Railway 2024 budget quota: item application and quantity rules for driven cast-in-place pile follower (送桩) and splicing of precast piles (TB/T 10823-2024 bridge/culvert volume vs TB/T 10831-2024 housing volume)
In the railway 2024 quotas, whether pile followers (sending piles below grade) and pile splices get their own items differs by volume: (1) In the bridge/culvert volume (TB/T 10823-2024 Volume 2), the pipe-pile sinking items' work content already includes "splice/disconnect and follower driving" — neither follower nor splice books a separate item; square-pile driving items include splicing and follower work, but square-pile joints must be listed separately by count (QY-245 sulphur mastic / QY-246 flange, unit 10 joints). (2) In the housing volume (TB/T 10831-2024 Volume 10), the follower books FY-141 square-pile follower / FY-142 pipe-pile follower (unit 10 m3), and splicing books arc-welding splice items (FY-138/139 square piles, FY-140 pipe piles, unit 10). Follower length runs from the design pile-top elevation to the natural ground level before driving plus 0.50 m; welded splices are counted by the number of pile-head splices required by the design.
Applicable Codes
- TB/T 10823-2024 铁路工程预算定额 Vol. 2 桥涵工程
- TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程
- TB 10801-2024 铁路基本建设工程设计概(预)算编制办法
Topic Positioning
Under the railway 2024 budget quota system, for precast piles (reinforced-concrete square piles and pipe piles): whether "followers" (pile drivers' extension segments that drive piles below ground) and "splices" book separate quota items, and how follower length and joint counts are computed — the key point: the bridge/culvert volume and the housing volume have different calibers and must not be mixed.
Core Conclusions
1. Comparison of the two volumes' treatment (confirm which volume the works belong to before compiling)
- Bridge and culvert works volume (TB/T 10823-2024 Volume 2):
- Pipe piles (QY-251~260): neither follower nor splice books a separate item. The pipe-pile sinking items' work content, as written, includes "move piling rig within site, lift and position pile, fit/remove helmet, drive and insert, splice/disconnect, follower driving, align, redrive, fit/remove ground anchor cage, pile-head treatment" — splicing and follower work are already inside the pile sinking items; quantity is the design pile length in 100 m (vibratory sinking) or 10 m (hammer sinking). When pipe piles are spliced by sections (including splice-collar work), never book joint items additionally.
- Square piles (QY-247~250): the square-pile driving items' work content includes "driving, splicing, follower driving, pile-head treatment", so splicing and follower work are included; but square-pile joints have independent items and must be listed separately by joint count: QY-245 square-pile joint, sulphur mastic (unit 10 joints, base price 1035.11 yuan), QY-246 square-pile joint, flange (unit 10 joints, base price 4892.62 yuan).
- Housing works volume (TB/T 10831-2024 Volume 10, for station buildings and other houses):
- Follower and splice each book separate items. Follower: FY-141 square-pile follower (10 m3, base price 2269.87 yuan), FY-142 pipe-pile follower (10 m3, base price 2396.01 yuan); work content includes lifting and fitting the follower, withdrawing and lowering the follower, fitting/removing the helmet, alignment, follower driving. Splice: FY-138 square-pile welded splice with angle steel, FY-139 square-pile welded splice with steel plate, FY-140 pipe-pile welded splice, all in units of 10.
2. Quantity rules of the housing volume (volume notes, as written)
- Follower: "Follower driving in piling works is computed from the design pile-top elevation to the natural ground level before driving plus 0.50 m." I.e. follower length = (design pile-top elevation − natural ground level before driving) + 0.50 m; follower volume = follower length x pile cross-section area (square piles per the caliber of design pile length including the shoe times cross-section; the follower takes the pile shaft cross-section, in 10 m3). Where the pre-driving natural ground level differs among pile positions, compute pile by pile and sum.
- Splice: "Welded splicing of precast piles is counted by the number of pile-head splices required by the design" (unit 10).
- Adjacent easily confused rules: where the trimmed-off pile length is <=1 m, the corresponding driving quantity is not deducted; where the trimmed length >1 m, the excess is deducted from the driving quantity as incurred, but the price of the pile body is not deducted. Where the design does not fix the length of pile heads to be chipped, the head length is 40d (d = main-bar diameter of the pile shaft; where main-bar diameters differ, take the larger).
Applicable Boundaries
- Applies only to the railway 2024 budget quotas: TB/T 10823-2024 "Railway works budget quota, Volume 2: bridge and culvert works" and TB/T 10831-2024 "Railway works budget quota, Volume 10: housing works"; for follower/splice calibers of other volumes (tunnel, station yard, subgrade etc.) or other quota editions, check the respective volume notes and quantity rules — this card's conclusions must not be applied.
- The bridge-volume joint items QY-245/246 apply only to square piles (sulphur-mastic / flange joints); pipe-pile splicing work is inside the sinking items and must not be mixed.
- Base prices of housing-volume FY-141/142 and bridge-volume QY series are quota base-period prices; when compiling estimates/budgets, price differences must still be adjusted per the compilation measures (labor/materials/plant adjusted separately).
- Follower length is referenced to the "natural ground level before driving": if the pit is excavated first and piles are driven inside the pit (pile top near ground), follower computation must be checked against actual site conditions and design elevations to avoid over-counting.
Further Reading
- Bridge volume: TB/T 10823-2024 Volume 2, Chapter 1 substructure, Section 5 "reinforced-concrete square piles and pipe piles": QY-245~250 (square-pile joints, square-pile driving on land/water), QY-251~260 (pipe-pile vibratory sinking on land/water, hammer sinking on land).
- Housing volume: TB/T 10831-2024 Volume 10, volume notes items 17 and 18 (construction measurement, quantity rules (1) precast piles); Chapter 1 civil works, Section 2 "piles and foundation works": FY-138~142 (welded splices, followers).
- System background: National Railway Administration Announcement No. 28 of 2024 published TB 10801-2024 "Measures for compiling design estimates (budgets) of railway capital construction projects" and 17 other new standards, effective 1 January 2025, simultaneously abolishing TZJ 1001-2017 and 20 other old standards; follower and splice pricing must be used together with the new compilation measures.
Keywords
- 送桩
- 接桩
- 预制桩
- 打桩
- railway works budget quota manual (China Railway)
- TB/T 10823
- TB/T 10831
- method of measurement