The basis for identifying duct sizes (outside diameter / outside side length for metal, inside diameter / inside side length for non-metal) and the rules for taking 'diameter / perimeter' in developed area calculation (circular tapers by mean diameter, rectangular by mean perimeter, seam laps not added), with elevation notation checking points
GB 50243-2016 clause 4.1.3: metal duct sizes are governed by outside diameter or outside side length, and non-metal duct and air shaft sizes by inside diameter or inside side length; circular ducts should preferably follow the basic series, and irregular oval ducts are noted by flat side length and short-axis length. GB/T 50856-2024 Table G.2.1 problem note 1: the developed area deducts no openings of inspection holes, measuring holes, supply outlets or exhaust inlets; the length follows the centrelines shown on the design (bends, tees, reducers and round-to-rectangular transitions included, the length of components excluded); 'for duct tapers, circular ducts are calculated by mean diameter and rectangular ducts by mean perimeter'; and collar overlap areas are not added. Elevation check: rectangular ducts are noted at the duct invert and circular ducts at the duct centreline (GB/T 50114-2010 clause 4.5.5).
Applicable Codes
- GB 50243-2016 通风与空调工程施工质量验收规范 第4.1.3条、Table 4.1.3-1、Table 4.1.3-2
- GB/T 50856-2024 通用安装工程工程量计算标准 App. G Table G.2.1(code 030702)及问题说明第1~6条
- DB11/T 2382-2024 建设工程施工消耗量标准 第6.7.29、6.7.30、6.7.32、6.7.36、6.7.39、6.7.41条
- GB/T 50114-2010 暖通空调制图标准 第4.5.5条
- SJG 139-2023 城市轨道交通工程管线综合设计标准 第8.0.3条
Topic positioning
How duct sizes are identified across drawing notation, BOQ itemisation and quota tier selection (outside or inside diameter / side length), how 'diameter' and 'perimeter' are taken in developed area calculation, and how elevation notation is checked.
Core conclusions
1. Size notation basis (mandatory national standard, original wording) Code for Acceptance of Construction Quality of Ventilation and Air Conditioning Works GB 50243-2016, clause 4.1.3: 'Metal duct sizes are governed by outside diameter or outside side length; non-metal duct and air shaft sizes are governed by inside diameter or inside side length. Circular duct sizes should preferably comply with Table 4.1.3-1 and rectangular duct sizes with Table 4.1.3-2. Circular ducts should preferentially adopt the basic series; irregular oval ducts should be treated by analogy with rectangular ducts and are governed by flat side length and short-axis length.' Commentary points: circular ducts divide into a basic and an auxiliary series, and 'general supply, exhaust and air conditioning systems should use the basic series'; dust removal and pneumatic conveying systems have high in-duct flow velocities where the diameter strongly affects the pressure loss, so the auxiliary series may be used on the premise of preferring the basic series. Rectangular ducts 'use the specified side lengths, combined as needed' - the two side lengths of A x B are noted separately and combined as needed, not given as one fixed perimeter value.
2. Developed area calculation basis (GB/T 50856-2024 Table G.2.1 problem notes, original wording) Table G.2.1 'fabrication and erection of ventilation ducts (code: 030702)', note 1: 'The developed area of ducts deducts no openings of inspection holes, measuring holes, supply outlets or exhaust inlets; the duct length follows the centreline length shown on the design (main and branch ducts divided at the intersection of their centrelines), including the lengths of bends, tees, reducers, round-to-rectangular transitions and other fittings, but excluding the length occupied by components. The developed area of ducts excludes the collar overlap areas of ducts. Duct tapers: circular ducts are calculated by mean diameter and rectangular ducts by mean perimeter.' Hence the general formulas: circular F = pi x D x L and rectangular F = 2 x (A + B) x L, where L is the centreline length shown on the design. The sheet for seam laps (bite) and collar overlaps is already in the material consumption of the quota (or the all-in unit rate) and must not be added to the developed area - the standard text expressly states 'the developed area of ducts excludes the collar overlap areas of ducts', which is the direct basis for judging 'whether the seam overlap quantity is charged separately'. Other notes of the same item: note 2, 'wall sleeves are calculated by developed area and included in the applicable ventilation duct quantities according to material and thickness requirements'; note 3, where the section steel of clean ventilation ducts must be galvanised, the work content shall note the galvanising of the section steel; note 4, factory-made ducts are itemised under the applicable ventilation duct codes; note 5, stainless steel smoke exhaust ducts are itemised under the applicable stainless steel sheet ventilation duct codes; note 6, the ventilation duct items include the fabrication and erection of supports and hangers, which, where listed separately, follow the applicable item codes of Annex N, other and auxiliary works. The item descriptions of Table G.2.1 are 'name / material / shape / size / plate thickness / joint type' - size, plate thickness and joint type are parallel attributes; missing any one prevents exact tier selection.
3. Measurement basis of local consumption standards (Beijing DB11/T 2382-2024 ventilation and air conditioning erection works)
- Clause 6.7.29: 'Ventilation duct fabrication and erection quantities are calculated by developed area on the inside dimensions shown on the design, without deducting the opening areas of inspection holes, measuring holes, supply and return outlets and the like.'
- Clause 6.7.30: 'The duct length follows the centreline length of the duct shown on the design, without deducting the lengths of bends, tees, reducers and other fittings, but deducting the length occupied by valves and components; the centrelines start and end at the intersection of centrelines.'
- Clauses 6.7.39 (GRP ducts) and 6.7.41 (composite ducts): calculated by developed area on the outside dimensions shown on the design, without deducting opening areas, the duct length as in clause 6.7.30.
- Clause 6.7.32: duct wall sleeves are calculated by the sleeve developed area and follow the applicable duct fabrication and erection items; duct end closing plates are calculated by the cross-sectional area of the duct closed and follow the applicable duct fabrication and erection items.
- Clause 6.7.36: plenum boxes are calculated by developed area by longest side, without deducting the opening areas of the connected ducts. Note the basis difference: metal (thin steel sheet, clean panel) ducts are measured on the inside diameter, GRP and composite ducts on the outside diameter; while drawings are noted on the outside diameter / side length (GB 50243-2016 clause 4.1.3). For the same duct, the 'notation basis' and the 'measurement basis' differ by 2 x plate thickness - small for thin plate, but this is exactly where quantity reconciliation disputes arise at final account; the adopted basis must be consistent across the bill and stated in the explanatory notes of the estimate.
4. Elevation notation and size checking points
- GB/T 50114-2010 clause 4.5.5: 'Elevations noted for rectangular ducts shall denote the duct invert; elevations noted for circular ducts shall denote the duct centreline. Where these methods are not used, an explanation shall be given.'
- SJG 139-2023 (design standard for service coordination of urban rail transit works), clause 8.0.3: elevations, chainages and levels are in metres, others in millimetres; 'rectangular services such as ducts, cable trays and busways shall note the internal invert elevation; circular pipes such as water pipes, vent stacks and automatic extinguishing pipes shall note the pipe centreline elevation'. Its commentary points out that elevation notation shall allow for the wall thickness of non-metal ducts or air shafts, the insulation and the fire-protection board thickness; the invert elevation shall be that of the finished service; for circular services noted at the centreline, drainage or venting requirements at reducers shall be considered, treating them as bottom-flat or top-flat eccentric reducers. Checking practice: when reading a rectangular duct elevation, first confirm whether it is the internal invert or the finished invert (including insulation and fire-protection board), then convert to the duct top and the clearance control line from the short side of A x B; a circular duct elevation is at the centreline, so deduct D/2 (plus the insulation thickness) for the invert; drawings not noted by these methods and without explanation are notation defects and shall be referred back to the designer.
Applicability boundaries
- The size and developed area rules above apply to metal ducts of ventilation and air conditioning works (galvanised thin steel sheet, thin steel sheet, stainless steel sheet, clean panel) and building air shafts; GRP and composite ducts are measured on the outside diameter and must not share the same basis as metal ducts.
- 'No deduction of openings from the developed area' is a measurement rule for the duct body only; valves, outlets, diffusers, silencers and other components are listed separately under the applicable component items (code 030703) and measured by the quantities shown on the design; the two must not offset each other.
- Taper (reducer) sections themselves are fittings: their length merges into the duct centreline, neither deducted nor listed separately, the area counted at mean diameter / mean perimeter; circular and rectangular tapers take different bases and must not be interchanged.
- This card does not cover the quota tier boundaries and adjustment factors (each quota volume tiers by diameter, perimeter or longest side differently - fix the volume first, then the tier).
- The specific basis (inside / outside diameter) of regional consumption standards follows the current standard at the project location; local standards may differ.
Further reading
- GB 50243-2016 Code for acceptance of construction quality of ventilation and air conditioning works, clause 4.1.3 and its commentary, Table 4.1.3-1 (basic and auxiliary series of circular duct sizes) and Table 4.1.3-2 (rectangular duct sizes).
- GB/T 50856-2024 Standard for quantity take-off of general installation works, Annex G ventilation and air conditioning works, Table G.2.1 fabrication and erection of ventilation ducts (code 030702) and problem notes 1~6; separate listing of supports and hangers in Annex N.
- DB11/T 2382-2024 Consumption standard for construction works, chapter 6.7 ventilation and air conditioning erection works: clauses 6.7.25, 6.7.29, 6.7.30, 6.7.32, 6.7.36, 6.7.39 and 6.7.41.
- GB/T 50114-2010 Standard for HVAC drawing, clause 4.5.5; SJG 139-2023 Design standard for service coordination of urban rail transit works, clause 8.0.3 and its commentary.
Keywords
- 风管规格
- 外径外边长
- 内径内边长
- 风管展开面积
- 平均直径
- 平均周长
- 管中心标高
- 管底标高