Railway 2024 quota: which volume governs mortared-rubble retaining walls / slope protection appurtenant to buildings (Volume 10 housing works TB/T 10831-2024, not the bridge/culvert volume) and selecting items FY-381~385

Mortared-rubble retaining walls and slope protection appurtenant to buildings use Volume 10 "Housing works" TB/T 10831-2024, not the bridge/culvert volume; the same support/protection on subgrade slopes uses the LY series of Chapter 2 support structures in Volume 1 TB/T 10822-2024. Volume 10 items (unit 10 m3, base-period prices): FY-381 rubble retaining wall 3570.50 yuan; FY-382 coarse-dimension-stone retaining wall 2367.31 yuan; FY-383 fine-dimension-stone retaining wall 2380.18 yuan; FY-384 mortared rubble slope protection 3878.49 yuan; FY-385 dry rubble slope protection 1558.03 yuan. Mortar is compiled as dry-mixed masonry mortar M10.0 — adjust if the design differs; for rubble slope protection over 4 m high the quota labor x1.15; below the retaining-wall foundation trench apply the stone-foundation items, the wall body uses FY-381, and pit excavation/backfill costs are included in the main works with no separate listing.

Applicable Codes

  • TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程(Ch. 1第三节 砌筑工程 三、石砌体(三)挡土墙、护坡 FY-381~385)
  • TB/T 10822-2024 铁路工程预算定额 Vol. 1 路基工程(Ch. 2 支挡结构)
  • TB 10801-2024 铁路基本建设工程设计概(预)算编制办法(App. A 综合概(预)算章节表)

Topic Positioning

This card answers, in the railway 2024 quota system, which volume and which items govern "mortared-rubble retaining walls and slope protection appurtenant to buildings": the verdict is Volume 10 "Housing works" (TB/T 10831-2024), with selection and conversion points of items FY-381~385 under "(3) retaining walls, slope protection", preventing wrong application of the bridge/culvert volume or Volume 1 subgrade volume.

Core Conclusions

  1. Volume determination (error-prone point):
  • Retaining walls and slope protection appurtenant to buildings -> Volume 10 "Housing works" TB/T 10831-2024, "Chapter 1 civil works / Section 3 masonry works / 3. stone masonry / (3) retaining walls, slope protection", work content "mix, haul and spread mortar; haul stone; lay; cure".
  • Support and protection on section/station-yard subgrade slopes -> Volume 1 "Subgrade works" TB/T 10822-2024 "Chapter 2 support structures", which has 11 sections (anti-slide piles, gravity walls, pile-plank walls, anchored walls, reinforced-earth walls, counterfort/cantilever walls, soil nails, prestressed anchors etc.) and "the retaining-wall items also apply to protective walls".
  • The bridge/culvert volume (Volume 2 TB/T 10823-2024) is for the masonry of the bridges and culverts proper — unrelated to this topic; do not apply.
  • Compilation-measure confirmation: TB 10801-2024 "Measures for compiling design estimates (budgets) of railway capital construction projects", Appendix A chapter-table notes — earth/rock of building appurtenant works (including retaining walls, slope protection and other masonry protection) enters the relevant items of buildings and appurtenant works; "earth/rock excavation related to masonry and other works has its cost included in the main works" — e.g. a wall's pit excavation and backfill costs are included in the wall, not listed separately.
  1. Volume-10 item selection (all units 10 m3, base-period prices): | Item | Name | Base (yuan) | Labor (yuan) | Material (yuan) | Plant (yuan) | | FY-381 | stone masonry retaining wall, rubble | 3570.50 | 996.32 | 2513.50 | 60.68 | | FY-382 | stone masonry retaining wall, coarse dimension stone | 2367.31 | 1231.71 | 1117.21 | 18.39 | | FY-383 | stone masonry retaining wall, fine dimension stone | 2380.18 | 1119.76 | 1249.61 | 10.81 | | FY-384 | stone masonry rubble slope protection, mortared | 3878.49 | 1081.37 | 2730.75 | 66.37 | | FY-385 | stone masonry rubble slope protection, dry | 1558.03 | 809.14 | 748.89 | 0 | A mortared-rubble retaining wall corresponds to rubble retaining wall FY-381; mortared-rubble slope protection to FY-384; dry slope protection uses FY-385 (no mortar).

  2. Selection and conversion points (Volume 10 notes for "Section 3 masonry works"):

  • Bricks, blocks and stone are listed at standard or common sizes; masonry mortar is compiled as dry-mixed mortar (this group at dry-mixed masonry mortar M10.0); where design differs from quota, adjust by conversion — this is a conversion point, not a direct swap to a different-grade item.
  • Foundation vs wall (column) body division: same material takes the design indoor floor as boundary (for basements, the basement's design indoor floor); different materials within +/-0.30 m of the design indoor floor take the material change as boundary, beyond +/-0.30 m take the design indoor floor; fences take the design ground level.
  • Stone foundation, stone wall, stone plinth division: foundation vs plinth at the design outdoor ground level; plinth vs wall body at the design indoor floor; where the ground levels inside and outside a stone fence differ, the lower level is the boundary, and where the inside-outside difference forms a retaining wall, above the retaining wall is wall body.
  • Adjustment factors: rubble slope protection over 4 m high — quota labor x1.15; curved masonry — labor x1.10 of the corresponding quota, brick/block stone and mortar x1.03; masonry wall height is compiled at 3.60 m, the excess quantity's labor x1.3; coarse/fine dimension-stone (masonry) walls in the stone-masonry quota are compiled at 400x220x200.

Applicable Boundaries

  • Applies only to retaining walls and slope protection "appurtenant to buildings"; the same support and protection on subgrade slopes uses the LY series of Volume 1 Chapter 2 support structures — this card's items must not be mixed in.
  • Bridge/culvert masonry proper uses the bridge volume and is outside this card; special support forms — anchored walls, counterfort, cantilever, pile-plank, reinforced-earth walls, anti-slide piles, prestressed anchors etc. — are listed as independent items per the compilation measures and do not go through this card's ordinary stone-masonry items.
  • The portion below the retaining-wall foundation trench is measured separately under stone-masonry foundation items; only the wall body uses FY-381; pit excavation and backfill costs are already inside the main items and must not be double-counted.
  • The quota is compiled for straight masonry; the labor x1.10 factor applies only to curved work; dry slope protection (FY-385) has no mortar — distinguish mortared/dry per the design.

Further Reading

  • TB/T 10831-2024 "Railway works budget quota, Volume 10: housing works", Chapter 1 civil works, Section 3 masonry works: 3. stone masonry (3) retaining walls and slope protection (FY-381~385); the same section's notes "Section 3 masonry works" (foundation/wall division, conversion and factor clauses).
  • TB/T 10822-2024 "Railway works budget quota, Volume 1: subgrade works", Chapter 2 support-structure notes: 11 sections; masonry volume by solid design volume (no deduction for reinforcement, strand, embedded parts and reserved grout ducts); fill within 2 m behind walls measured as compacted volume; single-row scaffolding for slope height <=8 m with 15 deg<=slope<=30 deg, double-row for 8 m<slope height<=16 m, triple-row for slope height>16 m and slope>30 deg.
  • TB 10801-2024 "Measures for compiling design estimates (budgets) of railway capital construction projects", Appendix A comprehensive chapter-table notes: caliber for earth/rock and masonry protection of building appurtenant works; building foundation vs wall-body boundary; earth/rock related to masonry charged into the main works.