Distinguishing the measurement units of duct flexible joints (flexible connections / canvas connections) and piping flexible connections (soft joints, metal hose, expansion-joint compensators): the former by developed area in m2, the latter by quantity shown on the drawings per piece / per length
Duct flexible joints (canvas connections, flexible short ducts and duct expansion joints, under ventilation and air-conditioning duct components 030703 flexible connections) are measured on the dimensions shown on the drawings by developed area in m2, not by count; piping flexible connections (soft joints / metal hose, expansion joints i.e. compensators, under water supply, drainage, heating and gas pipe accessories 031002) are measured by the quantity shown on the drawings per piece (soft joints / hose per length), not in m2; whole extensible flexible ducts (030702) are measured separately on centre-line length in m - the three must not be mixed.
Applicable Codes
- GB/T 50856-2024 通用安装工程工程量计算标准(App. G Table G.3.1、App. K Table K.2.1、Table K.1.1)
- SJG 111.3-2022 城市地下综合管廊工程消耗量标准(Vol. 3 附属设施安装工程)第4.2.2条、第4.1.7条
- SJG 181.4-2024 市政工程消耗量标准 Vol. 4 给水排水管网工程
- DB11/T 2382-2024 建设工程施工消耗量标准 App. C C.10.37-2
- TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程
Scope of the question
Distinguishing, under the BOQ and quota bases, the measurement units of duct flexible joints / flexible connections in ventilation and air-conditioning versus piping flexible connections (soft joints, metal hose, expansion joints i.e. compensators) in water supply, drainage, heating and gas: the former by developed area in m2, the latter by the quantity shown on the drawings (per piece / per length); also clarifying the easily confused flexible duct (by m).
Core conclusions
1. Duct flexible joints (canvas connections, flexible short ducts and duct expansion joints) by m2, not by count. GB/T 50856-2024 Appendix G Table G.3.1 duct component fabrication and installation (code 030703), notes item 6: flexible connections include metal and non-metal flexible connections and expansion joints. The canvas / flexible short ducts at fan inlets and outlets and the duct expansion joints all belong to the flexible connections item, measured on the dimensions shown on the drawings by developed area (m2). The quota side agrees: SJG 111.3-2022 Article 4.2.2 paragraph 5 - canvas connection fabrication and installation is measured, on the dimensions shown on the drawings, in square metres on the developed area; TB/T 10831-2024 Volume 10 flexible duct fabrication and installation items FY-2712 and FY-2713 are measured per 10 m2 (work content: cleaning, positioning, canvas duct connection). Main-material conversion: SJG 111.3-2022 Article 4.1.7 paragraph 5 - the canvas connection items assume canvas; where artificial leather is used, convert the main material, other contents unchanged.
2. Duct flexible ducts (whole extensible metal / non-metal flexible ducts) by centre-line length in m - do not confuse with soft joints. SJG 111.3-2022 Article 4.2.2 paragraph 3: flexible duct installation is measured in metres on the centre-line length shown on the drawings. Applicable materials include flexible ducts of metal, plastic-coated synthetic fabric, polyester, polyethylene, PVC film, aluminium foil etc. (Article 4.1.7 paragraph 7). Only the 150-250 mm flexible short piece connecting equipment to duct goes into the m2 flexible connections.
3. Piping flexible connections by count (per piece / per length), not in m2. GB/T 50856-2024 Appendix K water supply, drainage, heating and gas works, Table K.2.1 pipe accessories (code 031002): soft joints (hose) per the quantity shown on the drawings in lengths; compensators (expansion joints, bellows / sleeve compensators) per the quantity shown on the drawings in pieces. Quota corroboration: DB11/T 2382-2024 Appendix C C.10.37-2 soft joint (flanged) item C10-5-143 is measured per piece (banded by nominal diameter), noting that installation of finished hose of any material may apply the soft joint installation item; SJG 181.4-2024: flat-flange expansion sleeves are installed per the quantity shown on the drawings, counted per piece.
4. Pipe body quantities: lengths occupied by expansion joints etc. are not deducted. GB/T 50856-2024 Table K.1.1 notes item 8: pipe quantities do not deduct lengths occupied by valves, pressure reducers, steam traps, water meters, expansion devices and other fittings, nor by chambers of various kinds; square compensators enter the pipe installation quantity with their occupied length, the pipe installation all-in unit rate covering square compensator fabrication and installation. TB/T 10831-2024 Volume 10 volume notes to the same effect: all pipes are measured on the design centre-line length, without deducting lengths occupied by valves and fittings (including pressure reducers, steam traps, water meters, expansion devices etc.).
5. Duct body length is the opposite - component lengths are deducted. SJG 111.3-2022 Article 4.2.2 paragraph 2: thin steel duct lengths are measured on the centre-line length shown on the drawings (main and branch ducts divided at centre-line intersections), including elbows, reducers, square-to-round transitions and other fittings, deducting component lengths; where the design is silent, deduct - butterfly valve L=150 mm; check valve L=300 mm; circular fire damper L=220 mm; rectangular fire damper L=210 mm; airtight opposed-blade control damper L=210 mm; airtight inclined slide damper L=220 mm. Paragraph 1 of the same article: thin steel ducts are measured in square metres on the developed area at the outside diameter shown, without deducting inspection holes, measuring holes, supply and exhaust outlets; overlapping duct and mouth areas are already in the items and not charged again.
Applicability limits
- The first test is the discipline and BOQ attribution, not the name: under ventilation and air-conditioning Appendix G (030703 flexible connections), by developed area in m2; under water supply, drainage, heating and gas Appendix K (031002 pipe accessories), by the quantity shown on the drawings.
- Duct soft joint does not equal flexible duct: the former is the 150-250 mm flexible short piece (connecting equipment to duct), by m2; the latter a whole purchased extensible flexible duct, by centre-line length in m.
- Expansion joint means different things in the two disciplines: on ducts it belongs to 030703 flexible connections (m2); on piping it is the compensator, under 031002 (per piece).
- BOQ and quota quantities run in parallel: this card states the BOQ basis (GB/T 50856-2024); when applying quotas, the item units of the chosen volume govern (most quotas likewise use per piece / per length, consistent with the BOQ).
- The trailing code digits and item descriptions (material, size, connection type, nominal diameter) follow the standard's appendix tables.
Further reading
- GB/T 50856-2024 Measurement Standard for General Installation Works: Appendix G Table G.3.1 (duct component fabrication and installation, code 030703, notes item 6 flexible connections); Appendix K Table K.2.1 (pipe accessories, code 031002) and Table K.1.1 (water supply, drainage, heating and gas piping, code 031001, notes item 8). Effective from 1 September 2025, replacing GB 50856-2013.
- SJG 111.3-2022 Consumption Standard for Urban Utility Tunnel Works (Volume 3 Ancillary Installation Works), Article 4.2.2 (duct measurement rules, including component deductions) and Article 4.1.7 (notes).
- SJG 181.4-2024 Consumption Standard for Municipal Works, Volume 4 Water Supply and Drainage Networks, fittings, valves and accessories installation - flat-flange expansion sleeves counted per piece.
- DB11/T 2382-2024 Construction Consumption Standard, Appendix C general installation works, C.10.37-2 soft joint (flanged).
- TB/T 10831-2024 Railway Works Budget Quota Manual, Volume 10 Buildings, volume notes (quantity rules) and section 2 duct fabrication and installation, item (5) flexible ducts, FY-2712 and FY-2713.
Keywords
- 风管软接头
- 柔性接口
- 帆布接口
- 柔性软风管
- 管道软接头
- 伸缩节
- 补偿器
- 管道附件 031002
- GB/T 50856-2024