Quantity take-off (measurement) follows design-drawn dimensions (measurement per drawings): general principle, rule exceptions, and final account linkage
Quantities are in principle calculated from design-drawn dimensions (measurement per drawings), not from actual site dimensions; only items where the method of measurement "provides otherwise" (e.g. earthwork by natural in-situ (undisturbed) volume, depth taken from surveyed elevation) and site instruction / variation record items not specified in the design (flowing sand and silt provisionally estimated, concealed works) are measured per actual conditions / site instruction / variation record. Parts constructed beyond design dimensions without variation or site instruction / variation record support are generally not measured in the final account.
Applicable Codes
- SJG 84-2020 市政维修工程消耗量标准 总则0.3.9
- DL/T 5465-2013 火力发电工程施工图预算编制导则 4.1.13
- DL/T 5468-2013 输变电工程施工图预算编制导则 4.1.11
- GB 50861-2013 城市轨道交通工程工程量计算规范 4.2.5
- DB11/T 638-2016 房屋修缮工程工程量计算规范 App. A.2.1
- GB/T 50326-2017 建设工程项目管理规范 18.3.3
- GB/T 51095-2015 建设工程造价咨询规范 8.2.4
Topic Positioning
This card answers the most common principle question in measurement of the works: should dimensions come from the design drawings or from actual site measurements? It gives the general basis of "measurement per drawings", the two classes of exceptions, and the final account linkage.
Core Conclusions
Quantities are in principle calculated from design-drawn dimensions, not as-built site dimensions: (1) several consumption standards state the same general provision, e.g., SJG 84-2020 "Consumption standard for municipal maintenance works", general provisions: "unless otherwise provided in this standard, quantities are calculated per design-drawn dimensions"; (2) power industry DL/T 5465-2013 Clause 4.1.13 and DL/T 5468-2013 Clause 4.1.11 both require calculation based on the construction drawings under the method of measurement prescribed by the quota norms (prescribed resource consumption standards), coordinated with the equipment and material schedules; (3) GB 50861-2013 "Code for measurement of urban rail transit works" Clause 4.2.5 (mandatory provisions of codes) requires the quantities in the bill of quantities (BOQ) to be calculated per the method of measurement in its appendix — dimension determination follows the method of measurement, not the as-built site. Two exception classes: first, items where the method of measurement "provides otherwise" (earthwork by natural in-situ (undisturbed) volume before excavation, excavation depth as the average depth from the surveyed natural ground level to the design ground level) — here the elevation is a surveyed value, but it is still rule-based calculation, not measuring the actual excavation outline; second, flowing sand and silt not specified in the design (DB11/T 638-2016 Appendix A.2.1 note 6) may be provisionally estimated in the BOQ and settled in the final account per the parties' site instruction / variation record confirmation. Practical implication: parts constructed beyond design dimensions without variation or site instruction / variation record support are generally not measured in the final account; earthwork and concealed works should proactively follow the site instruction / variation record process to put site facts in writing.
Applicable Boundaries
Applies to routine measurement of the works in preparation of the bill of quantities, preparation of the construction-drawing based budget (pre-tender estimate), and final account; not applicable to "measure-as-built" items such as demolition, items governed by site instruction / variation record or measurement sheets, and sub-items whose method of measurement explicitly requires actual or surveyed measurement. Specific bases of each discipline still follow that discipline's quota norms (prescribed resource consumption standards) / measurement code appendix.
Further Reading
SJG 84-2020 general provisions Clause 0.3.9; DL/T 5465-2013 Clause 4.1.13, DL/T 5468-2013 Clause 4.1.11; GB 50861-2013 Clause 4.2.5 (mandatory provisions of codes); DB11/T 638-2016 Appendix A Table A.2.1 (earthwork rules and site instruction / variation record treatment); final account linkage: GB/T 50326-2017 Clause 18.3.3, GB/T 51095-2015 Clause 8.2.4.
Keywords
Related Cards
- →
Earthwork excavation quantity take-off (measurement): working space width, slope coefficients, and haulage (disposal of surplus excavated material) quantities
Earthwork excavation quantity take-off (measurement) follows the three-level priority "design → project execution plan (construction methodology and site organization) → default values in standard appendix tables"; excavation and haulage are measured in the natural in-situ (undisturbed) volume before excavation, backfill in the as-completed volume; working space widths and slope coefficients are taken from tables by foundation material, soil class, and machine working position, and no slope is calculated where shoring boards are placed; the quantity for disposal of surplus (excavated) material = excavated volume − backfill reuse volume, haulage being measured in the natural-state volume with no additional bulking factor.
- →
Linking the five document types — contract, drawings, BOQ, site instructions / variation records, settlement — and managing the settlement chain of evidence
Using unified codes as the bond, lineage relations attached via linking fields, on-the-spot linkage in the workflow, and a basis for settlement ledger as the master index, build contract, drawings, BOQ, site instructions / variation records, and settlement into a traceable chain of evidence: every settlement amount must be able to state which contract clause it relies on, which BOQ item it corresponds to, which drawing it comes from, and which site instruction / variation record triggered it; only when the four elements are complete and certification and sign-off are complete is it included in settlement.
- →
Intermediate processes to retain in AI quantity takeoff: a five-layer trace framework (input basis, calculation derivation, result mapping, AI traces, archiving)
AI takeoff traces fall into five layers: (1) input basis (drawing version / calculation-rule version / construction-organization parameters / data sources); (2) calculation derivation (formulas + formula sources + intermediate-quantity chains + deduction/inclusion records + significant digits); (3) result mapping (formula <-> BOQ code <-> item-characteristic correspondence, aggregation paths, cross-footing verification); (4) AI generation traces (model version + intermediate expression chains + manual review of at least 10% + differences between draft and final); (5) archiving (working papers archived as process documents). Goal: every final figure can be traced back through derivation to the drawings — traceable, re-checkable, auditable.
- →
Settlement of works variations without signed instructions (qianzheng): five-tier determination rules, substitute evidence chains, and variation pricing principles
Signed instructions are not the only settlement basis. Whether an un-instructed variation can be settled depends on "who proposed the variation and whether traces of employer/supervisor approval exist": if not proposed by the contractor and instructions/drawings exist, or proposed by the contractor with either the employer's or the supervisor's consent → a determinate opinion can be issued and the amount settled; proposed by the contractor with drawings only and no confirmation → only an elective opinion, with risk; no confirmation and no drawings → costs should not be adjusted. Substitute evidence — design variation sheets, meeting minutes, supervisor records, photos/videos, etc. — can be collected; the deemed-acceptance rule for late verification and variation pricing principles can also be invoked.
- →
Distinguishing the quantity calculation of cable trays (bridges), wireways, and conduits (GB/T 50856-2024 electrical installation measurement)
Cable trays (the collective term for ladder racks, trays, and channel boxes) carry cables, wireways carry insulated wires, conduits protect wiring; the bodies of all three are measured by length (m) per the design dimensions, without deducting the lengths occupied by intermediate junction boxes (outlet boxes), lamp boxes, switch boxes, socket boxes, or fittings — the boxes are counted separately by "count"; conduits add junction/pull boxes when exceeding 40 m without bends, 30 m with 1 bend, 20 m with 2 bends, or 10 m with 3 bends.
- →
Four essential elements of a valid site instruction / variation record: signature chain of personnel, time points, quantity substantiation and price basis
A valid site instruction / variation record = four elements complete: (1) Personnel: signed by the contractor's handling officer and project manager with seal; reviewed by the discipline supervising engineer; signed by the Engineer (chief supervising engineer), who computes the fee; and submitted to the employer for approval (duration-related site instructions / variation records additionally require the seal of the follow-up audit unit); (2) Time: date of occurrence/completion, submission within the agreed time limit, and the employer's failure to verify within the stipulated period being deemed acceptance; (3) Quantity: location, dimensions and quantities plus calculation formulas, sketches/photos and original vouchers signed by all parties, measured as actually incurred; (4) Price: calculation process and result, employer's approval of material prices, and the signed dayworks confirmation result. Missing calculation formulas or photos, or late submission, are the gaps most frequently attacked in settlement disputes.
Cited By
- ←
Handling inconsistencies between the content of site instructions and certified records and as-built drawings: written clarification -> adjustment to facts -> report record -> construction cost expert assessment (judicial appraisal) per facts / site survey
An inconsistency between a site instruction / variation record and the as-built drawing cannot be settled by a blanket 'drawing prevails' or 'site instruction / variation record prevails': at final account review the employer and contractor clarify the facts in writing and adjust accordingly (GB/T 51095-2015 8.3.6); if written clarification fails, the construction cost consultancy judges and records the issues in the final account review report; once in construction cost expert assessment (judicial appraisal), quantities are calculated on the basis of actually completed amounts (GB/T 51262-2017 5.9.1); where quantities cannot be confirmed, the expert assessor asks the client to organize a site survey and assesses per the survey results (5.10.2, 4.6). Validity is judged by evidence strength: a site instruction / variation record fully certified and signed off by both parties and the supervisor, with the drawing merely omitting the work — the site instruction / variation record prevails and the as-built drawing should be corrected; a drawing jointly confirmed with a site instruction / variation record suspected of inflated quantities — reduce per actual quantities; documents reflecting different points in time — the final actual state prevails.
- ←
Preventing double counting of earthworks where trench, manhole pit and spread foundation pit overlap: physical overlap versus intersection of battered faces, assigning the manhole-length section by the larger cross-section, the pit deepening increment, pipe-joint working pits already included, and one trench width taken once for multi-pipe runs
Three tests prevent double counting: (1) physical overlap (the same space excavated twice) is counted once, and battered-face intersections are expressly 'not deducted' by most quota manuals (Hunan 2025 IV.4; SJG 111.1-2022 table 1.2.3-1 note 2; SJG 84-2020 table 7.2.9 note 1); (2) the BOQ quantity (GB/T 50857-2024, drawn dimensions plus working space, no batter) and the quota quantity (working space plus batter) are computed independently - never mix then deduct; (3) the manhole-length section is assigned by section size: if A-pit is no less than A-trench the section counts as pit and the trench length is reduced by that section, if A-pit is smaller the manhole length merges into the trench and no pit is listed, the total taking the max, not the sum; where the pit floor lies below the trench floor, the deepening increment delta V = A-pit x (H-pit - H-trench) is added; pipe-joint working pits and manholes along the line are covered by 2.5% of the trench earth and rock quantity (1.5% for wells and joint pits in the railway volume 12), not listed separately.
- ←
Quantity demarcation and length measurement between risers and branch pipes in water supply and drainage (heating, gas) piping: risers accumulated segment by segment by design level difference (storey-height accumulation only as a check), the tee/cross intersection on the riser centreline as the demarcation point, branch pipes measured from that centre to the fixture inlet, vertical segments measured on isometric drawings and horizontal segments on plans, same-floor versus floor-through drainage branch differences, and parallel risers in one shaft listed pipe by pipe
Riser length is accumulated segment by segment along the pipeline centreline shown on the design as upper level minus lower level; storey-height accumulation is only a check value and never a measurement basis. The demarcation between riser and branch is the tee or cross intersection on the riser centreline; the branch runs from that centre point to the centre of the farthest fixture or equipment connection, and the length of the tee fitting itself is neither deducted nor added (fitting installation is already inside the piping item). Parallel risers sharing one shaft must be itemised pipe by pipe by material, connection form and specification, never merged into one measurement.
- ←
Water supply and drainage pipeline quantities are computed by the centerline length shown on the design drawings: lengths occupied by fittings, valves and chambers are not deducted; construction wastage is not counted additionally
Water supply and drainage pipeline quantities are computed by the pipeline centerline length shown on the design drawings (linear meters), not by the actual installed length; the lengths occupied by valves, pressure reducers, steam traps, water meters, expansion joints and other fittings, and by the various chambers, are not deducted; the length occupied by square expansion compensators is added into the pipeline quantity; the additional lengths laid during construction for obstacle avoidance and bending are construction wastage and are not counted again. Municipal drainage follows a separate basis — "manhole centre to manhole centre, deducting the clear space of each inspection chamber" — and the applicable basis depends on the quota manual being executed for the project.
- ←
Routes for claiming final account quantities of concealed works where no measurement records exist: the pre-concealment measurement confirmation procedure, who bears the exposure costs after covering without notice, the ranking of supplementary evidence, the requirements for retrospectively certified quantity sheets, and the interface with measurement from drawings
The absence of measurement records does not mean quantities cannot be claimed, but the claim route shifts from 'measurement certified on as-built facts at the time' to 'measurement re-proven from facts of completion plus a chain of evidence', with two adverse consequences: (1) where the works were covered without notice, the costs of drilling probes or uncovering for inspection and of reinstatement are always borne by the contractor and are not shifted by conforming quality (GF-2017-0201 clause 5.3.4); (2) the burden of proof is heavier - where there is no signed certification, the drawings cannot reflect the work and no site inspection is possible, the expert assessment refuses measurement as an 'item not susceptible to assessment' (T/ZBD 100.4-2023 clause 4.3.6 item 5). On the measurement confirmation procedure, failure to check within the time limit triggers deemed approval (GB/T 50500-2024 clauses 7.1.5 and 7.1.6), and measurement results signed and confirmed by both parties become the basis for the final account (clause 7.1.8), but such approval 'shall not serve as the basis for deeming the relevant works handed over as conforming'; quantities ultimately return to reconstruction from design-drawing dimensions plus variation instructions plus certified site records plus measurement rules (clause 7.2.1).
- ←
Calculation rules and values of reserved (additional) lengths in cable laying quantities
Cable quantity = the single-cable laying length shown on the design + various reserved (additional) lengths; where the design stipulates, follow the design, otherwise take the standard values: slack/bending/crossing add 2.5% (on the base of the drawn length plus the sum of reservations); terminations 0.5 m, joints 0.5 m, entry to distribution panels 1 m, power distribution boards 1.5 m, control panels 2 m, plant transformers 3 m, main transformers 5 m, etc. (GB 50217-2018 Appendix G); directly buried cables entering buildings may take 5% of the route length.
- ←
Measurement of the works rules in Chapter 8 of GB 50500-2013: measurement basis and mandatory provisions, verification of completed-works quantity reports and deemed approval upon lapse of the period, notice procedure for on-site measurement and consequences of absence, and review of objections to measurement results
Chapter 8 of GB 50500-2013: quantities must be calculated under the rules of measurement of the current national measurement codes and determined by the quantities of the work the contractor has actually completed and that are to be measured (clauses 8.1.1 and 8.2.1 are mandatory provisions; tender BOQ quantities are only estimates). The contractor submits the completed-works quantity report each agreed period; the employer verifies within 7 days of receipt and notifies the contractor; where verification is not done within the agreed time, the quantities in the report are deemed the quantities actually completed by the contractor (8.2.3). On-site measurement verification requires notice to the contractor 24 hours before measurement; if the contractor is absent it is deemed to approve the employer's verification result, and if the employer fails to notify as agreed so that the contractor cannot attend, the verification result is invalid (8.2.4). A contractor disputing the verified result must raise written objections within 7 days of notice with calculation records attached, and the employer reviews within 7 days; continuing disputes follow the contract's dispute resolution (8.2.5). Under the current GB/T 50500-2024, clauses 7.1.7 and 7.1.8: measurement results signed and confirmed by both parties serve as the basis for contract price adjustment and settlement.
- ←
Quantity take-off of electrical conduit: GB/T 50856-2024 table D.12.1 (code 030412) measures by design-drawn length; the horizontal plus vertical segment method, attribution of reserved lengths, and listing rules for exposed versus concealed installation
Under GB/T 50856-2024, conduit and wiring form table D.12.1 with code 030412 (the 2013 edition's table D.11 / code 030411 is superseded; in the 2024 edition 030411 now designates overhead distribution lines of 10kV and below). Conduit is measured in m, calculated as length from the design drawings, without deducting the lengths occupied by junction boxes, luminaire boxes, switch boxes, socket boxes and wiring cabinets within the run. The quantity is L = sum of L_h,i + sum of L_v,j: horizontal segments follow the drawn path of the conduit centreline on the plan (not the straight-line distance between two points), and vertical segments are L_v = upper installation level minus lower installation level. This formula is a take-off decomposition method, not standard text; the reserved length for entering cabinets and panels belongs to the wiring (table D.17.3-8) and must not also be counted into the conduit itself, to avoid double counting.
- ←
Quantity take-off of cable tray and wireway body length: the segmented formula L = Sum(L_h) + Sum(L_v) for horizontal segments (L_h) and vertical segments (L_v), measurement against the dimensions shown on the design drawings, and the rule of no deduction for bends and tees (Beijing 2021 Consumption Standard, Volume 4, Chapter 11)
Cable trays and wireways are measured by length (extended metres, unit m) against the dimensions shown on the design drawings, without deducting the length occupied by bends and tees. Practice applies the segmented summation formula L = Sum(L_h) + Sum(L_v): horizontal segments are measured along the tray centreline path shown on the plan, vertical segments follow the level difference of the two ends L_v = |H_top - H_bottom| (both ends taken from the same datum); different materials or sizes are accumulated separately, and path increments caused by MEP coordination detours do not adjust the quantity.
- ←
Handling the mismatch between construction-drawing quantities and tender BOQ quantities: measurement of actually completed quantities under GB 50500-2013 Chapter 8 and the 15% deviation price adjustment of Section 9.6 (including the divergence between the two lump-sum contract regimes of Clauses 8.3.1/8.3.2), against GB/T 50500-2024 Sections 7.2/8.2/8.9 routing the rules by contract type
GB 50500-2013 Clause 8.2.1 (a mandatory provision) requires that 'quantities shall be determined by the quantities of the contract works that the contractor has completed and that are to be measured'; the quantities stated in the tender BOQ are only estimated quantities and the common basis for tender pricing, and the final account quantities are determined by the quantities actually completed and to be measured, calculated by the contractor under the calculation rules of the current national measurement standards, not by the BOQ quantities. Clause 8.3.1 provides that for lump-sum contracts formed by tendering on a bill of quantities basis the quantities are still calculated under Section 8.2 (i.e. quantity differences remain adjustable), which diverges from Clause 8.3.2: for lump-sum contracts formed by letting the works on the basis of construction drawings and budgets examined and approved, except for variations, the BOQ quantities are the final settlement quantities. GB/T 50500-2024 instead routes the rules by contract type: for unit-rate contracts the employer bears the BOQ defects, the works are re-measured under Clause 7.2.1 and the price adjusted via Clause 8.2.1 (15% as the boundary) and then Clauses 8.9.1/8.9.2; for lump-sum contracts Clause 7.2.2 allows no re-measurement, and Clause 8.2.3 provides that 'the contract price and the time for completion shall not be adjusted for defects in the contract bill of quantities' (except items priced at provisional quantities). Directional rule for quantity deviations beyond 15%: where the increase exceeds 15%, the all-in unit rate of the increased portion is adjusted downwards; where the decrease exceeds 15%, the all-in unit rate of the remaining portion after the decrease is adjusted upwards.
- ←
Measurement split for steel members versus cladding sheets: columns, beams, roof trusses, monitor frames, wall frames and wind frames by mass (t); profiled steel floor decking and steel wall sheeting by area (m2); coatings charged separately
Steel space trusses, roof trusses / bracket trusses / lattice trusses, steel columns, steel beams, monitor frames, wall frames, wind frames and similar metal members are computed by mass (t) from the dimensions shown on the drawings - the mass of holes is not deducted, electrodes, rivets and bolts are not added; corbels, cantilever beams, gusset plates, stiffening rings, liner pipes, braking beams, stoppers and other attached members are merged in. Steel floor decking is computed by laid horizontal projected area and steel wall sheeting by hung developed area (m2), with no deduction for individual holes up to 0.30m2, and corner and edge trims add no area. Consumption of metal members excludes paint and fire-protection coatings - where required by design they are computed separately under clause 4.15 (except surfaces already coated ex-works).
- ←
Defining the scope of bridge abutment backfill (fill behind abutments): longitudinal backfill length, full-width transverse placing, whether fill under the approach slab belongs, plus fill material, compaction requirements, measurement by volume and quota application
Abutment backfill is the filling of the gap between the rear face of the abutment stem (back wall) and the original ground/subgrade, including the areas behind the wing walls, the backfill under the approach slab and the abutment drainage layer; it excludes pile-cap excavation backfill and conical-slope surface protection. The longitudinal length follows CJJ 2-2008 clause 11.5.7 item 3: not less than the abutment height plus 2m at the top of the stem and not less than 2m at the bottom, and for arch bridges not less than 3 to 4 times the abutment height (the design governs where specified); transversely it is placed to the full designed width in one operation, simultaneously with the conical slopes. Backfilling may start only when the abutment/retaining-wall concrete has reached 75% of the design strength, and the degree of compaction of the transition zone behind the abutment must exceed 96%. The backfill is measured by volume (m3) and priced by quota line item according to fill class; the approach slab itself is a separate line item.
- ←
Measuring and pricing drainage (discharge) pipes: fixing the measurement basis and quota items by scenario - roofs, urban rail transit, municipal bridges and culverts, railway bridge decks
Drainage pipe measurement splits by scenario: pipe bodies (downpipes / drainage pipes / the discharge pipes themselves) by drawn length in m (extended metres), and finished parts - discharge outlets, rainwater heads, hoppers, drain inlets - by count (per set / per piece). Building roofs follow DB11/T 2382-2024 Articles 4.10.21 to 4.10.23 (downpipes by length; hoppers, bends and drain inlets by count; roof drain (drip) pipes and vent pipes by count); urban rail follows Article 10.1.90 of the same standard (discharge pipes by length); municipal bridges follow SJG 181.2-2024 Article 7.2.4 (drainage pipes and weep holes by length in metres); railway bridge-deck drainage quotas count per 10 extended metres. The same member carries different units across industry quotas - apply the volume the project executes.
- ←
The per-set (per-group) measurement of sanitary ware: what water and drainage fittings a set contains, how twin (double-basin) wash basins count, and whether fixture-matched fittings charge separately
GB/T 50856-2024 Table K.3.1 sanitary ware (code 031003) counts per set on the drawn quantity; one set = the fixture + the full water supply fittings (taps, flexible hoses, valves, flush pipes, sprays) + the full drainage fittings (traps, waste plugs, drain inlets) + the fixture's connecting pipes; non-independently installed fittings already sit in the fixture's work content and are not re-listed. The standards set no twin wording for double basins - deriving from one set = one basin position: two basins each independently supplied and drained count 2 sets; a one-piece twin sharing one supply and drain counts 1. Fitting installation costs are inside the fixture items and not re-charged, materials priced separately as unset main materials; only independently installed taps, floor drains and floor cleanouts itemise and measure alone.
- ←
Pricing basis and settlement recognition rules for the over-concreting (additional pour) length of bored piles (comparison of values across quota and consumption standards)
Priced quantity of bored pile concrete = design pile cross-sectional area x [design pile length (including pile tip) + over-pour (additional pour) length]; where the design specifies the over-pour length, follow the design; only where the design is silent does the quota default apply - 0.50 m in the railway buildings volume and Shenzhen SJG 111.1-2022; Hunan 2025 uses 0.80 m for underwater (tremie) concrete piles and 0.50 m for non-underwater piles; Shaanxi uses 1 m for rotary-drilled, rotary-excavated, percussion, percussion-drilled and enlarged-hole piles and 0.5 m for tube-driven and screw piles; the railway bridges and culverts volume uses design pile length + 1 m, with no allowance for hole enlargement and no over-consumption coefficient applied. The over-poured portion must be cropped off: pile head cropping (cut-off) is a separate line item measured in volume as over-pour length x design cross-sectional area of the pile shaft; at settlement the over-consumption coefficient adjusts the material content against the piling records, while labour and plant are not adjusted.
- ←
Quantity basis for cost estimation when BOQ quantities are overstated: costs follow actual quantities (taken off from the drawings) rather than BOQ quantities, and the effect of overstated BOQ quantities on the contract price (re-measurement and adjustment under re-measurable contracts / no adjustment under lump-sum contracts)
Cost estimation must be based on actual quantities (the drawing-based quantities calculated from the dimensions shown on the design drawings under the measurement rules agreed in the contract), not on the bill of quantities (BOQ) quantities - BOQ quantities are provisional (estimated) figures on the revenue/tendering basis, whereas cost follows actual resource consumption; the two sets of accounts must be kept separately, with the difference carried as a separate quantity variance. This rests on Article 17 of the Cost Management Regulations for State-Owned Enterprises (Guo Fa [1984] No. 34) - costs must be accounted for from actual consumption and actual prices, and enterprises must not substitute planned cost, estimated cost or norm-based cost for actual cost - and on Article 4.1.5 of GB/T 50500-2024, under which quantities of work-item BOQ entries under a re-measurable (unit-rate) contract are provisional quantities to be determined by re-measurement. The effect of overstated BOQ quantities on revenue depends on the contract type: under a re-measurable (unit-rate) contract the works are re-measured against the actual construction drawings, so the inflated portion earns no payment (it is an error in the BOQ, rectified and repriced under Articles 7.2.1 and 8.2.1, with 15% as the threshold); under a lump-sum contract the work-item BOQ need not be re-measured and BOQ errors are not adjusted (Articles 7.2.2, 4.1.6 and 8.2.3), so an overstated BOQ quantity against less work actually done yields a quantity variance gain. The only opening is BOQ entries whose item description states a provisional quantity: under both contract types they are re-measured and adjusted under the re-measurable-contract rules.
- ←
Cost expert assessment of quantity disputes under unit-rate contracts: the stepped determination where design drawings are missing or cannot show the quantities, and the handling of missing construction or as-built drawings
With design drawings, the assessor re-computes the quantities on the drawings both parties accept and the matching measurement rules as the assessment quantities - and must re-compute the quantities actually built on the FINAL construction drawings (not the as-built drawings) (T/ZBD 100.4-2023 clause 4.3.5); without drawings, or where the drawings cannot show the disputed quantities, five descending steps apply - valid joint certification, one-party certification, re-check or site inspection, inspection-based measuring, un-assessable (not measured) (clause 4.3.6); where construction or as-built drawings are missing - the subject existing, propose that the client arrange a site inspection to measure; concealed, assess by professional analysis; lost, propose the client fix who bears the adverse consequences (GB/T 51262-2017 clause 5.4.1).
- ←
When site levelling may be charged as a bill / quota item: in-place grading within plus/minus 300 mm qualifies; vertical-layout excavation (earth or rock) is excluded and measures as general earthworks
Site levelling is an "area-basis yard grading" item, not an earthwork: defined as the in-place cut, fill, haul and grading within plus/minus 300 mm of the building's site level before foundation earthworks (GB/T 50854-2024 clause A.4.12), measured on the building's first-floor floor area at design-shown dimensions, the area of basement structure projecting beyond the first floor merging in (table A.3.1, code 010103). Within plus/minus 30 cm, list as site levelling; vertical-layout excavation (or hillside cutting) beyond plus/minus 30 cm lists as excavation; rock likewise - vertical rock cuts or hillside hewing over 300 mm execute as general rock excavation - plus/minus 300 mm is the mutually exclusive line between "site levelling" and "general earth (rock) works"; one section takes one only.
- ←
Measurement caliber for municipal drainage pipes and rainwater-inlet connectors: by design centerline length without deducting manholes and inlets (Beijing/national), versus regional manhole-deducting calibers
Beijing DB11/T 2382-2024 matches GB/T 50857-2024: drainage pipes (including inlet connectors) are computed by design centerline length, without deducting manholes, inlets, and other auxiliary structures — there is no "center or edge" datum question; some cities (e.g., Shenzhen SJG 181.4-2024 Clause 1.2.3) deduct each manhole's length from center-to-center lengths — a regional difference; confirm local rules before cross-region compilation.
- ←
Priority order when methods of measurement of different disciplines/versions conflict: contractual agreement -> national standard for measurement of the works matching the contract category -> industry/local standard -> fallback chain for version disputes
On conflict, determine the applicable methods of measurement by the order 'contractual agreement (including version) -> current national standard for measurement of the works consistent with the contract category -> industry/local standard' (GB/T 51262-2017 Clause 5.5.1, T/ZBD 100.4-2023 Clause 4.3.1); with multiple disciplines coexisting, attribute each billed (BOQ) item by the first two digits of its item code (01 building construction and decoration ... 09 blasting), and once attributed, measurement must follow that standard's appendix rules (GB 50861-2013 Clause 4.2.5, mandatory provision of codes) with no cross-discipline mixing; where no version is agreed, follow the method of measurement explicit in the document prevailing under the contract interpretation order -> re-measurable (unit-rate) contracts fall back on the tender bill of quantities (BOQ) and the method of measurement used for the tender price ceiling, and lump-sum contracts on the method of measurement used in the tender price, and if still undeterminable the appraiser measures by professional judgment with explanation (T/ZBD 100.4-2023 Clause 4.3.2).
- ←
Waterproofing quantity calculation rules: part-by-part measurement and deduction/merge rules for foundation base slabs, floors, walls, and roofs
Waterproofing (membrane/coating/rigid) quantities are calculated by area (sqm) per design-drawn dimensions, with part-specific deductions/merges: base slabs do not deduct pile heads; side faces and top surfaces merge into the foundation; retaining walls above the raft are treated as wall waterproofing; floors/roofs do not deduct holes <= 0.3 sqm, upturns <= 300 mm merge into the plane, > 300 mm are listed as wall/vertical waterproofing; walls deduct holes > 0.3 sqm, and the side faces of attached columns and pilasters merge; division joints by length (m); pile-head waterproofing by piece for pile diameter <= 500 mm, by developed area for > 500 mm; anchor heads by piece.
- ←
Quantity calculation rules for roofing and waterproofing works: tiled roofs by sloped area, waterproofing upturns merged, drainage components by length/count (Beijing DB11/T 2382-2024 Clauses 4.10.19 to 4.10.28 + GB/T 50854-2024 Appendix J)
Tiled and profiled-sheet roofs are measured by the sloped area of the design dimensions, without deducting roof chimneys, vent-cowl bases, flues, small dormer windows and valley gutters (the dormer-window overhang is not added); sloped-roof waterproofing by the sloped area and flat roofs (including slope-forming) by horizontal projection; the upturned parts at parapets, expansion joints and skylights, and the developed areas of valley gutters, eaves gutters, overhanging eaves and canopies, are merged into the roof quantity; downpipes by length, and hoppers, drainage outlets, vent cowls etc. by count; floor waterproofing with upturns not exceeding 300 mm merged into the floor quantity, above 300 mm executed as wall waterproofing; movement joints, joint sealing and waterstops by length, pile heads by count, protective layers by area.
- ←
Quantity take-off for curb backrests (concrete support behind curbs) and pricing by applying quota line items under Beijing DB11/T 2382-2024 (sub-items D2-3-44, D2-5-1, E-3-75)
Curb backrests (back-support concrete) are measured separately in m3 per the design dimensions (section area x length), listed apart from curb setting (measured in m); under Beijing DB11/T 2382-2024 municipal works apply D2-3-44 concrete support behind curbs (per m3: composite labor class II 0.9480 workdays, ready-mixed pea-gravel concrete C20 1.0100 m3, 4 t water truck 0.0615 shifts); landscape projects apply E-3-75 (identical consumptions), with formwork under D2-5-1 formwork curb (m2); note D2-3-43 "cast-in-place concrete curb" (C30) is the curb-body sub-item, not the backrest.
- ←
Pricing steel ladders and the built-in ladders (steps) of inspection chambers: quantities by mass at design-shown dimensions, quota item attribution, and the "already inside the chamber item, not charged again" test
Steel ladders are measured by mass (t) at design-shown dimensions, without deducting holes and without adding welding rods, rivets or bolts (DB11/T 2382-2024 clause 4.7.17 item 1; municipal networks clause 7.4.17); steel ladders execute as "stepped steel ladders", embedded or welded-to-insert rolled-angle treads may execute as sundry steel members (clause 4.7.10). The steps / ladders inside inspection chambers are mostly already in the standard-chamber items' work content (e.g. D4-6-178 "chamber step and cover installation"; railway LY-441 "rung installation") and may not be listed again; where a separate item is truly needed, count in kg by design-shown weight (SJG 111.2-2022 clause 3.2.4); finished steps count by design-shown number (DB11/T 2382-2024 clause 9.3.5 item 6). Standard-chamber ladders are compiled in plastic-steel - differing designs convert the ladder material only, all else unchanged (SJG 181.4-2024 clause 3.1.3).
- ←
Deciding deductions for reserved bolt holes under the two measurement bases of concrete and formwork (including raft / foundation member classification, the 0.30 m2 hole threshold, and the equipment-foundation pocket exception)
Reserved bolt holes in cast-in-place reinforced concrete members are generally deducted under neither basis: concrete per "no deduction for the volume of rebar, bolts, embedded parts or ducts within the member" (GB/T 50854-2024 Annex E E.7.1); formwork per "holes of individual area 0.30 m2 or less in walls and slabs are not deducted, and the formwork to the hole reveals is not added". Reserved bolt hole diameters usually sit far below 0.30 m2, so nothing is deducted. Exceptions: where the individual hole area exceeds 0.30 m2, concrete (on the slab / wall basis) deducts the hole volume and formwork deducts the hole area while adding the reveal formwork; the reserved pockets of equipment foundations (railway and like systems) are deducted in volume.
- ←
Classifying earthworks: separate earthworks (010101) versus foundation earthworks (010102) split by the "preset level", and how large-area replacement fill is classified (GB/T 50854-2024 Annexes A / B)
The single dividing line of earthworks classes is the "preset level" (design outdoor level / soffit level of the external ground build-up / level nominated by the client), regardless of how large the replacement area is: above the line, separate earthworks (010101) bringing the site to the preset level; below the line, foundation earthworks (010102) executed for the foundations. Large-area replacement fill sorts three ways: site-fill type - separate earthworks backfill (010101003, by volume on the cut-and-fill dimensions between the original ground and the preset level, table A.1.1); replacement cushions at or within pits for ground improvement - Annex B ground treatment (010201001, by volume at design-shown dimensions); if counted merely as earthworks, foundation earthworks; site levelling within plus/minus 300 mm of the level - by area.
- ←
Measurement of metal-surface rust removal (and painting, anti-corrosion): routed by object - plant and piping by area m2, metal structures by theoretical mass t/kg - with the companion rule of matching the unit of the quota item applied
Rust-removal quantities route by the OBJECT treated, not an either-or: plant and piping rust removal is computed by area (m2) on the design-shown surface, metal-structure rust removal by the theoretical mass of the structure (DB11/T 2382-2024 clauses 6.12.8, 6.12.9), and the outcome must match the unit of the quota item applied. Within metal structures a further split applies: general steelwork (hangers, supports, brackets, ladders, railings, platforms) and pipe-rack steelwork measure in kg; steelwork of sections over 300 mm and H sections over 300 mm measure by developed area in m2 (GB/T 50856-2024 Annex M table M.1.1 note 8); pipe surface S = pi x D x L, with fittings, valves, flanges, manholes and nozzle irregularities comprehended and not added. The municipal basis agrees (DB11/T 2382-2024 clause 7.4.51: pipe rust removal and painting on pipe surface area; steelwork rust removal and metal-structure painting on theoretical mass).
- ←
Beijing DB11/T 2382-2024 consumption standard: quantity rules for cast-in-place concrete columns and the setting of column heights (including constructional columns, corbels, concrete-filled steel tube columns, raking columns and core columns)
Per DB11/T 2382-2024 Construction Works Consumption Quota Standard, clause 4.6.6 item 3: cast-in-place concrete columns are computed by volume (m3) at design-shown dimensions, without deducting the volume of rebar and embedded parts. Column heights - beam-and-slab columns from the column base top (or slab top) to the next floor slab top; flat-slab (beamless) columns to the column capital soffit; frame columns from base top to column top; constructional columns from the top of their rooting member to the soffit of their anchoring member, with the wall-toothing part merged into the column body. Corbels attached to columns merge into the column volume; concrete-filled steel tube columns are computed on the internal section area of the tube times the design-shown tube height; raking columns on the column section area times the design-shown inclined centreline length; core columns on the hole section area times the design-shown height.
- ←
Overview of quantity take-off for construction works: basis, general rules and per-trade calculation methods
Quantity take-off rests on the four-tier basis "contract agreement -> design drawings -> approved project execution plan (construction methodology and site organization) -> appendix rules of the quota norms/measurement standards"; except where rules provide otherwise, all quantities are computed from the dimensions shown on the design drawings. General rules include: calculation per appendix rules (mandatory provisions of codes); the no-deduction threshold of single holes <=0.3 m2; significant figures of units of measurement (t/km three decimals; m/m2/m3/kg two; counts integer); and dual-track BOQ vs quota-norm quantities. Earthwork, concrete, reinforcement, formwork, masonry, waterproofing, finishes etc. each have standard algorithms.
- ←
Quantity calculation for lightning-protection grounding devices and determination of the number of "groups": grounding electrodes counted by "piece", commissioning of independent grounding devices (up to 6 electrodes) counted by "group", grounding-grid testing counted by "system"
Fabrication and installation of grounding electrodes is counted by "piece" (2.5 m per electrode where the design does not specify); "group" appears only in electrical adjustment and testing: commissioning of an independent grounding device is counted by "group" (applicable ceiling of up to 6 grounding electrodes), and grounding-grid testing by "system". One independent grounding device = 1 group; the number of groups follows the number of "locations", not "total electrodes / 6"; where there are more than 6 electrodes or a grid has formed, count by "system" instead, and electrodes within the grid may not be counted again for testing.
- ←
Prestressed rebar (wire strand) quantity calculation: pre-tensioning vs post-tensioning calibers, curved segments by true length not projection, anchorage adjustments, and railway/highway/municipal differences
Prestressed rebar mass = design length x theoretical unit mass (t): pre-tensioning by member-dimension length; post-tensioning by design duct length adjusted per anchorage type (screw anchors -0.35m; bearing-plate bars +0.15/+0.30m; self-anchoring +0.35m; conical and JM/XM/OVM/QM anchors <=20m +1.0m, >20m +1.8m); curved segments by true arc length, not projection; field cutting length generally does not enter quantities (railway uses design cutting length; highway estimate caliber includes working lengths) — apply each sector's caliber separately.
- ←
Determining the drawing basis for the final account: as-built drawings govern (as-built drawings + variation/site instruction records jointly verify the work actually completed), with construction drawings serving as the benchmark for contract-scope definition and variation-difference comparison
The final account is based on the as-built drawings — more fully stated: the qualified work actually completed is verified by 'as-built drawings + design changes, variations, site instructions / variation records and other variation documents'. GB/T 50326-2017 Clause 18.3.3 lists 'as-built drawings and variation documents' as bases for the final account without separately listing construction drawings; JGJ/T 185-2009 Clause 4.2.4 provides that absent changes, construction drawings stamped as as-built become the as-built drawings (the two being equivalent), and where changes exist, the changed content must be redrawn into the as-built drawings; the construction (contract) drawings recede in the final account to the benchmark defining the contract scope and comparing variation differences (GB/T 50500-2024 Clause 7.4.1).
- ←
Railway 2024 budget quota: item application and quantity rules for driven cast-in-place pile follower (送桩) and splicing of precast piles (TB/T 10823-2024 bridge/culvert volume vs TB/T 10831-2024 housing volume)
In the railway 2024 quotas, whether pile followers (sending piles below grade) and pile splices get their own items differs by volume: (1) In the bridge/culvert volume (TB/T 10823-2024 Volume 2), the pipe-pile sinking items' work content already includes "splice/disconnect and follower driving" — neither follower nor splice books a separate item; square-pile driving items include splicing and follower work, but square-pile joints must be listed separately by count (QY-245 sulphur mastic / QY-246 flange, unit 10 joints). (2) In the housing volume (TB/T 10831-2024 Volume 10), the follower books FY-141 square-pile follower / FY-142 pipe-pile follower (unit 10 m3), and splicing books arc-welding splice items (FY-138/139 square piles, FY-140 pipe piles, unit 10). Follower length runs from the design pile-top elevation to the natural ground level before driving plus 0.50 m; welded splices are counted by the number of pile-head splices required by the design.
- ←
Bases for determining final account quantities: completed qualifying quantities + measurement certification and sign-off lock-in + measurement method by contract type
The final account quantity (in FIDIC contexts, the Final Statement plus discharge) = the qualifying quantities actually completed by the contractor in accordance with the contract and to be measured, calculated under the contract-agreed national and industry quantity take-off (measurement) standards and supplementary calculation rules; the measurement results certified and signed off by both parties (including documents for interim settlement by construction stage (China's 2020 node-based interim settlement system; no exact international equivalent)) serve as the basis for settlement (GB/T 50500-2024 Clauses 7.1.1, 7.1.8, 10.3.1). Lump-sum contracts adjust only the agreed adjustable contents; re-measurable (unit-rate) contracts measure actual completed quantities; cost-plus contracts calculate cost, fee, and taxes per the agreed method; as-built drawings, changes, site instructions/variation records, and concealed-acceptance records form the chain of evidence for 'actual completion'.
- ←
Rebar quantity calculation: length x theoretical weight, lap/merge/deduction rules, and post-tensioning length adjustments
Rebar quantity = design-drawn rebar length (centerline length) x unit theoretical weight (t). The BOQ caliber counts only laps specified by design and codes, not construction laps; the quota caliber, where drawings/codes do not specify, counts one lap per 12 m for diameters up to 10 mm and per 9 m above 10 mm, with mechanical connections not counted separately. Post-tensioned prestressed rebar lengths are adjusted by reserved duct length and anchorage type. Embedded iron parts are measured by ton, rebar splices by number, post-installed rebar by piece.
- ←
Stepping stones (tingbu): term definition, quantity-calculation method, and quality-control parameters
Stepping stones are water-crossing steps set at intervals and slightly exposed above the water surface in landscape waterscapes/garden paths (CJJ/T 91-2017 Clause 6.4.3; GB 50420-2007 Clause 2.0.11). Quantity takeoff: dry stepping stones by paved area in sqm under block-facing quota items (Beijing DB11/T 2382-2024 Appendix E: E-3-52 granite / E-3-53 bluestone), count ~= total length / (single-stone length along travel direction + spacing); in-water stepping stones by volume in m³ under installation items. Quality parameters: single-stone area 0.25-0.35 sqm, spacing 30-40 cm, adjacent height difference <= 2.5 cm, top surface >= 15 cm above the highest water level, concrete cushion > C15 and thicker than 100 mm.
- ←
Measurement caliber for drainage pipes and rainwater-inlet connectors: computed by design centerline length (to centers, no deduction of auxiliary structures), contrasted with "manhole-deducting" local calibers and with workmanship provisions
Under the current national standard (GB/T 50857-2024) and Beijing (DB11/T 2382-2024), drainage pipes and inlet connectors are computed by design centerline length, without deducting the lengths occupied by rainwater inlets, manholes, and other auxiliary structures — measured to centers; there is no "measure to inner face (edge) then deduct" method; only under "manhole-deducting" calibers such as Shenzhen SJG 181.4-2024 is the length "manhole-center to manhole-center minus the per-manhole tabulated deduction", and even there the datum is center-to-center with tabulated values, not edge measurement. The workmanship rule "pipe end flush with inlet inner wall" is an installation requirement, not a takeoff datum.
- ←
Whether pipe-trench backfill quantities deduct the pipe volume: the 500 mm diameter demarcation rule and comparison of standards' calibers
Whether trench backfill deducts the pipe volume is demarcated at (nominal) diameter / pipe structural width 500 mm in most systems: <=500 mm no deduction; >500 mm deduct per the quota appendix table (m3/m) or the actual volume of pipe and base/cushion, with some systems (Shenzhen) also including chambers and other auxiliary structures; Hunan 2025 requires deducting the full pipe volume when backfilled with purchased sand/gravel; Beijing DB11/T 2382-2024 municipal/landscape caliber is "minus pipes and structures" with no 500 mm exemption. The text of the standard volume adopted governs.
- ←
Current building-area calculation rules: GB 55031-2022 Section 3.1 (mandatory) vs GB/T 50353-2013, and debunking "50353-2023"
GB/T 50353-2023 does not exist; the current recommended code remains GB/T 50353-2013; what changed area rules from 2023-03-01 is the fully mandatory code GB 55031-2022 "General code for civil buildings", Section 3.1, which prevails on conflict. Key changes: the calculation datum became the outer face of the exterior envelope (including insulation and finish layers); the four-category space principle; balconies uniformly at 1/2 of the envelope of the guarding facilities (enclosed ones counting full area); new above/below-ground division and definitions of usable area of functional spaces; non-countable items consolidated into 6 classes.
- ←
Why post-cast strip quantity takeoff deducts wall thickness: member-by-member assignment and interface division rules
Where a post-cast strip passes through walls, beams, and slabs, quota items must be applied by member category (e.g., Beijing DB11/T 2382-2024 Table A.5.1-9 splits four items: base slab / beam / floor slab / wall); the length of post-cast strips in slabs, beams, and other horizontal members is measured only to the wall face — hence the centerline length deducts the wall thickness; the wall-thickness segment is charged separately under the "wall post-cast strip" item, avoiding duplicate measurement and misapplied items. Same origin as the member-interface rules of Clause 4.6.6: "beams measured to the wall side face; flat slabs by the clear area between main walls".
- ←
Full process of construction payment: advance payment, safety-measures fee, progress payment, interim settlement by construction stage, final account, retention money and final settlement (GB/T 50500-2024 Chapters 9-10)
Payment along the timeline in six segments: advance payment (for works with contractor-procured materials, neither below 10% nor above 30% of the contract price after deducting provisional sums etc., prepaid before commencement, recovered as agreed) → statutory safety provisions (at least 50% prepaid within 28 days after commencement; not deducted from progress payments, recovered once at the final account) → progress payments (amount due = cumulative completed − cumulative paid − deductions; not less than 80% of the cumulative completed value where the contract is silent) → interim settlement by construction stage (new in 2024: signed stage settlements enter the final account without re-pricing; stage payments not below 80%) → final account (thirteen heads; failure to check or to certify in time is deemed acceptance) → retention money (3% cap) and final closure (defects liability period generally 1 year, 2 at most). The chain runs on contract-agreed time limits with a 28-day backstop; judicial enforcement of "accepted at the submitted price" requires an express contractual provision.
- ←
Quantity-calculation caliber for aluminum (metal) panel curtain walls: computed by the design outer surface / frame-perimeter area, not by the developed fabrication area of the aluminum sheet; projected area is the unitized-curtain-wall caliber, and developed area applies only to rib-stiffened full-glass walls (BOQ and quota calibers compared)
Component-type metal-panel (aluminum) curtain walls are computed by the design-shown outer surface area (for vertical planes, the frame-perimeter area), not by the developed fabrication area of the aluminum sheet; unitized curtain walls by the design frame-perimeter projected area; developed area applies only to rib-stiffened full-glass walls (TB/T 10831-2024 Vol. 10 notes). The folding allowance of aluminum panels is considered in material price/loss, not added to area (Jiangsu 2026 sub-item note); special-shape (curved/faceted/respirating) walls adjust labor consumption rather than recomputing developed area (DB11/T 2382-2024 Clause 4.13.14). The BOQ (GB/T 50854-2024 Table M.6.1) and quota (e.g., DB11/T 2382-2024 Clause 4.13.26) calibers are computed separately and must not be mixed.
- ←
Brick permanent formwork (brick mold / brick side form): quantity calculation and pricing calibers — by volume, priced under brick-foundation items, plastering separate, with regional preliminaries differences
Brick formwork quantities are computed by design-shown volume (m3): centerline length around the wrapped member x masonry height x design thickness, with brick-foundation rules (no deduction of spread-footing T-joint overlaps or single holes <= 0.30 m2). The mainstream pricing applies the "brick foundation" item — expressly in railway TB/T 10831-2024, Shenzhen SJG 111.2-2022, and Shaanxi's new draft; inner-face plastering prices separately under interior general plaster (Shenzhen: labor x 0.90); positions with brick formwork take no concrete side formwork. Regional difference: Shenzhen's building system lists brick formwork and its plastering under measures — concrete/reinforced formwork (SJG 77-2020, 5.5.3).
- ←
Rock blasting quantity take-off: by pre-blasting natural in-situ (undisturbed) volume (bank measure), and itemization linkage with GB/T 50854-2024 earthworks
Rock blasting BOQ quantities are measured in bank measure (pre-blasting natural in-situ (undisturbed) volume), not loose volume; rock that is not naturally dense converts per GB/T 50862-2024 Table A.5.3 (rock loose 1.54, block stone 1.75, sand-stone mix 1.07). Blasted rock in building BOQs is itemized per GB/T 50862-2024 code 090101 series (GB/T 50854-2024 Appendix A, A.4.14), and per A.4.10 both excavation and backfill ignore densification-state conversion — loose/compacted differences are absorbed by all-in unit rates.
- ←
Quantity rules for smoke barriers (GB/T 50854-2024 Table N.3.1, m2) and compliance check of the droop depth against the smoke reservoir (GB 51251-2017)
Smoke barriers are a "other ceiling decoration" BOQ item (code 011303003), unit m2, computed by area per design dimensions: area = arrangement length x droop depth (e.g., 1.7 m x 1.3 m -> 2.21 m2; identical units accumulate by count). The droop depth shall not be less than the smoke-reservoir depth — natural smoke exhaust >= 20% of clear height and >= 500 mm; mechanical smoke exhaust >= 10% and >= 500 mm (GB 51251-2017 Clauses 4.2.2, 4.6.2).
- ←
Steel sheet pile quantities and pricing calibers: driving/extraction by design pile-length mass (t); where area applies; usage fees and guide-frame install/removal across norm systems
In the main domestic systems (municipal/building/railway/highway), driven-and-extracted (retaining) steel sheet pile quantities are computed by the mass of the design pile length (effective length) in tons, not by area; usage fee = quantity (t) x duration x unit time price, with ton-day, ton-month, and per-quarter time calibers; guide frames are installed/removed per design horizontal length in linear meters. Area applies only in three cases: area-to-mass conversion, cofferdam internal-strut conversion (railway: 870kg per 10 m2 of single-layer struts), and international measurement (RICS NRM by total surface area of pile length).
- ←
Floor quantity calculation rules: layered calibers and deduction/merge rules for cushion courses, surface courses, skirting, stairs, and steps
Floors are calculated by structural layer: cushion courses by net area between main walls x design thickness in m3; monolithic surface courses and leveling courses by net area between main walls in sqm (door openings not added); tiled surface courses by the laid area (openings merged); skirting by linear meters; stairs and steps by horizontal projected area (stair wells <= 500 mm not deducted; without landing beams, measured to the edge of the top tread plus 300 mm). BOQ items are listed per the tables of GB/T 50854-2024 Appendix L.
- ←
TB/T 10824-2024 railway tunnel excavation quota: clearance-section step selection and the pricing caliber for overbreak and reserved deformation allowance (Railway works budget quota, Volume 3: tunnel works)
The mining-method excavation quotas of TB/T 10824-2024 "Railway works budget quota, Volume 3: tunnel works" step by clearance section area (minimum clearance cross-section above rail level, taken from the design), all intervals left-closed right-open — a section exactly on a step boundary (42/76/92 m2) takes the next step up. Excavation quantities are computed per the design excavation sections of each surrounding-rock class, including design-allowed overbreak and the reserved deformation allowance (included and priced); construction error and indiscriminate overbreak beyond that envelope are not priced. The quota consumptions are compiled for smooth controlled blasting of rock and exclude design-allowed overbreak and reserved deformation.
- ←
Cable-tray support (bearing frame) quantity calculation: measured in kg, count by support/hanger spacing, unit mass by section-steel theoretical mass
Cable-tray supports are measured by design finished mass in kg and itemized separately (GB/T 50856-2024, 3.0.10; SJG 181.7-2024, SJG 111.4-2022); counts follow support spacing — 1.5-3m horizontal, <= 2m vertical, densified at bends/branches/panel entries/expansion joints (GB 50397-2007, GB 50606-2010, GB/T 51239-2017, DB11/T 1832.17/19, etc.); unit mass = sum(member net length x unit theoretical mass), unit mass (kg/m) = section area (mm2) x 0.00785; factory supports (incl. seismic) count per piece/set without mass conversion.
- ←
Site instructions and certified records overview: applicable matters and prohibited items, the five-node handling procedure, graded signing authority, the 2024 standard basis and settlement application
Certification runs a five-node closed loop: assess reasonableness beforehand and survey the original conditions → at occurrence, measure on site, keep photos, have all parties sign the original vouchers → submit the certification file within the contract-agreed time → the supervising engineer reviews, the chief supervising engineer signs, the employer approves → participate in acceptance, confirm the completed content and compute the final cost. Signature authority: written documents signed by both parties' site management within their scope of duty are valid pricing vouchers (GB/T 50500-2024 cl. 12.2.1); the supervisor certifies facts strongly but prices weakly — priced certifications need the joint sign-off of employer, contractor and supervisor (T/CAEC 006-2024 cl. 7.2.9); a one-party signature binds only the signing party. With the 2024 code dropping the site-certification clause, off-contract work flows through three channels — variation, additional works and dayworks — and dayworks certification reports not verified in time are deemed accepted (cl. 7.5.5).
- ←
GB 50205-2020 Annex J steel structure measurement: design-quantity rules (J.0.2), quantity = design quantity x wastage adjustment factor (J.0.3), and two-decimal rounding
Design quantities per GB 50205-2020 Annex J.0.2: sections/pipes/tendons by design length x unit mass per product standards; plates by area (volume) x unit mass; bolts/studs by count (sets) or converted mass (high-strength hex: 1 bolt + 1 nut + 2 washers; torshear: 1 + 1 + 1); welds by deposited metal; gusset plates by design area, irregular plates by circumscribed rectangle; bolt holes/bevels/segmental notches/beam-column gaps not deducted (equipment-pipe openings < 0.1 m2 also not). Quantity = design quantity x wastage factor (J.0.3, per table; complex structures negotiable); values to two decimals, rounded.
- ←
Appendix D “Pricing Statements” of GB/T 50500-2024: required contents of the four statement tables and dispute risks of omissions (tender price ceiling / tender (priced offer) / final account statement + method of measurement statement for the bill of quantities (BOQ))
GB/T 50500-2024 Appendix D has four statement tables: D.1.1 tender price ceiling preparation (review) statement must include project overview, scope, basis of preparation (review), special requirements (if any), and other issues to be explained; D.2.1 tender (priced offer) statement must include scope, item description (work item specification), planned duration, site conditions, project execution plan (construction methodology and site organization) features, and other issues to be explained; D.3.1 final account (interim) preparation (review) statement must include project overview, scope, basis of preparation (review), and other issues; D.4.1 statement of method of measurement for the BOQ must specify the names and numbers of the national/industry measurement standards adopted and list supplementary rules of measurement (with 4.1.3). Omitting basis details, scope delimitation, supplementary rules of measurement, and explanations of price and percentage rate determination (GB/T 51095-2015 8.2.3) are high-frequency final account dispute triggers.
- ←
Vertical transportation quantity calculation: buildings by floor area (incl. basements) x eave-height steps, structures by count/volume, rules for height-increase fees
Vertical transportation is a preliminaries (measures) item; the BOQ covers only large vertical-transport plant (tower cranes, construction hoists, material hoists etc.) — hoisting plant and manual assistance are already included in the work content of trade items and must not be double-counted. Buildings apply quota items by floor area (incl. basements) with structural type and eave-height steps; single-storey buildings with eaves <=3.6 m are excluded; structures (chimneys, water towers, silos, elevator shafts etc.) are counted per unit; foundations without basements with embedment depth >=4 m and underground water pools are measured by volume per design dimensions; the height-increase fee is computed on the floor area of the super-height portion, with eave height stepped per additional 10 m — remainders over 5 m (but under 10 m) count as 10 m, and 5 m or under is not counted.