Engineering Knowledge Cards.
Confidence HighUpdated 2026-10-01

Pricing the core filling of hollow blocks (core-column concrete): never merged into the block-wall items - apply the cast-in-place concrete column "core column" item, quantities on hole section area times design-shown height

Block-wall items cover only "mixing mortar, cutting, laying and the like" - core filling is outside; apply the "core column" item among the cast-in-place concrete columns (Beijing DB11/T 2382-2024 A-5-13; 2021 edition 5-13), unit m3; quantities on the hole cross-section area times the design-shown height by volume. Plain and reinforced core columns take the same item; the bars, ties and inserts within them execute under the concrete and reinforced concrete rules. Regions differ (Shaanxi, e.g., already counts the core mortar of vertically laid blocks at opening jambs inside the walling mortar) - apply per the local quota notes.

Applicable Codes

  • DB11/T 2382-2024 建设工程施工消耗量标准(第 4.5.2、4.6.1、4.6.5、4.6.6 条,A.4.2 砌块砌体,现浇混凝土柱芯柱子目 A-5-13)
  • DBJ/T 15-18-2021 混凝土砌块墙体工程技术规程(第 2.0.9 条 芯柱定义)
  • GB 50924-2014 砌体结构工程施工规范(第 7.3.3 条)
  • JC 861 混凝土砌块(砖)砌体用灌孔混凝土
  • 陕西新编消耗量定额(砌筑工程册说明,砌块砌体子目编制口径)

Topic Positioning

How core columns formed by concreting the vertical cells of hollow-block walls laid on-line (core filling) route, which item applies, how the quantities compute, and how to read cross-region differences.

Core Conclusions

1. Core concrete sits outside the block-wall items - list separately Beijing DB11/T 2382-2024, A.4.2 block masonry: work content only "mix mortar, cut, lay etc.". Take A-4-8 "hollow concrete block, foundation" (m3): all-in labour Grade I 0.9890 workday, small hollow blocks 0.9300 m3, ordinary dry mortar 0.0780 m3, other materials 1.5%, 200 L mortar mixer 0.0125 machine-shift, other plant 2.0% - no concrete entry: core filling is not comprehended. Clause 4.5.2 adds: "walling consumption shall not include wall ties, embedded parts or concrete blinding; these execute under clauses 4.6.1 to 4.6.9."

2. Apply the "core column" item among cast-in-place columns Beijing 2024 columns itemise rectangular / constructional / shaped / core columns, the core-column item being A-5-13 (m3); the 2021 edition code 5-13 "rectangular column, core column" (m3). Compiled on ready-mixed C30 (with 0.015 m3/m3 of matching neat cement mortar minus stone, etc.) - convert for other types or grades.

3. Definition and scope of core columns DBJ/T 15-18-2021 (technical regulation for concrete block walls) clause 2.0.9: "core column: a concrete column formed by concreting the vertical cells of hollow-block walls laid on-line; without bars, a plain concrete core column; with bars, a reinforced concrete core column." Both take the core-column item; the bars, ties and inserts within execute under 4.6.5, 4.6.9 and the like - never merged into the block wall.

4. Measurement DB11/T 2382-2024 clause 4.6.6 item 3 sub 5): "core columns compute by volume on the hole cross-section area times the design-shown height." Item 1 of the clause: "cast-in-place concrete, unless otherwise provided, computes by volume at design-shown dimensions, deducting no rebar, embedded parts, bolts or single holes of 0.30 m2 or less."

5. Core concrete materials GB 50924-2014 (code for construction of masonry structures) clause 7.3.3: "core-column concrete preferably uses grout concrete per JC 861 (grout concrete for concrete block and brick masonry)." The special concrete runs higher slump, pours easily and densifies with light vibration. The item compiles on ready-mixed concrete - convert the material where the special grout is used.

6. Cross-region differences (key)

  • Some regions comprehend core filling in the block items: Shaanxi's new quota notes for fired hollow-block walls that "the mortar content already includes the core mortar of vertically laid blocks at opening jambs" - not charged again; lightweight-aggregate small hollow block items likewise include like solid-block inlays at openings.
  • Some regions set no dedicated "core column" item - apply the cast-in-place column or constructional-column items.
  • The Beijing basis does not travel: check the local quota notes for item codes, work content and whether core filling is included.

Applicability Boundaries

  • Findings rest on Beijing DB11/T 2382-2024 (and the 2021 edition); other provinces' core / grout clauses follow their own notes - never transplant Beijing codes.
  • Applies to core columns formed in block cells; other vertical concrete members (constructional columns, freestanding columns) take their own items.
  • Bars, ties and inserts never merge into the core-column item - list the rebar / insert items against omissions; never double-charge core filling inside the block-wall items.
  • Measure on design-shown dimensions; the hole section counts only the cells actually filled, never unfilled cells.

Further Reading

  • DB11/T 2382-2024, clauses 4.5.2, 4.6.1, 4.6.5, 4.6.6; Annex A A.4.2 block masonry; core-column item A-5-13.
  • DBJ/T 15-18-2021, clause 2.0.9 (core-column definition).
  • GB 50924-2014, clause 7.3.3, with JC 861 (grout concrete).
  • Local notes: Shaanxi's new consumption quota masonry volume notes, and the project location's current quota masonry and concrete volume notes.

Keywords