Stepping stones (tingbu): term definition, quantity-calculation method, and quality-control parameters

Stepping stones are water-crossing steps set at intervals and slightly exposed above the water surface in landscape waterscapes/garden paths (CJJ/T 91-2017 Clause 6.4.3; GB 50420-2007 Clause 2.0.11). Quantity takeoff: dry stepping stones by paved area in sqm under block-facing quota items (Beijing DB11/T 2382-2024 Appendix E: E-3-52 granite / E-3-53 bluestone), count ~= total length / (single-stone length along travel direction + spacing); in-water stepping stones by volume in m³ under installation items. Quality parameters: single-stone area 0.25-0.35 sqm, spacing 30-40 cm, adjacent height difference <= 2.5 cm, top surface >= 15 cm above the highest water level, concrete cushion > C15 and thicker than 100 mm.

Applicable Codes

  • CJJ/T 91-2017 风景园林基本术语标准
  • GB 50420-2007 城市绿地设计规范(2016年版)
  • DB5301/T 23-2019 园林绿化工程验收规范
  • DB11/T 212-2017 园林绿化工程施工及验收规范
  • DB11/T 2382-2024 建设工程施工消耗量标准 App. E

Topic Positioning

Term definition, quantity calculation, and quality-control parameters of stepping stones, for drawing interpretation, takeoff, and acceptance of landscape waterscape/garden-path steps.

Core Conclusions

Definition: CJJ/T 91-2017 Clause 6.4.3 — "steps set at intervals and slightly exposed above the water surface"; GB 50420-2007 Clause 2.0.11 — "stones placed in water on which pedestrians may cross the river on foot". Quantity takeoff (per DB11/T 2382-2024 Appendix E): dry stepping stones by paved area in sqm under block-facing items E-3-52 (granite) / E-3-53 (bluestone); in-water stepping stones by volume in m³ under installation items. Count ~= total length / (single-stone length + spacing); area = single-stone area x count; volume = area x thickness x count. Quality parameters: single-stone area preferably 0.25-0.35 sqm, surface preferably non-slip; spacing 30-40 cm; adjacent height difference <= 2.5 cm; top surface >= 15 cm above the highest water level; concrete cushion > C15, thicker than 100 mm, extending 50-60 mm around.

Applicable Boundaries

The items follow the Beijing 2024 consumption-standard scope; other regions follow the local landscape quota, and in-water installation item numbers differ by region. Stepping stones belong to garden-path paving — do not mix them with floor block-facing items of building works.

Further Reading

CJJ/T 91-2017 Clause 6.4.3; GB 50420-2007 Clause 2.0.11; DB5301/T 23-2019 Clause 5.9.3; DB11/T 212-2017 Clause 6.1.1; DB11/T 2382-2024 Appendix E items E-3-52/E-3-53.