Engineering Knowledge Cards.
Confidence HighUpdated 2026-10-14

Measuring and pricing drainage (discharge) pipes: fixing the measurement basis and quota items by scenario - roofs, urban rail transit, municipal bridges and culverts, railway bridge decks

Drainage pipe measurement splits by scenario: pipe bodies (downpipes / drainage pipes / the discharge pipes themselves) by drawn length in m (extended metres), and finished parts - discharge outlets, rainwater heads, hoppers, drain inlets - by count (per set / per piece). Building roofs follow DB11/T 2382-2024 Articles 4.10.21 to 4.10.23 (downpipes by length; hoppers, bends and drain inlets by count; roof drain (drip) pipes and vent pipes by count); urban rail follows Article 10.1.90 of the same standard (discharge pipes by length); municipal bridges follow SJG 181.2-2024 Article 7.2.4 (drainage pipes and weep holes by length in metres); railway bridge-deck drainage quotas count per 10 extended metres. The same member carries different units across industry quotas - apply the volume the project executes.

Applicable Codes

  • DB11/T 2382-2024 · Standard for Construction Consumption of Construction Works (Beijing) 第4.10节 屋面及防水工程(4.10.19~4.10.28)
  • DB11/T 2382-2024 · Standard for Construction Consumption of Construction Works (Beijing) 第10.1节 城市轨道交通工程·土建工程 Ⅷ 防水工程(10.1.88~10.1.93)
  • DB11/T 2382-2024 App. A 房屋建筑与装饰工程 A.9 屋面及防水工程(A-9-97、A-9-101)
  • SJG 181.2-2024 · Consumption Standard for Municipal Works (Volume 2) (Shenzhen) 7.2.4、7.3.2
  • TB/T 10832-2024 · Railway works budget quota manual: Water Supply and Drainage Works, Vol. 11 (2024 series) 册说明 十二、工程量计算规则
  • 湖南2025版《房屋建筑与装饰工程消耗量标准》
  • 2024铁路工程预算定额 桥涵工程·桥上设施·桥梁排水管道(QY-745、QY-747)

Scope of the question

The measurement basis and quota item rules for drainage pipes (roof downpipes / rainwater heads, rail and bridge-deck discharge pipes, municipal bridge and culvert drains and weep holes, railway bridge-deck drainage etc.). The core: pipe bodies by length versus finished outlets / rainwater heads by count, with items and units fixed by the industry / local quota volume executed.

Core conclusions

1. Building works - roofing and waterproofing (DB11/T 2382-2024 Section 4.10)

  • 4.10.21: downpipes and air-conditioner drains by drawn length (rainwater stacks / downpipes on centre-line length in m).
  • 4.10.22: hoppers, bends, drain inlets and GRP short pipes by drawn count.
  • 4.10.23: roof vent pipes, drain (drip) pipes, cowls and roof access covers by drawn count (roof drain / vent pipes per set / piece).
  • 4.10.19: tiled and profiled roofing by slope area on the drawn dimensions, without deducting chimneys, cowl bases, flues, small windows and valleys; membrane roofs by horizontal projection.
  • 4.10.20: roof waterproofing by area - sloping roofs on slope area, flat roofs (including screed-to-falls) on horizontal projection; upstands at parapets, movement joints and skylights merge into the roof quantity; gutters, eaves gutters, overhangs and canopies merge on developed area.
  • Hunan 2025 agrees: downpipes, galvanised-iron gutters and eaves gutters by drawn length; hoppers, drain inlets, rainwater outlets, bends and short pipes by drawn count.

Quota items (Beijing 2024, Appendix A Table A.9.2-4 roof drainage pipes, work content: pipe and fitting installation, fixing, jointing, sealing etc.):

  • A-9-97 HDPE downpipe, unit per set, containing 1.01 cast-iron drainage bends (with grating), galvanised wire mesh, ironwork etc.
  • A-9-101 plastic rainwater head d160, unit per set, containing 1.01 GRP head d160, 0.005 m3 ready-mixed pea-gravel concrete C15 etc.

2. Urban rail - civil waterproofing (DB11/T 2382-2024 Section 10.1 item 8)

  • 10.1.90: discharge pipes by drawn length.
  • 10.1.88: bridge-deck waterproof layers (bitumen, felt, waterproof mortar, rubber sheet, polyurethane coating) by drawn area.
  • 10.1.91: open-cut structure waterproofing - levelling, protection, membranes, clay blankets, coatings by area, holes up to 0.30 m2 undeducted.
  • 10.1.93: waterstops and movement-joint seals, swelling strips / mastic, stainless drip boxes by drawn length.

3. Municipal bridges and culverts (SJG 181.2-2024 Volume 2)

  • 7.2.4: installing drainage pipes and weep holes by drawn length in metres.
  • 7.3.2 work content: drainage pipes - marking, cutting, drilling, fitting collars, collecting hoppers, PVC pipe, joint gluing etc.; weep holes - cleaning, hot bitumen, binding, installing.

4. Railway - bridge-deck drainage (2024 railway budget quota, bridges and culverts, deck works, bridge drainage)

  • Items unit 10 extended metres, split by track type (ballasted / ballastless) x laying (direct discharge) x single / double side, e.g. QY-745 drainage pipe installation, ballastless track, direct discharge, double side; QY-747 ballasted, direct, double.
  • Materials include rigid PVC discharge pipes and covers, PVC gratings 250x250x10, PVC corrugated pipe d180, PVC bends d180, rigid PVC pipe d100, PE water pipe, PVC drainage pipe, sealant etc.

5. Railway - water supply and drainage (TB/T 10832-2024 Volume 11 notes, item 12)

  • Pipe length on the drawn centre line, branches from the main's centre to the branch end's centre.
  • Pipe quantities in extended metres; lengths occupied by fittings and valves sit inside the construction wastage - undeducted.
  • Pipe jacking by the jacked design length.

6. Common principle Discharge pipe is a cross-discipline colloquial name, its measurement varying by scenario: pipe bodies (downpipes / rainwater stacks, drainage pipes, the discharge pipes themselves) by length (m or extended metres); finished parts - outlets, rainwater heads, hoppers, drain inlets - by count (set / piece). The same member's unit differs across industry quotas (railway bridge drainage per 10 extended metres; municipal / building per m) - confirm the executed volume and unit before pricing.

Applicability limits

  • Rules vary with the executed standard / volume; the clauses cited illustrate Beijing, Shenzhen, Hunan and railway practice - projects elsewhere follow the contract's standard / volume; no cross-volume application.
  • In roof scenarios, separate pipe bodies (by length) from outlets / heads / hoppers (by count) - never convert count items to length and double count.
  • The items' work contents already include installation, fixing, jointing and sealing - no separate re-itemising.

Further reading

  • DB11/T 2382-2024 Section 4.10 roofing and waterproofing (4.10.19-4.10.28); Appendix A Tables A.9.2-4 and A.9.2-5.
  • DB11/T 2382-2024 Section 10.1 urban rail civil works, item 8 waterproofing, 10.1.88-10.1.93.
  • SJG 181.2-2024 Volume 2, 7.2.4 and 7.3.2.
  • TB/T 10832-2024 Volume 11 notes, item 12 quantity rules.
  • 2024 railway budget quota, bridges and culverts, deck works, bridge drainage, QY-745 / QY-747.

Keywords