).
- ←
Quota sub-item application and BOQ itemizing basis for special switch panels (sound-light control / key-switch / sensor / residual-current protection) (Beijing DB11/T 2382-2024 sub-items + GB/T 50856-2024 BOQ rules)
The Beijing 2024 consumption standard sets dedicated sub-items for special switch panels (no need to borrow): sound-light control (time-delay energy-saving) applies C4-4-113 time-delay energy-saving concealed switch (0.052 work-days/unit); key-operated switch applies C4-4-115 (0.061 work-days/unit); sensor panels apply C4-4-117 (0.085 work-days/set); rail-mounted residual-current protective switches apply C4-4-48/49 "single-phase" and C4-4-50 "with fuse" (0.05/0.226/0.535 work-days/unit); main materials enter at actual prices. BOQ itemizing per GB/T 50856-2024: sound-light-control types fall under "lighting switches" (Table D.13.1 note 9), residual-current switches under "low-voltage electrical switches / residual-current protective switches" (Table D.5.1 note 1), smart-home panels under Table E.7.1 (code 030507).
- ←
Pricing rules for fan-coil-unit installation: the installation sub-item measured per "unit" by installation type, the unit body listed separately as an unpriced main material, and supports distinguished between supplied with the equipment (included) and fabricated on site (applying equipment-support fabrication and installation banded by each support's weight) - per Beijing DB11/T 2382-2024 Section 6.7, with a railway TB/T 10831-2024 quota comparison
FCU pricing splits into three blocks: (1) installation applies the corresponding "ventilation and air-conditioning works - fan coil installation" item, classified by installation type and counted by the design quantities per "unit" (DB11/T 2382-2024 Clause 6.7.11); (2) the equipment body is an unpriced main material listed separately at compilation-period prices, shown in brackets and excluded from the other-materials fee base (Clause 6.7.3); (3) supports are judged first by supply mode: supports/underlay supplied with the equipment are included in the equipment-installation consumptions and not re-applied (Clause 6.7.5), while site-fabricated supports apply "equipment-support fabrication and installation", classified by each support's weight and calculated by the design mass (Clause 6.7.24). Railway TB/T 10831-2024 comparison: FCU exposed FY-2670 (RMB 69.13/unit), concealed FY-2671 (RMB 172.46/unit); equipment supports FY-2675 (<= 50 kg, RMB 907.54/100 kg), FY-2676 (> 50 kg, RMB 624.47/100 kg).
- ←
Pricing steel ladders and the built-in ladders (steps) of inspection chambers: quantities by mass at design-shown dimensions, quota item attribution, and the "already inside the chamber item, not charged again" test
Steel ladders are measured by mass (t) at design-shown dimensions, without deducting holes and without adding welding rods, rivets or bolts (DB11/T 2382-2024 clause 4.7.17 item 1; municipal networks clause 7.4.17); steel ladders execute as "stepped steel ladders", embedded or welded-to-insert rolled-angle treads may execute as sundry steel members (clause 4.7.10). The steps / ladders inside inspection chambers are mostly already in the standard-chamber items' work content (e.g. D4-6-178 "chamber step and cover installation"; railway LY-441 "rung installation") and may not be listed again; where a separate item is truly needed, count in kg by design-shown weight (SJG 111.2-2022 clause 3.2.4); finished steps count by design-shown number (DB11/T 2382-2024 clause 9.3.5 item 6). Standard-chamber ladders are compiled in plastic-steel - differing designs convert the ladder material only, all else unchanged (SJG 181.4-2024 clause 3.1.3).
- ←
Attribution and pricing of round-to-rectangular transition ducts (rectangular-to-round reducers) in ventilation and air-conditioning: they are duct fittings priced with the duct fabrication and installation (030702), not listed as duct components (030703) - avoiding double counting
The round-to-rectangular transition (rectangular-to-round reducer) is a duct "fitting", not a "component": per GB/T 50856-2024 Annex G table G.2.1 (duct fabrication and installation, code 030702), note 1, duct length follows the design-shown centreline (mains and branches dividing at the centreline intersection), "including the lengths of elbows, tees, reducers, round-to-rectangular transitions and other fittings, but excluding the lengths occupied by components"; the transition's axial length merges into the connected duct's centreline length and its developed area into the duct's developed area, priced together under 030702 - neither a separate bill item nor a separate quota item; duct developed area deducts no inspection, measuring, supply or exhaust openings, excludes overlapping duct and mouth areas, and tapered runs compute on mean diameter (round) or mean girth (rectangular). Valves, diffusers, silencers and other components list separately per table G.3.1 (030703) - listing the transition as a component double counts.
- ←
Handling specifications beyond a quota item's largest step (over the top band): no proportional extrapolation - a four-step ladder of volume-note wording first, analogous items next, supplementary quota last
A specification over the top band is a "quota gap", not a "quota conversion" - conversion stands only where the quota text expressly allows it; beyond the largest step no band exists, and extrapolation by capacity ratio or diameter ratio, or "unsupported coefficients", is strictly barred (that is over- and mis-application). The correct order: (1) check the volume / chapter notes for express wording (execute under another volume or discipline; multiply the stated coefficient beyond stated conditions; execute under same-class items for other types / bands); (2) take the band within - never extrapolate; (3) borrow analogous construction-process quotas (across volumes or sectors / regions, listing the basis and taking on-costs per the borrowed volume); (4) with nothing analogous, compile a supplementary unit-rate build-up schedule and obtain approval / file it (power requires approval of the quota authority; railway files with the sector standard authority and may substitute provincial local quotas).
- ←
Quota application for tile-and-stone grout sealing on floors: the tiling items' work content ends at joint wiping and pointing, excluding grout sealing - it needs its own item; the grout item is chosen in three steps: dedicated item first, then a tile-finish table item carrying sealant consumption, else a supplementary quota or market rate build-up
The work content of tiling items ends at "joint wiping / pointing" (cement slurry or jointing compound fill) and excludes grout sealing; two-component sealants and epoxy coloured sand are separate workings needing separate items or description in the bill item descriptions. Choose the grout item in three steps: (1) where the region has a dedicated "grout sealing" item, apply it (e.g. Hunan 2024 (2025 edition in the source data) A11-200 tile grout sealing, m2); (2) else where the tile-finish table holds an item with sealant consumption, apply that (e.g. Beijing DB11/T 2382-2024 A-11-67: all-in labour Grade I 0.0240 workday/m2, two-component sealant 400 ml 0.1040 set/m2, other materials 1.5%, plant 2%, unit m2); (3) else compile a supplementary quota or build up from market labour and materials, confirmed by the employer / quota authority. Red lines: tiling items already contain wiping / pointing - never add a pointing item on top; never over-apply movement-joint caulking or curtain-wall silicone items.
- ←
Deciding quota pricing of combustible gas alarms across systems: the split between the industrial-instrument "safety monitoring device" (per set) and the fire "point-type detector" (per unit), the code basis and the unit difference
Pricing a combustible gas alarm is not "either-or, take the dearer" but a match on three gauges: (1) system attribution (which controller receives the alarm signal); (2) device make-up (a lone sensor head, or head plus alarm controller as a set); (3) the quota item's unit and work content. Signals into DCS / PLC used for process interlocks price under the automatic-control instrument "safety monitoring device - combustible gas alarm" per "set" (integral installation of head plus alarm, system test); signals into the fire alarm panel used only for warning and fire interlocks price as "point-type detector - combustible gas" per "unit" (head plus base, in-situ commissioning). The hardest basis is GB 50116-2013 clause 8.1.2: "the combustible gas detection and alarm system shall stand alone, and combustible gas detectors shall not connect into the detector loops of the fire alarm panel; where the gas alarm signal must enter the automatic fire alarm system, it shall be brought in through the combustible gas alarm controller." Writing one basis down (or up) into the other is mis-application / unsupported cross-system borrowing, refutable on the code.
- ←
Bill listing and quota application for installing water-treatment plant (plate-and-frame sludge dewatering machines / filter presses): the dividing line between general building services GB/T 50856 and municipal GB/T 50857, and the corresponding items of local municipal consumption standards
Plate-and-frame filter presses (plate-and-frame sludge dewatering machines) are "water-treatment plant": the bill must list them per GB/T 50857-2024 (quantity take-off standard for municipal works) Annex F water-treatment equipment (code 040602) per "unit" - GB/T 50856-2024 Annex C C.9.7 states "the installation of sewage treatment equipment and other water-treatment equipment shall be coded per the corresponding items of the current national standard GB/T 50857"; companion standard plant such as pumps, valves and instruments lists under GB/T 50856 (GB/T 50857-2024 F.3.2). Apply the equipment installation items of the municipal water-treatment volume (the specialist water-treatment items are not in the installation volumes): e.g. Beijing DB11/T 2382-2024 Annex D table D.5.29-4, items D5-2-228 (plates 810 x 810) / D5-2-229 (870 x 870); Shenzhen SJG 181.5-2024 Volume 5, 2.3.24; the Hunan 2024 municipal consumption standard, water-treatment equipment chapter, "sludge dewatering machine installation".
- ←
Deciding the quota items for pre-laid bond waterproof sheets: taking foundation sheet waterproofing under Beijing DB11/T 2382-2024 as the example, separating the "pre-laying method" items from the "torch-on method" items by construction process, with item work content, consumption and the companion measurement rules
Pre-laid bond (polymer self-adhesive film sheets) takes the "pre-laying method" items: Beijing DB11/T 2382-2024 foundation sheet waterproofing A-9-243 (HDPE self-adhesive film sheet, pre-laying, raft single layer, all-in labour Grade II 0.0630 workday/m2, HDPE film waterproof sheet 1.2 mm 1.3760 m2/m2) and A-9-244 (flat slab single layer, labour 0.0600 workday/m2, sheet 1.2510 m2/m2); the torch-on items must not be used. Basis: DB11/T 2382-2024 clause 4.10.8 "sheet waterproofing shall be itemised and determined by construction process"; the commentary to GB/T 51310-2018 clause 16.3.2 states plainly "cold-applied self-adhesive sheets must not be laid by the torch-on method".
- ←
Quota application and material attribution for stone-plastic composite (SPC) elevator door linings: classify by material into plastic decorative materials, take the finished door-and-window lining item with the main material swapped, or take the plastic decorative moulding and plastic decorative board finish items per the site detail
Stone-plastic composite (SPC - SPC boards, SPC mouldings) is a man-made composite finish material extruded from PVC resin and stone powder, belonging to the "plastic decorative materials" class - neither stone nor ceramic tile. It must not take the stone door-and-window lining items (e.g. Beijing DB11/T 2382-2024 Annex A table A.8.8, A-8-66 "door and window linings, stone", whose main material is locked to "finished stone 20 mm") nor the tile-finish items; the iron rule is "classify by the actual material, not by the stone-like pattern or the word 'stone' in the name". Current quotas carry no standalone "stone-plastic" item (absent in Beijing 2024, railway TB/T 10831-2024 Volume 10 and Hunan 2025) - a new-material gap: apply the item with "same process, similar material" and swap the main material (marking the conversion "converted"); where nothing is analogous, compile a supplementary unit-rate build-up schedule for approval. Finished SPC door linings take the "door and window linings" finished-set installation item (e.g. Beijing A-8-64, 0.0770 workday/m2 + finished timber door lining 1.000 m2/m2), swapping the finished timber lining for the finished SPC lining; moulding assembly takes the decorative moulding items (railway FY-1949 to FY-1957 plastic decorative mouldings); board adhesion takes the plastic decorative board finish items (Beijing A-12-176). Quantities by developed area at design-shown dimensions (Beijing 4.9.12; railway Volume 10 volume notes IX.7).
- ←
Pricing channels for works outside the contract scope and unforeseen works: recognising and pricing additional works, when dayworks apply, and the rules for using provisional sums
Where the contractor, at the employer's request, completes additional works outside the agreed scope, the price may be computed per the item-setting requirements, measurement rules, contract rates and tendered rate levels of the national and sector quantity take-off standards, or the measurement and pricing rules may be renegotiated and an additional-works contract or supplementary agreement signed (GB/T 50500-2024 clause 8.10.1). In settlement review, where the parties have not jointly recognised additional works, then absent contract agreement otherwise, any of "contract scope = whole project / single work -> a single work added", "single work -> ancillary or independently tenderable specialist works outside the scope added", "specialist subcontract -> other specialist works outside the scope added" recognises the addition; without a supplementary agreement and without clear pricing principles and methods, the original contract's principles do not necessarily apply (T/ZBD 100.5-2023 clause 3.1.10). Ten classes of matters - added or substituted works not measurable from drawings / variations / contract rules etc. - may be measured and priced as dayworks (clause 7.5.2); provisional sums serve insufficiently foreseeable or detailed works, measured and priced under the variation rules, the contract price adjusting for the difference from the provisional sum including VAT (clause 8.3.2).
- ←
Sorting out the measurement of underfloor heating coils (floor radiant heating pipes): the bill measures the net area of heated rooms (m2), the quota measures the design-shown pipe length (m), and the boundary between heating pipes and manifolds
Bill (measurement) basis: GB/T 50856 Annex K table K.4.1 "heating appliances" (code 031004) measures floor radiant heating by net heated-room area in m2. Quota (consumption) basis: floor radiant heating pipe laying is computed by design-shown length in m (e.g. Beijing DB11/T 2382-2024 clause 6.10.76); the two are bridged by the net-area-to-pipe-length contents of table 6.10.76 (pipe OD 16 mm = 6.300, 20 mm = 5.775, in m per m2 of net area). The boundary with manifolds sits at the branch-pipe connections off the distributor: on the heating-pipe side, from the distributor outlet to the collector connection (including the riser from floor level to the connecting fitting); the heat-medium distribution and collection unit (manifold) is listed separately per "set".
- ←
Whether conversion is allowed when the actual construction process differs from the quota norms: general principle, permitted situations, prohibited red lines, and the step-down path for missing items
General principle: quota norms are compiled on the basis of a rational project execution plan (construction methodology and site organization) and normal conditions; except where the quota norms expressly allow conversion, no change to the quota norms is permitted because the project execution plan, operating method, or material consumption differs from the quota norms (DB63/T 2013-2022 Clause 5.5). Permitted conversions require express written rules (strength grades per mix-ratio tables; dry-to-wet mortar at 1.75 t + 0.3 m3 water = approx. 1.0 m3 wet mix plus deduction of the tank mixer shift; fair-faced wall labour cost coefficients 1.15/1.30; admixtures counted separately; ready-mixed concrete deducts the mixing equipment); different mix ratios, cement types, or machinery types/specifications are never convertible. Where conversion is impossible, step down: adjusted application -> quota of similar processes -> compiling a supplementary quota item submitted for approval.
- ←
Quota attribution of piping in heat-exchange (thermal substation) station houses: three-way split among process piping, water/heating, and HVAC, plus indoor/outdoor boundaries and pressure tiering
Station piping does not take a single volume: by medium/function — in-station thermal process piping (primary/secondary, condensate, heat-exchanger unit piping) under process piping by pressure tier (low P <= 1.6 MPa; medium 1.6 < P <= 10 MPa); in-station heating, water supply, drainage, and sanitary equipment under water/heating; in-station refrigeration piping and air ducts under HVAC. Station-type piping (boiler rooms, pump houses) bounded by the inner wall face; railway: network and process piping bounded at the first valve pit outside or the building face; medium/high pressure executes Vol. 12 depot machinery works.
- ←
BOQ and quota item selection for compact package unit substations (prefabricated substations): the mainstream principle of billing the complete unit per set; splitting into transformer plus HV/LV panels only for non-package supply, missing quota bands or contract-required splits; with commissioning and handover-test interfaces and a Beijing / Shenzhen / railway / national-standard comparison
For package unit substations (compact / prefabricated substations) the principle is to bill the complete unit: apply one installation item per set by capacity band, the work content already covering positioning, wiring and checking, earthing and individual commissioning, with no split into transformer plus HV/LV panels; only non-package supply, missing quota bands or contract-required splits justify splitting, split and unsplit being mutually exclusive with strictly no double counting of included content. Beijing DB11/T 2382-2024 clause 6.4.19 (one container body counts as one unit), Shenzhen SJG 181.7-2024 (measured per set) and GB/T 50856-2024 (switchgear installation 030402 covers prefabricated substations; clause 3.0.11 - equipment installation includes commissioning of the equipment itself) are consistent; railway TB/T 10829-2024 splits installation (DY-1074 to DY-1084) and commissioning (DY-1407 to DY-1410) into two items per unit, likewise without splitting the body.
- ←
Distinguishing and applying tile (block) finishes vs stone finishes: separate BOQ items and three quota criteria (material -> size -> workmanship)
"Block finish" carries two senses — a collective chapter name (all slab finishes including stone) and a material-specific sense (non-stone tiles); which sub-item applies is decided by the face material, not the table name: those consuming natural-stone facing panels/marble apply stone sub-items; those consuming floor tiles, glazed tiles and other ceramics apply block sub-items; in GB/T 50854-2024, stone floors / rubble-stone floors / tile floors (code 011102) and stone wall-columns / rubble / tile wall-columns (code 011203) are separate BOQ items priced under their own quotas; the railway caliber expressly runs vitrified tiles under ceramic-tile sub-items and stone within 100x100 under accent sub-items.
- ←
Railway 2024 quota norms (prescribed resource consumption standards; TB/T 10822-2024): subgrade slope smooth (pre-split) blasting and deep-hole blasting — application of quota items and dual area/volume overlay measurement rules
In the Railway 2024 quota norms, smooth (pre-split) blasting is an independent quota item family LY-58/59/60 (hole diameter 70-120 mm, unit of measurement 100 m2, measured by design slope area) that must be applied separately and 'shall be used in addition to other rock-excavation quota norms'; the main deep-hole blasting LY-46~51 is measured per the natural in-situ (undisturbed) volume inside the design excavation line (100 m3). The two are priced cumulatively, with quantities mutually non-deducting and each listed independently.
- ←
Applying the railway subgrade controlled-blasting quota: class A/B/C judgment conditions and item selection (TB/T 10822-2024, Volume 1, Chapter 1)
The controlled-blasting quota applies only to rock excavation "near an existing railway where a second track is added and blasting must be controlled", classed A/B/C by construction conditions (A strictest: line spacing <=5 m, cut height >=8 m, cut thickness <=4 m, existing slope >1:0.5, sub-hard rock or harder; B: spacing <=10 m, thickness <=10 m, existing slope <=1:0.5; C: neither A nor B, but no natural screen within 50 m of the existing cut slope crest), judged in A->B->C order. The quota already includes possession-caused efficiency loss — no train-interference construction additional fee. Without an existing line (e.g., near villages only), controlled blasting does not apply: use deep/shallow-hole blasting (spoil or requiring crushing: LY-46/47/48/52/53/54; direct cut-to-fill: LY-49/50/51/55/56/57) or static blasting + rock breaking, plus the blast-coverage quota per the blast design.
- ←
Handling path for missing quota items: similar-process application -> compilation from similar-project data -> compilation from technical conditions -> approval/filing (including power and railway industry differences)
Missing quota items are handled in step-down order: (1) preferentially refer to quotas of similar construction processes (power first refers to similar power quotas, then cross-industry/local ones with matching fee standards); (2) with no similar sub-item but similar-project budget/settlement data available, compile the supplementary quota therefrom; (3) with no data, compile per the project's specific technical conditions; (4) submit the supplementary quota to the quota administration agency for approval before use; in railway, file a copy with the industry standard administration agency. Railway passenger station buildings, canopies, and overpasses may borrow the provincial local quota at the project location with matching fee standards. Unapproved supplementary quotas do not stand in settlement and audit.
- ←
Applying quota items to civil-defence duct airtight sleeves (airtight wall-penetrating spools with sealing flange rings) under the Beijing 2024 consumption quota standard: select Type I / III by the wall-penetration form, band by diameter within d300 / d600 / d1000, measured per "piece"; fabrication and installation of the sealing rib and the spool body are included in the item and not charged separately
Civil-defence duct airtight sleeves take the dedicated "pipes through airtight walls" tables: where a plain steel-plate duct is cast directly into the reinforced concrete wall, take Type I (C7-11-68/69/70, within d300/d600/d1000); where the duct is not cast in and a spool with a sealing flange ring is embedded, take Type III (C7-11-72/73/74), measured per "piece" (one per penetration); the sealing rib (sealing flange ring) and the spool body, both fabrication and installation, are already included in the item consumption (plate 2.6 mm to 3.2 mm is the spool body, 4.1 mm to 7 mm is the flange ring) - no separate sealing-rib / steel-piece item, and no duplicate charging of the main material.
- ←
Bill-of-quantities listing of railings, panels and handrails (GB/T 50854-2024 Annex Q table Q.3.1, code 011503) and mapping to the Beijing 2024 consumption standard quota items: glass panels, finished railings and cast-iron scroll railings, dual measurement by area and by length, and the rule that bend lengths enter the centreline length
Railing, panel and handrail decoration lists under GB/T 50854-2024 Annex Q table Q.3.1 (code 011503); material and post-cap differences go into the item description, not separate codes. Under Beijing DB11/T 2382-2024, railings (panels) are measured by area m2 at design-shown dimensions and handrails and accessibility railings by handrail centreline length m (bends included), with no addition for parts embedded in the structure; where railing / panel and handrail are installed as one unit, the railing / panel items execute and the handrail item does not. Item mapping: metal stair railings (panels) A-15-52 to A-15-61 mostly m2 (only A-15-60 accessibility railings by m), metal stair handrails A-15-62 to A-15-64 by m, hardwood handrails in the hardwood railing table A-15-67 to A-15-69 by m.
- ←
Applying quotas to highway signs and pavement markings: composition of sub-items 5-1-4 signs and 5-1-5 pavement markings, quantity rules, and finished-price points (JTG/T 3832-2018 Part 5)
For highway signs apply 5-1-4 signs (steel-plate signs split by single-post/double-post/single-cantilever/double-cantilever/gantry, each further split into post and panel sub-items, priced at finished-product rates excluding reflective sheeting); for markings apply 5-1-5 pavement markings (ordinary, hot-melt, rumble, two-component markings, colored surfacing, reflective road studs, rubber speed humps, etc.). Metal sign posts and panels are each computed by total mass; pavement markings by net marked area.
- ←
Curb (kerbstone) vs pavement construction sequence and installation essentials: embedded curbs must be set before surface courses; curb bases preferably built with the road base
Overall curb sequence: survey and trench -> curb base (preferably with the road base) -> set curbs on mortar and fill joints -> backrest concrete and backfill compaction -> finally pave the surface course. Embedded curbs must be fully installed before asphalt/structural layers; cutting the finished surface to bury curbs is strictly forbidden; interlocking-block pavements require curbs first. Installation controls: stakes at 10-15m on straights, 5-10m on curves, 1-5m at intersections; full dry-hard mortar bedding; backrest backfill compacted >= 500mm wide, >= 150mm high, >= 90% compaction; M10 mortar jointing, cured >= 3d at normal temperature.
- ←
Checklist of permitted quota-conversion situations and prohibited red lines: when conversion is allowed and how to convert
Quota conversion takes "express permission in the quota provisions" as the sole premise (DB63/T 2013-2022 §5.5): only prescribed situations may be converted — strength grades per mix-ratio tables; stabilized-soil base mix ratios per Ci=[Cd+Bd×(H−H0)]×Li/Ld; compaction thickness over the limit with layered machinery shifts ×2.0; dry/wet mortar interchange (1.75 t dry mix + 0.3 m3 water ≈ 1 m3 wet mix); labor coefficients for structural differences such as fair-faced walls/arcs/extra height; supply modes such as ready-mixed concrete/centralized mixing; admixtures counted separately; missing items compiled as supplementary quotas submitted for approval. Actual mix ratios (unless the notes allow), cement types, and machinery types/specifications are never convertible; after conversion, mark the item number with "converted" for traceability.
- ←
TB/T 10823-2024 bridge volume over-water construction definition: by construction method, not water depth (vessel work/trestle/island building); depth only sets the drilling platform step
The "over-water" definition in TB/T 10823-2024 Volume 2 looks at construction method with no numeric depth boundary: over-water quotas apply to works designed to be executed from vessels and to works on over-water trestles not connected to land; where the trestle connects to land, concrete switches to land mixing and transport, concreting and rebar adjust vessel counts per the project execution plan (construction methodology and site organization), and river flats and mid-water islands use land quotas. Depth only sets the over-water drilling platform step: QY-219 dia <=2.0 m depth <=5 m; QY-220 dia <=3.5 m depth <=10 m; QY-221 dia <=3.5 m depth <=20 m; QY-218 platform on steel cofferdam. At equal diameter and stratum, over-water drilling costs about 2.2x land; the gap is mainly vessel plant + about 40% more labor + shaped-steel positioning materials; underwater concreting is about 4.4x; over-water also needs the working platform — the largest single share of the total gap.
- ←
Railway 2024 quotas — erecting concrete poles: item selection by pole type + pole height (TB/T 10829-2024 Volume 8 power works, DY-25~DY-35)
In TB/T 10829-2024 Volume 8, Chapter 1 overhead power lines, Section 2 pole and tower erection, concrete poles step by "pole type (tapered / uniform-diameter / strut) + pole height" (DY-25~DY-35), not by weight; quantities per design count in "poles". Pole main-material consumptions are bracketed — items carry no material cost or weight; book main materials separately per design. Heights beyond the steps (tapered >18 m, uniform-diameter >21 m) have no item — handle by the supplementary-quota procedure.
- ←
Brick permanent formwork (brick mold / brick side form): quantity calculation and pricing calibers — by volume, priced under brick-foundation items, plastering separate, with regional preliminaries differences
Brick formwork quantities are computed by design-shown volume (m3): centerline length around the wrapped member x masonry height x design thickness, with brick-foundation rules (no deduction of spread-footing T-joint overlaps or single holes <= 0.30 m2). The mainstream pricing applies the "brick foundation" item — expressly in railway TB/T 10831-2024, Shenzhen SJG 111.2-2022, and Shaanxi's new draft; inner-face plastering prices separately under interior general plaster (Shenzhen: labor x 0.90); positions with brick formwork take no concrete side formwork. Regional difference: Shenzhen's building system lists brick formwork and its plastering under measures — concrete/reinforced formwork (SJG 77-2020, 5.5.3).
- ←
TB/T 10825-2024 track quota: CWR track laying and rail-material transport compiled at "rail length <=500 m" — laying longer rail strings (unit sections) applies directly, no conversion, no extra booking
Under the railway 2024 quotas (TB/T 10825-2024 Volume 4 track works), long-rail laying for CWR (GY-9~11, GY-24~30) and rail-material transport (GY-31~36) are all compiled at "rail length <=500 m"; units are track-km laid / 1 km of rail material, consumptions amortized per kilometre — "<=500 m" is a compilation basis, not a ceiling. Laying long rails beyond 500 m on site (design unit sections preferably 1000-2000 m, TB 10015-2012 Clause 4.5.1) applies directly, with no conversion factor and no "excess booked separately" clause; rail-string joints use the on-site rail welding quota separately; closure sawing and rail drilling per Chapter 6. Wherever the volume requires adjustment it lists a factor (grade >20 permille x1.5, tunnel >1 km x1.25, both x1.75, etc.); no factor means apply directly.
- ←
Rules when quota plant differs from the plant actually used on site: machine-shift consumption locked, adjustment for price differentials, and three legitimate paths
Where the type or specification of plant differs from that actually used in construction, the machine-shift consumption (quantity) is locked and no conversion is permitted — higher or lower actual plant efficiency is no ground for adjusting the quantity; the only permissible routes are three: (1) plant adjustments expressly laid down in the quota norms (e.g. layered compaction machine-shifts x 2.0, dry-mixed to wet-mixed mortar deducting mixer machine-shifts, switching to ready-mixed concrete deducting batching-plant machine-shifts); (2) where technical conditions differ materially, adapting and applying a similar quota; (3) where the machine-shift cost quota does not cover the item, compiling a supplementary machine-shift cost quota. Price differences are dealt with through adjustment for price differentials, with the quantity untouched: plant usage cost differential = quota machine-shift consumption x (machine-shift rate per machine-shift at the compilation date - machine-shift rate per machine-shift at the base date).
- ←
Route choice for pricing metal railings under quota standards: distinguishing factory-finished railings installed on site (decoration-works finished-railing items, by m2/m) from site fabrication and installation (steel-member items, by t) - covering Beijing DB11/T 2382-2024, the GB/T 50854-2024 bill-of-quantities position, and the railway TB/T 10831-2024 comparison
Metal railings first split into two routes by how the material arrives: where finished products are procured and only installed on site, apply the decoration-works finished-railing items (Beijing DB11/T 2382-2024 Annex A.15.3-1.1 metal stair railing (panel) table, A-15-52 to A-15-61, by m2/m, work content only "installation, fixing etc.", the main material being the finished railing); where material is cut, assembled and welded on site, apply the steel-member items (A.6.6 other steel members, A-6-35 steel guardrail, by t, main material "steel-pipe guardrail" 1.000 t/t entered as a semi-finished product). Bill-of-quantities position (GB/T 50854-2024): steel-member items are compiled on a semi-finished basis excluding fabrication - site fabrication is listed under the "fabrication of steel members" item code; metal products are compiled as finished products installed on site, excluding fabrication. Railway position (TB/T 10831-2024): steel-railing fabrication (FY-1975 to 1977, by angle steel / steel pipe / round and square steel) and installation (FY-1978) are separate, both by t; finished stainless-steel railings by 10 m (FY-1979 to 1981).
- ←
Sorting out the names SC conduit, welded steel pipe, galvanised steel pipe and hot-dip galvanised welded steel pipe (four dimensions: drawing designation, base-pipe process, corrosion protection, full standard name), the code requirements on galvanising (hot-dip mandatory, cold galvanising banned), and the general rule for quota attribution in installation works
The four names are not four parallel pipes. Welded steel pipe = the base-pipe process name (GB/T 3091-2008; steel strip rolled and welded, carrying water, sewage, gas, air, oil, heating steam and other low-pressure fluids). Galvanised steel pipe = welded steel pipe with a rust-proofing zinc coat on the wall (cold-galvanised versus hot-dip processes; cold-galvanised production of welded steel pipe is obsolete). Hot-dip galvanised steel pipe / hot-dip galvanised welded steel pipe = pipe whose inner and outer surfaces are treated by hot-dip galvanising (GB/T 50680-2012 clause 6.2.20). SC conduit = the habitual drawing designation for steel conduit in electrical construction documents (not a standard name). GB 50261-2017 clause 3.2.2 requires galvanised steel pipe to be hot-dip galvanised inside and out; cold-galvanised pipe is not allowed; CJJ 127-2009 clause 3.2.4 likewise requires welded and seamless steel pipes for building drainage to be hot-dip galvanised inside and out, with cold-galvanised steel pipe banned. Three keys to quota attribution: fix the discipline first, then whether galvanised, finally the laying / jointing method; laying of galvanised electrical conduit (galvanised steel conduit) takes the "galvanised steel pipe laying" items, and KBG conduit takes the JDG items (SJG 111.3-2022, conduit works notes).
- ←
Item-selection determination for graded-gravel replacement fill in excavation pits: the distinction among replacement-fill ground treatment (A-2-4 gravel spreading), foundation backfill and bedding layers, and quantity calculation (Beijing DB11/T 2382-2024 basis)
Under the Beijing DB11/T 2382-2024 "Construction Consumption Standard": the strengthening of soft or non-uniform soil layers after pit excavation is itemized as "replacement-fill ground treatment" (Appendix A, Table A.2.1-1); graded gravel uses A-2-4 "spreading, gravel" (m3; work content: spreading in layers, leveling, compaction), and sand/stone-chip replacement uses A-2-3. The replacement-fill sub-items exclude excavation of the in-situ soil (executed separately under Clauses 4.2.1 to 4.2.27); quantities are calculated by volume per the design dimensions (4.3.16). The distinction from backfill and bedding lies in position and design intent, not in material: foundation/room backfill uses backfill sub-items (e.g. A-1-38 graded sand-gravel; quantities calculated under 4.2.21/4.2.22), and bedding layers are itemized under the bedding tables A.4.5 and A.5.1-1 - the three must not be interchanged.
- ←
Scenario split for applying quota line items to PE-ERT pipes under Beijing DB11/T 2382-2024: assignment between floor radiant heating pipes (C10-7-41 to 43) and plastic water supply pipes (C10-2 / C10-1 series), with a comparison against PP-R and PE-X
Under Beijing DB11/T 2382-2024, PE-ERT pipes are priced by use scenario. Floor radiant heating pipes take C10-7-41 to 43 (pipe OD within 16/20/25 mm, unit m, under the heating-appliances items); the stated work content already covers "pipes of polyethylene and similar materials", so the items apply directly without material conversion. For plastic water supply pipes (fusion jointed), indoor takes C10-2-77 to 87, buried / in-wall takes C10-2-89 to 92, and outdoor takes C10-1-43 to 52. The floor-heating and water-supply line item families must never be cross-applied (the table note states expressly that buried laying "is not applicable to floor heating"); PP-R and PE-ERT share the same tables and items (main material converted per the design type), while PE-X cannot be fusion jointed and must not directly take the fusion-connection items.
- ←
Building automation system (BAS) / HVAC automatic control - BOQ item setting and appendix attribution under GB/T 50856-2024 Appendix E (code 030503)
HVAC automatic control / building automation (BAS) corresponds to the "building automation system" (code 030503) in GB/T 50856-2024 and is listed under Appendix E Building Intelligentization Engineering; items are set per Table E.3.1 (communication network control equipment 030503001, controllers 030503002, etc.; the unit of measurement is "unit (set)" and quantities are calculated as the numbers shown on the design drawings). Civil building automation systems apply Appendix E, while industrial automation systems shall be itemized under Appendix F Automation Control Instrument Installation Engineering; conduit, raceways, cable trays, junction boxes and electrical equipment associated with the intelligentization works shall be itemized under Appendix D Electrical Equipment Installation Engineering and must not be double-counted in the intelligentization BOQ.
- ←
Beijing DB11/T 2382-2024 general building services installation: quota item selection for cabinet (box-type) centrifugal fans - Table C.7.8-7 fan box items, discernment between the box-type and machinery-volume centrifugal fan scopes, and the treatment of supports, hangers and bottom bedding
Cabinet (box-type) centrifugal fan installation is priced under Table C.7.8-7 "fan box installation" (C7-1-104 to 115), banded by installation type and airflow and counted per unit (clause 6.7.17); ventilator installation in general industrial and civil building works follows the applicable ventilation and air-conditioning items (clause 6.1.37) and must not use the machinery-volume "centrifugal forced/induced draft fan" items; the installation items cover labour and plant only, the fan itself being unpriced equipment billed separately; supports and bottom bedding supplied with the equipment are already included and not billed again (clause 6.7.5), site-fabricated supports fall under Table C7.12-1 by the weight of each support and hangers under Table C7.12-2 per unit by fan model (clause 6.7.24).
- ←
Quota borrowing rules: other industry/specialty quotas may be borrowed for missing items; cross-region borrowing is limited to exceptions (railway station buildings, power review verification, etc.)
Borrowing quotas of other industries/regions for missing items is a legitimate step-down path, subject to triple constraints: (1) process similarity with priority to one's own industry quota; (2) fees follow the borrowed quota system (per the corresponding industry authority's provisions; mixing fee regimes is prohibited); (3) procedural records (power verifies at budget review; railway files a copy with the industry standard administration agency). Cross-region borrowing is inapplicable by default, with express exceptions: railway passenger station buildings etc. may borrow the provincial local quota at the project location (with matching labor/material/machinery prices and fee quotas), and power may directly reference and apply local quotas.
- ←
Whether one work content can apply multiple quota items: multi-sub-item rate build-up for BOQ items is allowed; duplicate application for the same process is prohibited
Determined in two layers: (1) one BOQ item applying multiple quota sub-items (pouring/formwork/rebar and other processes of different natures) is the normal practice of rate build-up — all-in unit rate = the sum of the sub-item amounts under the BOQ item divided by the BOQ quantity; (2) duplicate application for the same process or the same work content is prohibited — the quota work content is already complete, including all construction processes (preparation and finishing-up, on-site transport, small material handling, site cleaning, etc.), and applying separately for content already included is double counting; processes must not be split and separately listed. Judge by the nature of the process: processes of different natures may be applied separately; the same process only once.
- ←
Pricing position for post-cast strip formwork under Beijing DB11/T 2382-2024: measurement on contact area, dedicated items by position (never the beam-and-slab item), and treatment of the formwork height exceedance
Post-cast strip formwork and supports are measured on the contact area with the strip (clause 4.17.6 item 6); dedicated items apply by position - foundation strip A-16-41/42, wall strip A-16-43, slab-type strip A-16-44 - and the beam-and-slab, flat slab and flat plate items (A-16-33) must not be used. The quick-closure expanded-metal mesh for the side stop-ends is already contained in the post-cast strip concrete items (foundation slab, beams, walls 4.2 m/m3; floor slabs 2.1 m/m3) and is not priced separately. The height-exceeding part follows its host member under the "each additional 1 m above 3.60 m" items, computed on the whole area of the exceeding part; an exceeding part under 1 m still executes the per-additional-1 m item (clause 4.17.1 item 4).
- ←
Whether curing is priced separately when applying quotas to cement-concrete pavement: Beijing DB11/T 2382-2024, Shenzhen SJG 181.1-2024, and the highway quota all include curing
Cement-concrete pavement is priced by the surface-course sub-item; curing is already in the quota work content — no separate computation, no separate curing BOQ item. Beijing DB11/T 2382-2024 sub-item D2-2-20 "cement concrete surface course, 18 cm thick" work content verbatim includes "placing, vibrating, troweling, texturing, curing, etc."; Shenzhen SJG 181.1-2024 states expressly "cement-concrete pavement placing comprehensively considers pavement curing, not computed separately"; the highway system's sub-item 2-3-8 work content also includes "texturing and curing". Three calibers, one verdict.
- ←
Applying quota items to socket solvent-cement jointing of UPVC water and drainage pipes under Beijing DB11/T 2382-2024, and judging the fittings content: take the "(solvent cement)" series, never the fusion series; match indoor / outdoor tables and diameter bands; fittings take no separate installation item; material quantities per the design-shown numbers or the fittings reference tables
UPVC socket solvent-cement jointing takes the "(solvent cement)" series items (indoor water supply table C.10.15-1, indoor drainage table C.10.17-1, outdoor water supply table C.10.4-2, outdoor drainage table C.10.5-2) and must not take the "fusion connection" series; the pipe items' work content already includes fitting installation, fittings take no separate installation item, and fitting material quantities are computed per the design-shown numbers or per the fittings reference tables 6.10.32 (indoor) / 6.10.23 (outdoor); pipe quantities are computed by length on the design-shown pipe centreline, without deducting the lengths fittings occupy.
- ←
Deciding the quota pricing attribution of substrate treatment in plastering works (spatterdash / bonding agent): contained in the plastering item, or taken as a separate item
Substrate treatment (bonding-agent application, spatterdash / cement-splash roughening) is listed separately from the plaster finish in current mainstream quotas. Decide by "three checks": (1) check whether the plastering item's work content already lists interface treatment (if listed, no separate charge); (2) check whether the quota carries a dedicated bonding-agent / substrate-treatment item (if so, apply it separately on the treated area in m2); (3) check whether the item's material column already contains the bonding agent (if contained, no separate charge). Beijing DB11/T 2382-2024 states expressly: general plastering sets items separately for substrate treatment, base coat and finish coat; the substrate treatment of decorative plastering and of tile and stone finishes follows the general plastering items, the finish being listed separately. Railway TB/T 10831-2024 Volume 10 general plastering work content excludes interface treatment, and bonding-agent details carry dedicated items (FY-1375 wall bonding agent, FY-1376 neat cement mortar bonding agent) applied when occurring. Note the double meaning of "spatterdash": railway FY-1370 / FY-1371 "decorative plastering spatterdash" contain red-earth powder and are finish-coat practices; substrate spatterdash / cement splash must take neat-cement-mortar bonding-agent items - never confuse the two.
- ←
Railway 2024 quotas: station-yard volume machinery travel-track laying (ZY-112/113) vs the track volume's laying quotas (GY series) — differences and measurement calibers
Laying travel tracks for freight-yard handling machinery uses Chapter 5 "machinery travel-track laying" of TB/T 10834-2024 Volume 13: ZY-112 (50 kg/m) and ZY-113 (60 kg/m), unit 100 m, base prices 49,511.72 / 57,313.30 yuan, all rail materials included; laying railway track uses Chapter 1 of TB/T 10825-2024 Volume 4, items such as GY-100~105, unit km, quotas excluding rail materials — pair with material quotas. In the estimate summary per TB 10801-2024 Appendix A, "handling machinery foundations and travel tracks" counts in single-track km (1 single-track km = 10 x the 100 m quota unit).
- ←
Unitized curtain-wall quota compilation logic: framing included in factory-finished panels — why installation items contain no profiles — and application and price-adjustment points
Unitized curtain-wall quotas are compiled as "factory-finished panels + site installation": the framing is fitted into the panels at the factory, so the installation item's material list contains only connectors/sealant/glass etc. — the absence of profiles is normal, the framing cost being included in the finished-panel price or in a separately listed "panel fabrication" item; whether the glass is included in the finished price must be checked against the item's material list (if listed separately, its price difference can be adjusted). In application, sheet-curtain-wall framing items must not be applied again (duplicate pricing); channel embeds are listed by piece and T-bolts by set, and panel transport is mostly priced by mutual agreement.
- ←
Quota item selection for trenchless horizontal directional drilling (directional drilling / pipe pulling): process split, diameter banding, measurement rules and multi-pipe single-bore diameter determination
Trenchless directional drilling corresponds to "horizontal directional drilling": there is no all-in item; the three processes - pilot boring, reaming and pipe pull-back - are set as separate items and banded separately (Beijing DB11/T 2382-2024 items D4-11-152 to D4-11-166: pilot boring in three bands, reaming and pipe pull-back in six bands each). Measurement: pilot boring and reaming by the horizontal length between the two working pits; pipe pull-back by the pilot-bore length plus 1.5m. Where several pipes are pulled into one bore, the bore, reaming and pull-back diameters are determined by the smallest circumscribed circle of the pipe bundle. "Within" includes the stated figure; "beyond" excludes it.