Defining the scope of bridge abutment backfill (fill behind abutments): longitudinal backfill length, full-width transverse placing, whether fill under the approach slab belongs, plus fill material, compaction requirements, measurement by volume and quota application
Abutment backfill is the filling of the gap between the rear face of the abutment stem (back wall) and the original ground/subgrade, including the areas behind the wing walls, the backfill under the approach slab and the abutment drainage layer; it excludes pile-cap excavation backfill and conical-slope surface protection. The longitudinal length follows CJJ 2-2008 clause 11.5.7 item 3: not less than the abutment height plus 2m at the top of the stem and not less than 2m at the bottom, and for arch bridges not less than 3 to 4 times the abutment height (the design governs where specified); transversely it is placed to the full designed width in one operation, simultaneously with the conical slopes. Backfilling may start only when the abutment/retaining-wall concrete has reached 75% of the design strength, and the degree of compaction of the transition zone behind the abutment must exceed 96%. The backfill is measured by volume (m3) and priced by quota line item according to fill class; the approach slab itself is a separate line item.
Applicable Codes
- CJJ 2-2008 · Code for Construction and Quality Acceptance of Urban Bridge Works 第11.4.2、11.4.3、11.5.7条
- CJJ/T 290-2019《城市轨道交通桥梁工程施工及验收标准》第11.5.3条
- DB63/T 2052.5-2022《农村公路勘察设计规范 第5部分:桥梁涵洞》第6.5.6条
- DB11/T 1509-2018《公路工程设计导则》第8.8.2条
- DB 29-74-2018《天津市城市道路工程施工及验收标准》第5.3.8条
- DB 29-75-2018《天津市城市桥梁工程施工及验收标准》第19.7.1条
- DB14/T 1319-2021 · Specification for Standard Bills of Quantities and Measurement of Highway Works (Shanxi) 第204节 表204
- GB/T 50857-2024 · Standard for Measurement of Quantities of Municipal Works App. A Table A.3.1(040103)
- 《北京市公路城市化断面预算定额》CSLJ0403 桥涵台背回填
- 《湖南2025市政工程消耗量标准》第三章砌筑工程 说明
Positioning
Defining what "abutment backfill (fill behind the abutment)" covers in bridge works: how far the backfill extends outward from the rear face of the abutment back wall, whether the fill under the approach slab is included, what fill material is used, what degree of compaction is achieved, by what unit it is measured, and which class of quota line items applies.
Core conclusions
1. Scope Abutment backfill is the filling of the gap between the rear face of the abutment stem (back wall) and the original ground/subgrade, including the areas behind the wing walls on both sides of the stem, the backfill under the approach slab and the filling within the abutment drainage layer; it does not include backfill to the pile-cap foundation excavation (that is excavation backfill, charged separately), nor conical-slope surface protection. The conical-slope fill is placed simultaneously with the abutment backfill, but the two are generally measured as separate items.
2. Longitudinal backfill length (minimum control values of the inspection and acceptance standard; where the design specifies, the design cross-section governs) CJJ 2-2008 Code for Construction and Quality Acceptance of Urban Bridge Works, clause 11.5.7 item 3 (general item): "The length of abutment backfill shall be not less than the abutment height plus 2m at the top of the stem, and not less than 2m at the bottom; for arch bridges the length of abutment backfill shall be not less than 3 to 4 times the abutment height. Inspection frequency: full inspection. Method: observation, steel-tape measurement, checking construction records." CJJ/T 290-2019 Standard for Construction and Acceptance of Urban Rail Transit Bridges, clause 11.5.3 item 3, same basis: "The length of the transition-zone fill behind the abutment shall be not less than the abutment height plus 2m at the top, and not less than 2m at the bottom." Transversely: CJJ 2-2008 clause 11.4.2 - "Abutment backfill and conical slopes shall be backfilled simultaneously and shall be placed to the full designed width in one operation."
3. Whether the fill under the approach slab is included It is included, and it is usually one of the main components of the abutment backfill. DB63/T 2052.5-2022 (rural highway survey and design, Part 5: bridges and culverts), clause 6.5.6 item b): "On non-collapsible loess sections the fill under the approach slab should be permeable material, with a degree of compaction of not less than 96%." The approach slab length is usually the actual controlling boundary in the longitudinal direction. DB11/T 1509-2018 Highway Engineering Design Guidelines, clause 8.8.2, provides that the approach slab length follows the principle of spanning the sliding surface of the fill behind the abutment: 6m slabs are suitable where the fill height behind the abutment is under 5m, 8m slabs for 5m~8m, and 10m slabs for 8m~10m. Pricing must be split into two layers: the fill under the slab is charged under backfill line items by material and compaction; the slab itself (concrete plus rebar) is a separate approach-slab line item, and the backfill volume deducts the volume occupied by the slab concrete.
4. Fill material and compaction CJJ 2-2008 clause 11.4.3: "Abutment backfill should proceed simultaneously with subgrade filling, and mechanical rolling should be used. Within 0.8~1m behind the abutment, sand-gravel or semi-rigid material should be backfilled and compacted with small compaction equipment or by hand tamping." Tianjin DB 29-75-2018 Standard for Construction and Acceptance of Urban Bridge Works, clause 19.7.1: "The material for fill behind abutments should be mainly permeable material as required by the design. Where permeable material is insufficient, lime soil or cement-stabilised soil may be used. The layer thickness and degree of compaction of fill behind abutments shall comply with the design. Before abutment backfilling, ground treatment and drainage facilities shall be completed as specified in the design." Tianjin DB 29-74-2018 Standard for Construction and Acceptance of Urban Road Works, clause 5.3.8 item 2: "Behind the abutments of bridges and culverts, behind retaining walls and over pile caps within carriageways, fill with good permeability and easy compaction shall be selected. Where fine-grained soil is used, it should be treated with inorganic binders such as lime, cement or fly ash. The fill shall not contain rubble, broken bricks or hard lumps larger than 100mm." Item 5 of the same clause: "Both sides of a culvert shall be backfilled simultaneously, and the difference in fill height between the two sides shall not exceed 300mm."
5. Backfill timing and strength threshold CJJ 2-2008 clause 11.5.7, key item 1: "Backfilling may begin only when the concrete of the abutment stem and retaining walls has reached over 75% of the design strength." (full inspection; observation and checking the test reports of site-cured specimens). Item 2 of the same clause: "For arch bridges, the abutment backfill shall be completed before the arch ring carries horizontal thrust." CJJ/T 290-2019 clause 11.5.3, key items: for earthwork backfill "the concrete strength of the stem shall be not less than 80% of the design strength"; "the degree of compaction of the transition-zone fill behind the abutment shall be greater than 96%", one point checked per 50m2 of compacted layer and at least one point where the layer is under 50m2, by the sand replacement method. Cast-in-place reinforced concrete culverts: Tianjin DB 29-74-2018 clause 5.3.8 item 4 provides that backfill against the haunches may proceed after the concrete reaches 70% of the design strength, and fill above the roof slab after the design strength is reached.
6. Measurement and quota application Measured by volume (m3), not by area:
- Highway system: the Beijing Urbanised Highway Cross-Section Budget Quota, item code CSLJ0403 "abutment backfill of bridges and culverts", unit m3, classified by the placing material; DB14/T 1319-2021 Standard BOQ and Measurement Rules for Highway Works, Section 204 "embankment fill", whose work content expressly includes "abutment backfill at structures", measured under the item rules of Table 204 embankment fill.
- Municipal system: GB/T 50857-2024 Standard for Method of Measurement of Municipal Works, Appendix A Table A.3.1 sets the BOQ item "backfill and disposal of surplus material" (code 040103); backfill is measured in m3 as the backfill volume computed from the dimensions shown.
- Consumption quota basis: Hunan 2025 Municipal Works Consumption Standard, chapter 3 (masonry works), note 2 states that "abutment backfill is charged under the corresponding line items of chapter 2, road works, of this standard", i.e. it is not charged separately under bridge masonry items.
Applicable boundaries
- The abutment backfill lengths (abutment height plus 2m / 2m at the bottom / 3 to 4 times the abutment height for arch bridges) are the minimum control values of the inspection and acceptance standard and cannot replace the design; where the design cross-section or dedicated drawings specify, the design governs, and widened backfill beyond the design is generally not measured.
- Urban bridges (CJJ 2-2008: 75% concrete strength; arch bridges filled before carrying thrust) and urban rail transit bridges (CJJ/T 290-2019: concrete not less than 80%, compaction over 96%) use different bases and must not be mixed.
- Local standards and local quotas (Beijing, Tianjin, Hunan, DB14, DB63) apply only within their territory or where the contract invokes them; cross-province projects follow the current standards and quotas of the project location.
- The backfill volume excludes the approach slab concrete and rebar, conical-slope surface protection and pile-cap excavation backfill, to avoid double pricing against the approach-slab item and the excavation-backfill item.
- Fill material is controlled only by permeability, compactability and the designed degree of compaction; grading and layer thickness still follow the design documents.
Further reading
- CJJ 2-2008 clauses 11.4.2 (simultaneous backfill, one-operation placing), 11.4.3 (material and small compaction equipment), 11.5.7 (quality inspection: 75% strength, arch bridges filled first, length control).
- CJJ/T 290-2019 clause 11.5.3 (transition-zone fill: 80% strength, compaction over 96%, length control).
- DB63/T 2052.5-2022 clause 6.5.6 (approach slab and 96% compaction of the fill beneath).
- DB11/T 1509-2018 clause 8.8.2 (slab lengths 6m / 8m / 10m versus fill height behind the abutment).
- DB 29-74-2018 clause 5.3.8 and Table 5.8.1-1; DB 29-75-2018 clause 19.7.1.
- DB14/T 1319-2021 Appendix B Section 204 Table 204 embankment fill (measurement of abutment backfill at structures).
- GB/T 50857-2024 Appendix A Table A.3.1 backfill and disposal of surplus material (code 040103).
- Beijing Urbanised Highway Cross-Section Budget Quota, foreword, item code CSLJ0403 abutment backfill of bridges and culverts (m3, classified by placing material).
- Hunan 2025 Municipal Works Consumption Standard, chapter 3 masonry works, note 2 (abutment backfill charged under chapter 2 road works).
Keywords
- 台背回填
- 台后回填
- 桥头搭板
- 台背填土长度
- 桥台高度加2m
- 台后过渡段压实度96%
- 台背回填定额
- 回填方计量