Measuring and pricing the hand-laminated joints of GRP pipes and ducts (resin-impregnated lay-up joints, resin filling and joint reinforcement): the lamination sits inside the pipe / fitting / duct installation items' work content, not itemised separately; only where the joint form exceeds the quota range does it count separately per joint or per developed lamination area

The hand-laminated joint of GRP pipes and ducts is no independent quota item: its resin filling, glass-cloth reinforcement and glue-smeared insertion are written into the work content of the pipe (fitting) / duct installation items, so pricing follows pipe length (m, unit 10 m, on the drawn centre line without deducting fittings and valves), fitting count (pieces, unit 10) or duct developed area (m2, unit 10 m2), not per joint; only where the designed joint form exceeds the quota's scope (site butt joints with double-sided lamination, hand-laminated joints of finished ducts on site) does it count separately per joint or per developed lamination area, applying hand-laminated GRP items (GB/T 50856-2024 Appendix M Table M.3.1, code 031203) or a supplementary quota compiled on quota principles and approved.

Applicable Codes

  • DB11/T 2382-2024 建设工程施工消耗量标准 第6.8.15、6.8.16、6.8.17、6.8.18、6.8.19、6.8.21、6.8.23条
  • DB11/T 2382-2024 App. C 通用安装工程 续Table C.8.12-1、续Table C.8.12-2、Table C.8.35-2、Table C.7.24
  • GB/T 50856-2024 通用安装工程工程量计算标准 App. G Table G.2.1、App. M Table M.3.1
  • TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程 FY-2704~FY-2711
  • GB 50051-2013 烟囱设计规范 第9.4.4条
  • GB 51352-2019 纤维增强塑料排烟筒工程技术标准 第7.3.5条

Scope of the question

The measurement basis and quota test for hand-laminated joints (resin-impregnated lay-up, resin filling, joint reinforcement, glued insertion) in GRP pipe and duct installation - whether joints itemise separately, in what units, and how to charge beyond the quota's scope.

Core conclusions

1. Laminated joints are not independent items - included in the installation items' work content

  • Beijing DB11/T 2382-2024 Section 6.8 industrial piping: low-pressure GRP pipe (flanged / bell-and-spigot) items C8-1-332 to 345, unit 10 m, work content including preparation, pipe cutting, beveling, joint set-up, resin filling and joint reinforcement, installation, strength testing; low-pressure GRP fittings (spigot) items C8-4-346 to 366, unit 10 pieces, including resin-filled connection and joint reinforcement.
  • GRP (insulated) duct installation items (Beijing Tables C.7.22 / C.7.23 flanged, C.7.24 spigot-inserted, e.g. C7-3-12), unit m2, work content: assembly and positioning, aligning and levelling, gluing, insertion, leakage testing (flanges connecting ducts to valves are excluded, applied via the equipment-support items up to 20 kg x 1.4). So the resin filling, cloth reinforcement and glued insertion of laminated joints are all listed work content of the installation items - by the principle of no charge for the unlisted-as-separate and no splitting of operations, no separate joint item exists.

2. Measurement rules (source texts)

  • Pipes (DB11/T 2382-2024 Article 6.8.18): pipe installation by drawn centre-line length, undeducted for fittings and valves, bends to the centre-line intersections; buried outdoor pipes undeducted for structures.
  • Square compensators (6.8.19): included in pipe installation by their occupied length.
  • Medium-pressure pipes and compensators per 6.8.18-6.8.19 (6.8.21); high-pressure per 6.8.18 (6.8.23).
  • Fittings: per drawn count (unit 10).
  • Ducts (GB/T 50856-2024 Appendix G Table G.2.1, 030702, note 1): developed area without deducting inspection and measuring holes and outlets; length on the drawn centre line (mains and branches divided at intersections), including elbows, tees, reducers and transitions, excluding components; developed area excludes overlapping duct and mouth parts; tapers on mean diameter or perimeter. The joint lamination dosage is already spread into the per-length / per-area contents - never per joint.

3. Per-item contents back-calculating the lamination dose (evidence of scale)

  • Spigot pipe DN400 (C8-1-343): per 10 m - epoxy resin 6.450 kg, glass cloth 16.299 m2.
  • Spigot pipe DN150 (C8-1-338): per 10 m - epoxy 1.475 kg, cloth 6.113 m2.
  • Flanged pipe DN40 (C8-1-332): per 10 m - epoxy 0.200 kg, cloth 1.631 m2 - flanged joints take light reinforcement, far less lamination than spigot.
  • Spigot fitting DN40 (C8-4-347): per 10 - epoxy 4.532 kg, cloth 12.906 m2.

4. When joints charge separately Only where the designed joint form exceeds the installation item's scope: per joint count or per developed lamination area (m2), applying hand-laminated GRP items (GB/T 50856-2024 Appendix M Table M.3.1, code 031203) or a supplementary quota compiled on budget-quota principles and approved by the quota authority.

5. Code basis of joint build-ups

  • GB 50051-2013 Article 9.4.4 (GRP chimney joints): preferably butt joints, the inner and outer bonded widths at full thickness not under 400 mm per Article 9.3.6; under 4 m diameter, spigot joints with socket depth not under 100 mm and lamination widths not under 400 mm; seams laminated with chopped-strand mat and roving cloth alternately, first and last layers mat.
  • GB 51352-2019 Article 7.3.5 (hand lay-up butt-joint craft): 1 resin as the chimney; 2 reinforcements of surface veil, chopped mat and roving cloth; 3 butt seams filled with resin-impregnated fibre; 4 sections located with jigs or equivalents.
  • Related specials: jacketed pipes computed per inner and outer pipe with outer-pipe items x 1.50 labour and 1.20 materials-plant (DB11/T 2382-2024 6.8.15); low-pressure spiral-rolled pipes per low-pressure plate-rolled items (6.8.16); field insulation at pre-insulated pipe joints per the painting, anti-corrosion and insulation items (6.8.17).

Applicability limits

  • No separate joint item presumes the designed form (spigot-bonded / flanged / inserted) is covered by the chosen item's work content; forms beyond the quota charge separately.
  • Units never mix: pipes 10 m, fittings 10 pieces, ducts m2 (Beijing) / 10 m2 (railway FY-2704-2711).
  • Bases follow the executed standard: DB11/T 2382-2024 is Beijing local; TB/T 10831-2024 is railway - convert per the local / industry standard when crossing.
  • Pipes not deducting fittings and valves is a length rule only; industrial-pipe fittings, flanges and valves still itemise per piece (GB/T 50856-2024 Appendix H). This card concerns joints only and does not change fitting itemisation.
  • Separately charged joints need design basis or variation certification, avoiding double counting against the installation items.

Further reading

  • DB11/T 2382-2024 Section 6.8 items II / III / IV (low / medium / high pressure), Articles 6.8.14-6.8.23.
  • DB11/T 2382-2024 Appendix C: Tables C.8.12-1 / C.8.12-2, C.8.35-2, C.7.24.
  • GB/T 50856-2024 Appendix G Table G.2.1 (030702) notes; Appendix M Table M.3.1 (031203).
  • TB/T 10831-2024 Volume 10 Chapter 3 Section 3 item 4, FY-2704 to FY-2711 (10 m2, round d up to 200 / 500 / 1120 / over, rectangular perimeter up to 800 / 2000 / 4000 / over).
  • GB 50051-2013 Article 9.4.4; GB 51352-2019 Article 7.3.5.