pricing by applying quota line items
Concept Guide
Concept
In the Chinese quota-based pricing system, pricing by applying quota line items is the central priced act when preparing the maximum price set for tendering, when bidding, or when reviewing a settlement. The estimator matches the described characteristics of a work section against the quota manuals, locates the corresponding quota line item, and applies its base price — labour cost plus material cost plus machine cost — either directly or after conversion. Quota line items rest on consumption quota (resource norm) standards issued by government or industry authorities and are used together with regional unit price tables. GB 50500-2013 and its successor GB/T 50500-2024 set out the bills-of-quantities valuation rules; the role of the quota norms is narrowing — under the 2013 regime they were the basis for preparing the tender price ceiling and for settlement review, but from the 2020 reform circular (建办标〔2020〕38号) and GB/T 50500-2024 (in force 1 September 2025) ceiling preparation shifts to comparable-project data and market price information, with quotas remaining a reference in settlement review and cost expert assessment during the transition.
Three situations arise. First, direct application: the work characteristics match the quota line item exactly and its base price is adopted as it stands. Second, conversion of quota items to suit conditions: the design conditions differ from the quota assumptions — for example a different mortar or concrete strength grade or mix — so material and machine consumption and unit prices are adjusted under the prescribed conversion rules before application. Third, work items not covered by the quota manuals: the estimator may borrow a neighbouring quota line item, prepare supplementary quota items (a one-off supplementary unit price schedule that does not change the quota system), or build up a price from market enquiries.
Institutionally, the quota supplies a uniform consumption yardstick and pricing benchmark, so that tendering, bidding and settlement produce comparable prices and fewer valuation disputes. The decision-makers are government, industry authorities and cost management institutions, and the pricing basis carries the character of an administrative normative document.
FIDIC Mapping
Aligned terms: 定额 = quota norms (prescribed resource consumption standards); 定额子目 = quota line item; 定额套用 = pricing by applying quota line items; 综合单价 = all-in unit rate; 定额换算 = conversion of quota items to suit conditions; 定额缺项 = work items not covered by the quota manuals; 补充定额 = supplementary quota items.
Relation: absent. The FIDIC Red Book and Yellow Book (2017) contain no equivalent pricing infrastructure — no state-issued resource consumption standard to be applied line item by line item. Under FIDIC the unit rates in the Bill of Quantities are formed competitively by the tenderer and reflect its own construction methods, resource procurement and risk assessment. Pricing by applying quota line items therefore has no nominal counterpart; only a functional analogy exists.
The mapping value lies in comparing two routes. The Chinese route for missing items: no quota line item exists, so a neighbouring item is borrowed, a supplementary item is prepared, or the price is built up from market enquiries. The FIDIC route: new work outside the Contract Price is priced by agreeing or determining new rates or prices; each new rate or price should be derived from relevant rates or prices specified in the Bill of Quantities or other Schedule, with reasonable adjustments for the applicable matters, and where no specified rates are relevant, from the reasonable Cost of executing the work plus the percentage for profit stated in the Contract Data. Variations and adjustments are instructed under Clause 13 [Variations and Adjustments], and the agreement or determination process is subject to the time limits of Sub-Clause 3.7.3.
Usage caution: a literal rendering of the Chinese term should not be presented as internationally standard usage. In international contracts the functional counterpart is change valuation through the agreement or determination of new rates, grounded in competitive pricing and the Engineer's discretion rather than in administrative quota references. Where the parties do adopt quota-based pricing in a contract, the edition of the quota and the accompanying unit price tables should be named expressly.
| Chinese Term | English Term | FIDIC Term | Relation | Notes |
|---|---|---|---|---|
| 定额套用 | pricing by applying quota line items | agreement or determination of new rates or prices | absent | 中国侧由造价人员依定额手册按子目套价,缺项时借用相邻定额或编补充定额;FIDIC 无此计价基础设施,合同价外新增工作只能由工程师与承包商商定或由工程师确定新费率或价格,并受 Sub-Clause 3.7.3 时限约束。 |
| 综合单价 | all-in unit rate | rate or price specified in the Bill of Quantities | adjacent | 两者在构成上相似(均含人工、材料、机械与相应费用及利润),但定价基础不同:FIDIC 清单费率由投标人竞争形成,反映其自身施工组织与风险判断;中国综合单价以政府发布的定额消耗量为组价依据。 |
| 定额换算 | conversion of quota items to suit conditions | reasonable adjustments to relevant rates or prices | adjacent | 定额换算是在行政性消耗量标准内部按既定规则机械重算材料、机械消耗量与单价;FIDIC 的调整是就变更事项对工程量清单既有费率作商业性合理调整,决策主体、依据与程序均不相同。 |
Updated 2026-09-13
- 01
Classifying and measuring slope treatment works by protection type: plant protection by slope area, masonry protection by masonry volume, anchoring and facing listed apart (anchor length / mass + facing area), SNS flexible nets by laid area with anchors and posts separate
Slope treatment pricing first fixes the sector system (railway / highway…
TB/T 10822-2024 铁路工程预算定额 Vol. 1 路基工程 Ch. 4 平(坡)面防护TB/T 10822-2024 Vol. 1 Ch. 5 护坡及冲刷防护TB/T 10822-2024 Vol. 1 册说明 第二部分 Ch. 4、Ch. 5分章说明2026-10-20 - 02
Pricing and member-wise itemisation of stone balustrades (granite balustrades): the basis test, the post / panel / sill items and their measurement rules
Stone balustrades route by works basis first: landscape / scenic and ant…
DB11/T 2382-2024 建设工程施工消耗量标准GB/T 50855-2024 仿古建筑工程工程量计算标准GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准2026-10-16 - 03
Measuring and pricing the hand-laminated joints of GRP pipes and ducts (resin-impregnated lay-up joints, resin filling and joint reinforcement): the lamination sits inside the pipe / fitting / duct installation items' work content, not itemised separately; only where the joint form exceeds the quota range does it count separately per joint or per developed lamination area
The hand-laminated joint of GRP pipes and ducts is no independent quota…
DB11/T 2382-2024 建设工程施工消耗量标准 第6.8.15、6.8.16、6.8.17、6.8.18、6.8.19、6.8.21、6.8.23条DB11/T 2382-2024 App. C 通用安装工程 续Table C.8.12-1、续Table C.8.12-2、Table C.8.35-2、Table C.7.24GB/T 50856-2024 通用安装工程工程量计算标准 App. G Table G.2.1、App. M Table M.3.12026-10-15 - 04
Measuring and pricing drainage (discharge) pipes: fixing the measurement basis and quota items by scenario - roofs, urban rail transit, municipal bridges and culverts, railway bridge decks
Drainage pipe measurement splits by scenario: pipe bodies (downpipes / d…
DB11/T 2382-2024 · Standard for Construction Consumption of Construction Works (Beijing) 第4.10节 屋面及防水工程(4.10.19~4.10.28)DB11/T 2382-2024 · Standard for Construction Consumption of Construction Works (Beijing) 第10.1节 城市轨道交通工程·土建工程 Ⅷ 防水工程(10.1.88~10.1.93)DB11/T 2382-2024 App. A 房屋建筑与装饰工程 A.9 屋面及防水工程(A-9-97、A-9-101)2026-10-14 - 05
Pricing the core filling of hollow blocks (core-column concrete): never merged into the block-wall items - apply the cast-in-place concrete column "core column" item, quantities on hole section area times design-shown height
Block-wall items cover only "mixing mortar, cutting, laying and the like…
DB11/T 2382-2024 建设工程施工消耗量标准(第 4.5.2、4.6.1、4.6.5、4.6.6 条,A.4.2 砌块砌体,现浇混凝土柱芯柱子目 A-5-13)DBJ/T 15-18-2021 混凝土砌块墙体工程技术规程(第 2.0.9 条 芯柱定义)GB 50924-2014 砌体结构工程施工规范(第 7.3.3 条)2026-10-01 - 06
Beijing DB11/T 2382-2024 consumption standard: quota-application method for water-tank (assembled / integral) installation - capacity banding, measurement per unit, and the treatment of accessories and peripheral works
Water-tank installation quantities shall be classified by total tank cap…
DB11/T 2382-2024 · Standard for Construction Consumption of Construction Works (Beijing) 通用安装工程 6.10 给排水、采暖、燃气工程(6.10.81~6.10.89、6.10.39~6.10.46)表 C.10.72-1 整体水箱安装表 C.10.72-2 组装水箱安装2026-09-29 - 07
Parapet inner-face plastering: interior or exterior wall items? Attribution method, regional norm precedents, and pricing points
At BOQ level (GB/T 50854-2024) there is no interior/exterior split — att…
GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准 App. MDB11/T 2382-2024 建设工程施工消耗量标准 第4.13节陕西省2024消耗量定额(征求意见稿)第十二章 墙、柱面装饰与隔断、幕墙工程2026-09-29 - 08
Pricing pavement removal: selection criteria between milling and demolition sub-items, with corresponding Beijing DB11/T 2382-2024 Appendix D municipal sub-items and consumptions
Pavement removal is not a binary choice but split by construction essenc…
DB11/T 2382-2024 北京市《建设工程施工消耗量标准》App. D 市政工程(拆除工程)DB11/T 2382-2024 正文 8.6 拆除工程2026-09-29 - 09
Pricing rules for fan-coil-unit installation: the installation sub-item measured per "unit" by installation type, the unit body listed separately as an unpriced main material, and supports distinguished between supplied with the equipment (included) and fabricated on site (applying equipment-support fabrication and installation banded by each support's weight) - per Beijing DB11/T 2382-2024 Section 6.7, with a railway TB/T 10831-2024 quota comparison
FCU pricing splits into three blocks: (1) installation applies the corre…
DB11/T 2382-2024 建设工程施工消耗量标准 第6.7节 通风空调安装工程TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程 Ch. 3第三节 通风及空调工程2026-09-29 - 10
Deciding quota pricing of combustible gas alarms across systems: the split between the industrial-instrument "safety monitoring device" (per set) and the fire "point-type detector" (per unit), the code basis and the unit difference
Pricing a combustible gas alarm is not "either-or, take the dearer" but…
GB 50116-2013 · Code for Design of Automatic Fire Alarm System 第 8.1.1、8.1.2 条GB/T 50856-2024 · Standard for measurement of general mechanical, electrical, plumbing and fire services App. J Table J.4.1(030904)、App. K Table K.6.1 及App. K.2(031006)DB11/T 2382-2024 · Standard for Construction Consumption of Construction Works (Beijing) 第 6.6.30~6.6.34、6.9.42~6.9.49 条及Table C.6.21、Table G.6.132026-09-28 - 11
Bill listing and quota application for installing water-treatment plant (plate-and-frame sludge dewatering machines / filter presses): the dividing line between general building services GB/T 50856 and municipal GB/T 50857, and the corresponding items of local municipal consumption standards
Plate-and-frame filter presses (plate-and-frame sludge dewatering machin…
GB/T 50856-2024 App. C C.9.7GB/T 50856-2024 第3.0.6条GB/T 50857-2024 App. F F.2.12026-09-28 - 12
BOQ and quota item selection for compact package unit substations (prefabricated substations): the mainstream principle of billing the complete unit per set; splitting into transformer plus HV/LV panels only for non-package supply, missing quota bands or contract-required splits; with commissioning and handover-test interfaces and a Beijing / Shenzhen / railway / national-standard comparison
For package unit substations (compact / prefabricated substations) the p…
DB11/T 2382-2024 · Standard for Construction Consumption of Construction Works (Beijing) 第6.4.19条、App. CTable C.4.10(子目C4-2-21等)SJG 181.7-2024 · Consumption Standard for Municipal Works (Volume 7: Power Ducts, Communication Conduits and Lighting Works) (Shenzhen) 2.1.7、2.2.2TB/T 10829-2024 · Budget Quota of Railway Engineering (Volume 8: Power Works) DY-1074~DY-1084、DY-1407~DY-14102026-09-25 - 13
Distinguishing and applying tile (block) finishes vs stone finishes: separate BOQ items and three quota criteria (material -> size -> workmanship)
"Block finish" carries two senses — a collective chapter name (all slab…
GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准(App. L Table L.2.1、App. M Table M.3.1)TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程(Ch. 2 装饰装修工程)DB11/T 2382-2024 建设工程施工消耗量标准(App. A A.11.2 块料面层)2026-09-25 - 14
Applying static equipment and process metal structure fabrication/installation quotas: process-item determination of site-built tank shells and metal-weight measurement rules
Tank shells fabricated on site from delivered steel plate/section stock…
DB11/T 2382-2024 建设工程施工消耗量标准 第6.3章 静置设备与工艺金属结构制作安装工程江西省通用安装工程消耗量定额 第五册2026-09-25 - 15
Audit of pricing by applying quota line items: identifying over-application, misapplication, and duplicate application via the three-way comparison
Identify problems of pricing by applying quota line items using the "thr…
GB/T 51095-2015 建设工程造价咨询规范DL/T 5468-2013 输变电工程施工图预算编制导则DBJ51/T 048-2015 四川省建设工程造价电子数据标准2026-09-25 - 16
Handling path for missing quota items: similar-process application -> compilation from similar-project data -> compilation from technical conditions -> approval/filing (including power and railway industry differences)
Missing quota items are handled in step-down order: (1) preferentially r…
DL/T 5468-2013DL/T 5469-2013DL/T 5464-20132026-09-25 - 17
TB/T 10825-2024 track quota: CWR track laying and rail-material transport compiled at "rail length <=500 m" — laying longer rail strings (unit sections) applies directly, no conversion, no extra booking
Under the railway 2024 quotas (TB/T 10825-2024 Volume 4 track works), lo…
TB/T 10825-2024 铁路工程预算定额 Vol. 4 轨道工程 Ch. 1铺轨 册说明及第二节无缝线路TB 10015-2012 铁路无缝线路设计规范 第4.5节 长轨条布置TB 10811-2024 铁路基本建设工程设计概(预)算费用定额 第2.4节 价外运杂费2026-09-25 - 18
Overview of engineering budget preparation and review: the seven-step preparation workflow and the three-layer review framework
The construction-drawing based budget (pre-tender estimate) is a pre-con…
GB/T 51095-2015 建设工程造价咨询规范GB/T 50875-2013 工程造价术语标准DB42/T 823-2021 建设工程造价咨询质量控制规范2026-09-25 - 19
Scenario split for applying quota line items to PE-ERT pipes under Beijing DB11/T 2382-2024: assignment between floor radiant heating pipes (C10-7-41 to 43) and plastic water supply pipes (C10-2 / C10-1 series), with a comparison against PP-R and PE-X
Under Beijing DB11/T 2382-2024, PE-ERT pipes are priced by use scenario…
DB11/T 2382-2024 · Standard for Construction Consumption of Construction Works (Beijing) App. C 通用安装工程(Table C.10.15-2、Table C.10.15-3、Table C.10.4-1、C10-7-41~43)2026-09-25 - 20
Beijing DB11/T 2382-2024 general building services installation: quota item selection for cabinet (box-type) centrifugal fans - Table C.7.8-7 fan box items, discernment between the box-type and machinery-volume centrifugal fan scopes, and the treatment of supports, hangers and bottom bedding
Cabinet (box-type) centrifugal fan installation is priced under Table C…
DB11/T 2382-2024 · Standard for Construction Consumption of Construction Works (Beijing) (北京)通用安装工程 第6.1节、第6.7节及App. C2026-09-25 - 21
Whether one work content can apply multiple quota items: multi-sub-item rate build-up for BOQ items is allowed; duplicate application for the same process is prohibited
Determined in two layers: (1) one BOQ item applying multiple quota sub-i…
GB 50860-2013 构筑物工程工程量计算规范GB/T 50860-2024 构筑物工程工程量计算标准GB/T 50857-2024 市政工程工程量计算标准2026-09-25 - 22
Attributing an excessive audit reduction rate to the preparation side: classifying reduction sources to trace preparation deficiencies, with dialectical analysis
An excessive reduction rate usually reflects systematic preparation-side…
GB/T 51095-2015 建设工程造价咨询规范T/ZBD 100.5-2023 建设工程结算审核作业指引关于审查建设工程预算管理暂行办法2026-09-25 - 23
TB/T 10822-2024 subgrade earthworks: excavator self-dig-self-dump vs excavator loading + dump-truck haul — haul-distance boundaries (20 m / 1 km / 10 km x 0.85)
One criterion: does the excavated soil enter the truck-haulage stage? So…
TB/T 10822-2024 · Budget Quota of Railway Engineering (Volume 1: Subgrade Works) Ch. 1 路基土石方(分章说明第(一)~(三)条;第一节 土方挖运 LY-1~3、LY-4~15、LY-20~25)2026-09-25 - 24
Whether curing is priced separately when applying quotas to cement-concrete pavement: Beijing DB11/T 2382-2024, Shenzhen SJG 181.1-2024, and the highway quota all include curing
Cement-concrete pavement is priced by the surface-course sub-item; curin…
DB11/T 2382-2024 建设工程施工消耗量标准(北京)第7.2节道路工程、App. D子目D2-2-20SJG 181.1-2024 市政工程消耗量标准 Vol. 1 道路工程JTG/T 3832-2018 公路工程预算定额(北京市普通公路大中修工程预算定额)子目2-3-8水泥混凝土路面2026-09-25 - 25
Unitized curtain-wall quota compilation logic: framing included in factory-finished panels — why installation items contain no profiles — and application and price-adjustment points
Unitized curtain-wall quotas are compiled as "factory-finished panels +…
DB34/T 3752-2020 既有建筑幕墙安全性鉴定技术规程DB11/T 2382-2024 建设工程施工消耗量标准(北京)湖南2025 房屋建筑与装饰工程消耗量标准2026-09-25