unit of measurement
- 01
Units of measurement for installing fans, fan coil units and air handling units (all measured per unit, computed from the quantities shown on the design drawings), comparison of tiering parameters (model, equipment weight, air volume, installation method) across the standard systems, and the cost boundary between installation of the equipment itself and base grouting, supports and height-related inefficiency
Installation line items for the three equipment classes are all measured…
北京 DB11/T 2382-2024 建设工程施工消耗量标准 第6.7节、第6.1.33~6.1.39条天津 天津市安装工程工程量清单计价指引(2025)G 通风空调工程 表G.1(030701)、表G.4(030704)、表A.8 风机安装(030108)GB/T 50856-2024 通用安装工程工程量计算标准 第3.0.9条2026-11-08 - 02
Distinguishing the birdcage scaffold (a work platform, by m2) from full-space steel-tube falsework (formwork support of cast-in-place beams, by m3): purpose, unit, quota volume, and non-interchangeability
The birdcage scaffold and full falsework are two different objects: the…
TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程 Ch. 1 第四节 脚手架工程 二、单项脚手架(二)满堂脚手架 FY-440~FY-442TB/T 10823-2024 铁路工程预算定额 Vol. 2 桥涵工程 Ch. 5 第四节 二(二)支架安拆 QY-970SJG 181.2-2024 市政工程消耗量标准 Vol. 2 桥涵工程 8.2.2 措施项目2026-10-22 - 03
JTG/T 3832-2018 highway budget quota: suspension-bridge main cables and steel box girders measured by mass in t, and measurement units of suspension-bridge work items
Per Section 10 steel structures (lower volume) of JTG/T 3832-2018 "Highw…
JTG/T 3832-2018 公路工程预算定额(下册 第十节 钢结构工程)JTG 3830-2018 公路工程建设项目概算预算编制办法2026-09-25 - 04
Measurement units for landscape plant installation (plant/m/m2/clump), plant specification terminology, and item-characteristic description essentials (GB/T 50858-2024)
Plant installation measurement units are fixed by category and planting…
GB/T 50858-2024 · Standard for Measurement of Quantities of Landscape and Greening WorksGB/T 50500-2024 · Standard for bills of quantities and valuation for construction worksCJJ 82 · Code for Construction and Acceptance of Landscape and Greening Works2026-09-25 - 05
Measurement units of highway subgrade site-clearing items: JTG/T 3832-2018 budget quota 1-1-1 tree felling and stump removal (10 trees), topsoil stripping (100 m3), and BOQ calibers
JTG/T 3832-2018 "Highway works budget quota", Chapter 1 Section 1, item…
JTG/T 3832-2018 · Budget Quota of Highway Engineering Ch. 1第一节 1-1-1JTG/T 3831-2018 · Estimate Quota of Highway EngineeringDB14/T 1319—2021 · Specification for Standard Bills of Quantities and Measurement of Highway Works (Shanxi) 第202节2026-09-25