Measurement split for steel members versus cladding sheets: columns, beams, roof trusses, monitor frames, wall frames and wind frames by mass (t); profiled steel floor decking and steel wall sheeting by area (m2); coatings charged separately
Steel space trusses, roof trusses / bracket trusses / lattice trusses, steel columns, steel beams, monitor frames, wall frames, wind frames and similar metal members are computed by mass (t) from the dimensions shown on the drawings - the mass of holes is not deducted, electrodes, rivets and bolts are not added; corbels, cantilever beams, gusset plates, stiffening rings, liner pipes, braking beams, stoppers and other attached members are merged in. Steel floor decking is computed by laid horizontal projected area and steel wall sheeting by hung developed area (m2), with no deduction for individual holes up to 0.30m2, and corner and edge trims add no area. Consumption of metal members excludes paint and fire-protection coatings - where required by design they are computed separately under clause 4.15 (except surfaces already coated ex-works).
Applicable Codes
- DB11/T 2382-2024 · Standard for Construction Consumption of Construction Works (Beijing) 第4.7.12~4.7.18条
- TB/T 10831-2024 · Budget Quota of Railway Engineering (Volume 10: Housing Works) 册说明 四、工程量计算规则
- GB/T 50854-2024 · Standard for measurement of building construction and fitting out works App. F 金属结构工程
Positioning
The split between "by mass in t" and "by area in m2" in steel works, and the attribution rules - no deduction for holes, attached members merged in, coatings charged separately - for quantity take-off and rate build-up of columns, beams, trusses, monitor frames, wall frames, wind frames, profiled floor decking and wall sheeting.
Core conclusions
1. The by-mass (t) class, from dimensions shown on the drawings
- Clause 4.7.12: steel space trusses are computed by mass from the design dimensions; the mass of holes is not deducted, and electrodes, rivets and bolts add no mass.
- Clause 4.7.13: steel roof trusses, bracket trusses and lattice trusses are computed by mass from the design dimensions, holes not deducted, electrodes/rivets/bolts not added; pipe trusses and prestressed-cable trusses are computed by the centre-line length shown x theoretical mass.
- Clause 4.7.14: solid-web and open-web steel columns are computed by mass, holes not deducted, electrodes/rivets/bolts not added; corbels and cantilever beams attached to a column merge into the column quantity; pipe columns likewise - gusset plates, stiffening rings, liner pipes and corbels merge in.
- Clause 4.7.15: steel beams by mass, holes not deducted; braking beams, braking plates, braking trusses and stoppers merge into the crane-beam quantity.
- Clause 4.7.17: other steel members by mass; channels attached to hoppers or gutters merge in; high-strength bolt assemblies, turnbuckles, shear studs, buckling-restrained braces (BRB), viscous dampers (VFD), tuned mass dampers (TMD) and seismic sliding bearings are counted by the number shown.
- Monitor frames, wall frames and wind frames have their own BOQ item: GB/T 50854-2024 Appendix F Table F.6.1 (code 010606). The railway building volume runs the same way: its member classification lists "wall frames, wind frames, monitor frames, light roof trusses, other members" together in class III; member mass is design dimensions x theoretical mass, holes up to 0.30m2 each not deducted, welds, rivets and bolts not added.
- Line-item shape (consumption side): DB11/T 2382-2024 Appendix A A.6.6 "other steel members", A-6-27 steel monitor frame, unit t, work content "assembly and erection, welding, preheating, post-heating, node derusting, ultrasonic examination etc."; the member itself enters as a finished/semi-finished material at 1.0000t, plus all-in labour category I 4.8160 workdays, electrodes 2.6400kg, AC welder 32kV.A 0.2244 machine-shifts, other materials 0.5% and other plant 2.0%. Such items are "member erection" items - the member body is priced as a finished material.
2. The by-area (m2) class
- Clause 4.7.16: steel floor decking is computed by laid horizontal projected area from the design dimensions, with no deduction for columns, piers and holes each up to 0.30m2; steel wall sheeting is computed by hung developed area, no deduction for beams and holes each up to 0.30m2, and corner boxes, edge trims and window-sill flashings add no area.
- Clause 4.7.18: metal louvre guards, proprietary fencing, metal mesh fencing and proprietary floor grating are computed by the developed area of the frame perimeter.
- Clauses 4.7.8 and 4.7.9: steel and profiled floor decking and wall sheeting are compiled comprehensively regardless of plan form; lighting sheets and bands are compiled per single sheet; rebar-truss composite decking may follow the profiled-sheet items.
3. Attribution, conversion and separate-charge boundaries
- Coatings separately (clause 4.7.11): "The construction consumption of metal members does not include paint or fire-protection coatings; where the drawings require anti-corrosion or fire protection, clauses 4.15.1~4.15.10 apply - except paint already applied to finished steel member surfaces."
- Factors by connection and form: clause 4.7.1 - where members are mainly high-strength bolted, labour x 0.75, auxiliary materials and plant x 0.50; clause 4.7.2 - shell, curved or folded space trusses: labour and plant x 1.15 (same for tube trusses with intersecting joints); clause 4.7.7 - steel members in encased composite structures follow the steel items with labour and plant x 1.05.
- Classification details: clause 4.7.4 - roof trusses of single-truss mass up to 1t with angle, round or tube bracing follow the light roof truss item, over 1t the truss item; clause 4.7.10 - steel stairs follow stair items, embedded or welded angle treads follow sundry steel members, column anchor bolts follow pre-embedded parts; clause 4.7.5 - elevated walkways between buildings may follow steel trusses.
- Section division (clause 4.7.6): H, T, L, cross and combined shapes are solid-web columns/beams; box, polygonal and latticed shapes are open-web columns/beams; circular columns are pipe columns.
Applicable boundaries
- Measurement follows the BOQ / quota rules - design dimensions x theoretical mass, not site weighbridge or actual cutting mass; no deduction for holes and no addition for welds or bolts are mandatory in the mass class.
- Only holes up to 0.30m2 each are not deducted; over 0.30m2 they are deducted per the rules (same for the area class - decking, sheeting).
- Corner boxes, edge trims and sill flashings add no area in wall sheeting; the railway basis, by contrast, bills colour-sheet trims and edge boxes separately - cross-industry use requires re-basing and no mixing.
- Member classifications differ between standards (the railway class III includes monitor frames and light roof trusses); borrowing items across volumes requires checking the classification and work content - items must not be transplanted by name.
- No prices here: all-in unit rates follow market prices of the period plus the matching fee norms.
Further reading
- GB/T 50854-2024 Appendix F Table F.6.1 (code 010606) and the other Appendix F member tables.
- DB11/T 2382-2024 clauses 4.7.1~4.7.18 (4.7.11 coatings; 4.7.12~4.7.17 measurement rules) and Appendix A A.6.6 (A-6-27).
- TB/T 10831-2024 Volume 10 volume notes: member classification table; colour sheeting and other works; quantity rules (1) fabrication, erection and transport of metal members.
Keywords
- 金属结构工程
- 计量口径
- quantity take-off (measurement)
- 不扣除孔眼
- 钢板楼板
- 钢墙板
- 并入工程量
- 剪力栓钉
- TB/T 10831-2024