Units of measurement for installing fans, fan coil units and air handling units (all measured per unit, computed from the quantities shown on the design drawings), comparison of tiering parameters (model, equipment weight, air volume, installation method) across the standard systems, and the cost boundary between installation of the equipment itself and base grouting, supports and height-related inefficiency
Installation line items for the three equipment classes are all measured per unit from the design drawings, so the unit itself is not in dispute - the disputes are all about the tiering parameters. The fan tiering basis varies with the standard system: the civil-building ventilation and air-conditioning volume tiers by fan type/model + installation method (DB11/T 2382-2024 clause 6.1.37 states that 'fan installation for general industrial and civil building works shall follow the corresponding ventilation and air-conditioning items'); industrial fans go to the machinery installation volume and tier by equipment weight (clauses 6.1.33 and 6.1.39; direct-drive includes body + motor + base, non-direct-drive excludes the motor); the railway building works volume tiers by air volume (TB/T 10831-2024 FY-2635 to FY-2646) and the railway motive power and rolling stock volume by equipment weight (TB/T 10833-2024 JY-1174 to JY-1177); fan coil units tier by installation method (clause 6.7.11), with induction units and multi-split indoor units absorbed into the fan coil items (clause 6.7.7); combined air handling units tier by cooling capacity or air volume (clause 6.7.10), with fresh-air units absorbed into the combined AHU items (clause 6.7.8). Base concreting goes to the building and finishing works volume and secondary grouting to machinery installation (clause 6.7.1); supports and packing supplied with the equipment are included in its installation, site-fabricated supports by weight and fan hangers by model (clauses 6.7.5 and 6.7.24).
Applicable Codes
- 北京 DB11/T 2382-2024 建设工程施工消耗量标准 第6.7节、第6.1.33~6.1.39条
- 天津 天津市安装工程工程量清单计价指引(2025)G 通风空调工程 表G.1(030701)、表G.4(030704)、表A.8 风机安装(030108)
- GB/T 50856-2024 通用安装工程工程量计算标准 第3.0.9条
- TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程 Ch. 3第三节 通风及空调工程
- TB/T 10833-2024 铁路工程预算定额 Vol. 12 机务车辆机械工程 Ch. 6第十节 风机
What this card covers
For the three HVAC equipment classes - fans, fan coil units and air handling units (combined AHUs) - a comparison of the units of measurement, the quantity take-off rules and the tiering parameters under the works quantity standards and the consumption (quota) standards, and how to judge the cost boundary between 'installation of the equipment itself' and base grouting, support fabrication and height-related inefficiency.
Core conclusions
1. The unit of measurement is uniformly 'per unit', computed from the quantities shown on the design drawings; the unit itself is not in dispute. GB/T 50856-2024 table A.8.1 fan installation (code 030108) and table G.1.1 fabrication and installation of ventilation and air-conditioning equipment and components (code 030701) are both measured per unit, with the quantity computed from the design drawings. DB11/T 2382-2024 clause 6.7.16: 'the consumption for fan installation shall include erecting the motor within the work content, and its installation quantity shall be computed from the design drawings'; clause 6.7.11: 'the installation quantity of fan coil units shall distinguish the installation method and be computed from the design drawings'.
2. The fan tiering parameter varies with the standard system; four bases coexist, and the volume must be fixed before pricing:
- BOQ item description (GB/T 50856-2024 table A.8.1 explanatory notes): fan types split into centrifugal ventilating (induced-draft) fans, axial fans, rotary blowers, centrifugal blowers and other fans; 'specification means air volume, pressure, power, noise, anti-corrosion, explosion-proof, etc.' - the BOQ description is by performance parameters, not by weight.
- DB11/T 2382-2024 (consumption standard): clause 6.1.37 'fan installation for general industrial and civil building works shall follow the corresponding ventilation and air-conditioning items' - the watershed between civil and industrial; clause 6.1.33 'fan installation items shall be set according to fan type and fan weight and other influencing factors, combined with the relevant codes'; clause 6.1.39 'the installation quantity of fans shall distinguish equipment weight and be computed from the design drawings'.
- Railway building works (TB/T 10831-2024 volume 10): tiered by air volume - centrifugal fans up to 4500 / up to 7000 / up to 19300 / up to 62000 / up to 123000 m3/h; axial, diagonal and mixed-flow fans up to 8900 / up to 25000 / up to 63000 / up to 140000 m3/h; roof-mounted fans up to 2760 / up to 9100 / over 9100 m3/h (FY-2635 to FY-2646; the work content includes unpacking inspection, hoisting, levelling and alignment, shimming, grouting and bolt fixing).
- Railway motive power and rolling stock works (TB/T 10833-2024 volume 12): tiered by equipment weight - installation of centrifugal fans at equipment weight up to 0.5 t / up to 1 t / up to 1.5 t / up to 2 t (JY-1174 to JY-1177).
3. Computing equipment weight (this basis must be applied first when tiering by weight): clause 6.1.39 - direct-drive fan weight = the total of fan body + motor + base; non-direct-drive fan weight = body + base, excluding the motor. GB/T 50856-2024 table A.8.1 explanatory notes state the same basis: 'a direct-drive fan includes the fan body, the motor, the gearbox and the base; a non-direct-drive fan includes the fan body and the base, excluding the motor'. Clause 6.1.55 - units mounted on one common base count as one overall equipment weight; units not on one base count the total weight of the main and auxiliary units and the bases; the equipment weight shall include the body and the weights of valves, piping, supports, platforms, ladders and guards integral with the equipment; unit coolers count body + motor + base; where items are divided by 'model', old and new designations are interchangeable, and an item may be applied where the actual weights of similar models differ by no more than 10%.
4. Fan coil units tier by installation method, not by weight: clause 6.7.11 distinguishes the installation method and computes by number. Clause 6.7.7: 'installation of indoor units of multi-split air-conditioning systems and of induction units shall follow the corresponding fan coil installation items by installation method' - induction units and multi-split indoor units have no standalone line items and are absorbed into the fan coil items.
5. Air handling units (combined AHUs) tier by cooling capacity/air volume; fresh-air units are absorbed, and there is no tiering by functional section:
- Clause 6.7.8: 'fresh-air unit installation shall follow the corresponding combined air handling unit installation items' - no separate line item is set for fresh-air units.
- Clause 6.7.10, air-conditioning unit installation quantities: variable-air-volume terminal devices by the quantity shown on the design drawings; air curtains by type and installation method, by number; outdoor units of multi-split systems, split air conditioners and air handling units by cooling capacity or air volume, by number; fresh-air purifiers by air volume and type; fresh-air ventilators by air volume and installation method; heat recovery units by air volume.
- Clause 6.7.6: 'constant-air-volume terminal installation shall follow the variable-air-volume terminal installation items'.
- In the clauses cited, the tiering parameter for air handling units is cooling capacity/air volume; no provision tiers by 'number of functional sections' appears; functional sections affect only the work content of site assembly and the air leakage testing requirement, not the measurement tiering.
- Quick reference for related equipment: fan boxes (6.7.17) by installation method and air volume; kitchen fume purification units (6.7.18) by air volume; chillers (6.7.21) by cooling capacity; cooling towers (6.7.23) by the circulating cooling water rate of the tower itself; air showers (6.7.15) by weight; natural roof ventilators (6.7.20) by diameter.
6. The boundary between the equipment installation cost and bases, supports and height:
- Bases: clause 6.7.1 'base concreting for ventilation and air-conditioning works shall follow the corresponding building and finishing works items; secondary grouting shall follow the corresponding machinery installation items'. Clause 6.1.56: 'anchor-bolt grouting and grouting between equipment bases and foundations shall be computed by grouting volume as shown on the design drawings'.
- The BOQ basis for grouting is the opposite: GB/T 50856-2024 clause 3.0.9 'in this standard, apart from the machinery installation items marked as including grouting, although the work content of the other equipment items is not marked as including grouting, it shall include the grouting work content required to complete the relevant items' - the BOQ all-in unit rate already includes grouting, which may not be listed separately; but some local standards expressly exclude it (e.g. SJG 111.3-2022 clause 1.1.4 lists among what the chapter items exclude 'anchor-bolt pockets and base grouting', 'water, electricity, gas, oil and fuel for trial operation', 'erection and dismantling of scaffolds', etc.). Always check the volume notes before citing.
- Supports: clause 6.7.5 'the consumption for ventilation and air-conditioning equipment installation shall include erecting the equipment supports or base packing supplied with the equipment'; site-fabricated supports are counted separately - clause 6.7.24: fabrication and installation of equipment supports by the weight of each support, computed from the design drawing weight; fan hangers by fan model, computed by number; equipment-base packing by material, computed by weight; clause 6.1.38 'fabrication and installation of fan supports shall follow the corresponding items of the static equipment and process metal structures volume'; clause 6.7.37 seismic supports by type, computed by number.
- Height-related inefficiency: clause 6.7.2 'where equipment or materials in ventilation and air-conditioning installation are installed at a height above 6 m, the labour inefficiency caused by over-height work shall follow clause 6.1.2 of this standard'; table 6.1.2 over-height coefficients - working height up to 10 m: 0.10; up to 30 m: 0.20; up to 50 m: 0.50 - applied to the labour consumption of the corresponding items.
- Materials not priced in the standard: clause 6.7.3 'the consumption of principal materials in ventilation and air-conditioning works, such as ducts, valves and air terminals, shall be shown in the added brackets and shall not serve as the base for other material costs'.
Applicable boundaries
- The tiering conclusions in this card are tied to the specific standard versions; tiering parameters change across systems and versions and may not be applied across volumes or across versions - the same fan may tier by model in the civil-building ventilation and air-conditioning volume, by equipment weight in the machinery installation volume, by air volume in the railway building works volume and by weight in the railway motive power volume; change the volume and you change the tiering parameter.
- Clause 6.1.37 is the 'civil versus industrial' watershed: fans for general industrial and civil building works follow the corresponding ventilation and air-conditioning items; industrial fans (including low- and medium-pressure centrifugal fans, dust-handling, corrosion-resistant, explosion-proof, high-pressure centrifugal, boiler centrifugal, smoke-exhaust and multi-vane fans, and industrial axial, cooling-tower axial and roof-mounted axial fans) follow the corresponding items of clauses 6.1.35 and 6.1.36, in the machinery installation volume, by weight.
- Quantities are measured from the design drawings, not decided by the installation method actually used on site; BOQ and quota quantities share the unit 'per unit' but describe items on different bases (the BOQ by performance parameters such as air volume, pressure, power and noise; the quota by weight or model), so pricing must convert by the quota tiering parameter.
- Whether the fan 'strip and inspect' line items apply, and where the cost of reserved hoisting openings and structural strengthening falls, are not regulated by the clauses cited here; they must be judged from the volume notes of the local quota, the preliminaries provisions and the contract, and must not be inferred directly from this card.
- Vibration isolation: satisfy the design and the product technical documents (DB11/T 1832.15-2022 clause 7.4.5: equipment vibration isolation shall meet the design and product technical documents; fan coil units shall have independent supports and hangers with appropriate vibration isolation measures, hanger rods and bearers connected with double nuts); whether the vibration isolators themselves are inside the installation line items must be confirmed from the volume notes of the quota used.
Further reading
- DB11/T 2382-2024 Construction Consumption Standard for Building Works, section 6.1 machinery installation: 6.1.1 (what the installation consumption includes), 6.1.2 + table 6.1.2 (over-height coefficients), 6.1.33 to 6.1.39 (VI fan installation), 6.1.53 to 6.1.56 (other machinery, equipment weight and grouting computation); section 6.7 ventilation and air-conditioning installation: 6.7.1 to 6.7.3 (general provisions), 6.7.4 to 6.7.24 (fabrication and installation of ventilation and air-conditioning equipment and components), 6.7.25 to 6.7.37 (thin steel sheet ducts and fittings), 6.7.38 to 6.7.43 (GRP/composite/flexible ducts), 6.7.44 to 6.7.52 (valves, air terminals), 6.7.59 to 6.7.60 (attenuation devices), 6.7.61 to 6.7.68 (underground civil defence ventilation).
- GB/T 50856-2024, the national quantity take-off standard for general installation works, clause 3.0.9 (where the grouting work content sits); Annex A table A.8.1 fan installation (code 030108) and its explanatory notes; Annex G table G.1.1 fabrication and installation of ventilation and air-conditioning equipment and components (code 030701).
- DB11/T 1832.15-2022 Construction Workmanship Rules for Building Works, Part 15: ventilation and air-conditioning installation, clause 7.4.5 (installation rules for packaged and combined air handling equipment, heat recovery units, fresh-air units, fan coil units and induction units, and variable-air-volume/constant-air-volume and multi-split terminals, including the testing requirement of an air leakage rate no more than 2% at 700 Pa static pressure).
- TB/T 10831-2024 Railway Works Budget Quota Manual, volume 10, building works, chapter 3 building equipment works, section 3 ventilation and air-conditioning works, item 1 installation of ventilation and air-conditioning equipment and components, (2) fan installation, line items FY-2635 to FY-2646 (tiered by air volume).
- TB/T 10833-2024 Railway Works Budget Quota Manual, volume 12, motive power and rolling stock machinery works, chapter 6 installation of specialised machinery, section 10 fans, item 1 centrifugal fans, line items JY-1174 to JY-1177 (tiered by equipment weight).
- SJG 111.3-2022 Consumption Standard for Urban Utility Tunnels (volume 3, ancillary facilities installation works), clause 1.1.4 (what the chapter items exclude: off-site transport, secondary handling, base scraping and anchor-pocket dressing, anchor-bolt pockets and base grouting, water, electricity, gas and oil for trial operation, combined trial operation, special packing, scaffold erection and dismantling, piping systems beyond the first flange of the body, etc.) - for comparing how grouting and preliminaries costs are treated across volumes.