Ventilation duct quantity calculation and classified measurement: whether supply / exhaust / fresh-air ducts are computed separately, the developed (unfolded) area rules, BOQ listing, and quota-norm tiering basis

Ducts are computed from design dimensions as developed (unfolded) area (m2): no deduction is made for inspection ports, measuring ports, supply openings or suction openings; length is taken along the design centreline (main and branch ducts divided at their centreline intersections), including the length of elbows, tees, reducers and rectangular-to-round adapters, but excluding the length occupied by components. Supply, exhaust and fresh-air systems are governed by one and the same rule set — there are no per-system differences in the calculation method; "separation" is expressed at the BOQ listing and rate build-up levels — listed by item description (use/name, material, shape, size, plate thickness, joint form), and split when quota line items are applied according to tiering factors such as joint form and size; the system itself is not a tiering factor.

Applicable Codes

  • GB/T 50856-2024 通用安装工程工程量计算标准 App. G(Table G.2.1 code 030702;Table G.4.1 code 030704)
  • GB 50243-2016 通风与空调工程施工质量验收规范 第4.1.4条及Table 4.1.4
  • DB11/T 2382-2024 建设工程施工消耗量标准 第6.7节(通风空调安装工程)

Topic Positioning

Answering the measurement question "must fresh-air, supply and exhaust ducts be computed separately": the unified developed-area and length basis (GB/T 50856-2024 Standard for Measurement of Quantities of General Installation Works, Appendix G), the boundary of "separation" at the BOQ level and the quota-norm level, together with the corresponding clauses and coefficients of the Beijing DB11/T 2382-2024 consumption norms.

Core Conclusions

1. Unified measurement rules (GB/T 50856-2024 Table G.2.1, ventilation duct fabrication and installation, code 030702, notes of that table):

  1. Developed area of ducts, with no deduction for the area occupied by inspection ports, measuring ports, supply openings and suction openings; duct length is taken along the design centreline length (main and branch ducts divided at their centreline intersections), including the length of fittings such as elbows, tees, reducers and rectangular-to-round adapters, but excluding the length occupied by components. The developed area of ducts excludes overlapping duct and mouth areas. Tapered ducts: circular ducts by mean diameter; rectangular ducts by mean perimeter.
  2. Wall-penetration sleeves are computed by developed area and included in the corresponding duct quantities according to material and thickness requirements.
  3. Where the shaped steel used for clean ventilation ducts is required to be galvanized, this shall be stated in the work content.
  4. Factory-made ducts are listed under the corresponding ventilation duct item codes.
  5. Stainless-steel smoke-exhaust ducts shall be listed under the corresponding stainless-steel-sheet ventilation duct codes.
  6. Ventilation duct items include the fabrication and installation of supports and hangers. Where these must be listed separately, the corresponding item codes of Appendix N (other and ancillary works) shall be used.

2. "Separate computation" at three levels:

  • Measurement level: supply, exhaust and fresh-air ducts use the same table (G.2.1) and the same rule set; the calculation formula and the deduction basis are identical — the standard contains no provision for a separate algorithm per system, so separation is not a mandatory requirement of the measurement rules.
  • BOQ level: Table G.2.1 requires listing by item description; in practice ducts are listed by system use (supply duct / exhaust duct / fresh-air duct). GB 50243-2016 Clause 4.1.4: "duct systems shall be classified by working pressure into four classes — micro-pressure, low pressure, medium pressure and high pressure — and ducts of the corresponding class shall be used" — different systems often have different working-pressure classes, and the plate thickness and airtightness characteristics differ accordingly, directly affecting the all-in unit rate and the quota tier; separate listing is therefore preferable.
  • Quota-norm level: Beijing DB11/T 2382-2024 Clause 6.7.25: "fabrication and installation of thin-steel-sheet ventilation ducts and accessories shall be itemized according to influencing factors such as the duct joint form and duct size, in conjunction with the relevant codes" — the tiering factors are expressly joint form, size and the like; the system (supply / exhaust / fresh air) is not among them; ducts of the same material, same joint form and same size tier may be priced with the same group of sub-items (fabrication and installation applied separately); if any dimension differs, the quantities must be split and grouped accordingly.

3. Companion measurement basis of Section 6.7 of Beijing DB11/T 2382-2024:

  • 6.7.29: duct fabrication and installation quantities shall be computed from the design inner dimensions as developed area, without deducting the opening area occupied by inspection ports, measuring ports and supply / return grilles.
  • 6.7.30: duct length shall be taken along the design centreline length of the duct, without deducting the length of elbows, tees, reducers and other reducing fittings, but deducting the length occupied by valves and components; the start and end points of the centreline shall be the intersections of the duct centrelines.
  • 6.7.28: for uniform air supply through tapered ducts, the corresponding duct fabrication and installation items shall be applied by mean diameter or large side, with labour consumption multiplied by 2.50; air-curtain supply ducts shall be applied by the mean large side of the rectangular duct, with labour multiplied by 3.00; for curved ducts, labour and materials shall be multiplied by 1.12.
  • 6.7.27: for galvanized thin-steel-sheet rectangular ducts with common (TDF) flanges, the labour split for fabrication / installation is 40% / 60%; for stainless-steel-sheet ducts, 72% / 28%.
  • 6.7.32: wall-penetration sleeves are computed by developed area and duct end sealing plates by the cross-sectional area of the duct sealed, both applying the corresponding duct fabrication and installation items.
  • 6.7.36: plenum boxes are computed by developed area (distinguishing the large side), without deducting the opening area of the ducts connected to them.
  • 6.7.39 / 6.7.41: the installation quantities of glass-reinforced plastic ducts and composite ducts are computed from the design outer dimensions as developed area (unlike thin-steel-sheet ducts, which use the inner dimension basis).
  • Inspection, commissioning and testing of ventilation works are set up as separate BOQ items under Appendix G Table G.4.1 (code 030704).

Applicable Boundaries

  • Parts 1 and 2 are the nationally applicable basis of GB/T 50856-2024; Part 3 reflects the Beijing local standard (DB11/T 2382-2024); other provinces and municipalities should price according to their current local consumption norms / quota standards, as tiering factors and adjustment coefficients may differ.
  • Note the developed-area basis differs by material: thin-steel-sheet ducts by inner dimensions, glass-reinforced plastic and composite ducts by outer dimensions — do not mix them.
  • "Separate listing" is not a mandatory clause of the standard but a requirement of item-description management and clarity of rate build-up: if the three systems are entirely at the same tier in every characteristic, applying the same group of sub-items in a merged item is not a breach either, but separate listing is more convenient for the final account, quantity reconciliation and variation management.
  • This card covers only measurement and tiering logic and contains no specific unit prices or fee data for any region; when pricing, apply the local quota notes and the norms for on-costs and expenses.

Further Reading

  • GB/T 50856-2024 Standard for Measurement of Quantities of General Installation Works, Appendix G: Table G.2.1 (ventilation duct fabrication and installation, code 030702) and notes 1-6 of that table; Table G.4.1 (inspection, commissioning and testing of ventilation works, code 030704).
  • GB 50243-2016 Code for Construction Quality Acceptance of Ventilation and Air Conditioning Works, Clause 4.1.4 and Table 4.1.4 (duct classes divided into four working-pressure categories).
  • DB11/T 2382-2024 Standard of Consumption Norms for Construction Works, Section 6.7 (ventilation and air-conditioning installation works), in particular Clauses 6.7.25-6.7.41 — measurement rules for duct fabrication and installation, labour adjustment coefficients and material tiering.
  • When applying quota items, check them against the local quota manual's thin-steel-sheet duct fabrication and installation sub-item tables, matching dimension by dimension: joint form (seam / welded), size (circular diameter or rectangular large side) and plate thickness.