Railway building-works quota TB/T 10831-2024 earthworks: trench-pit vs general earthworks division, manual/mechanical boundary (depth >6 m mechanical), and the <=0.30 m manual bottom-cleaning included in mechanical excavation

Building pit excavation first tests "trench-pit" or "general earth-rock" per volume note 2: trench-pit means trenches with bottom width (design bedding or foundation width) <=7 m and length >3 x width, or pits with length <=3 x width and bottom area <=150 m2; beyond these, unless site grading, it is general earth-rock. Depth <=6 m: manual (FY-1~FY-12) or mechanical (FY-31~FY-42) per the actual method; depth >6 m "shall be treated as mechanical excavation". Mechanical earthwork already comprehends manual cleaning and trimming of the <=0.30 m left at base and slopes — "must not be adjusted in use"; no separate manual bottom-cleaning item.

Applicable Codes

  • TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程(册说明、Ch. 1第一节土石方工程)
  • TB/T 10823-2024 铁路工程预算定额 Vol. 2 桥涵工程(QY-1~QY-7 挖基)
  • GB 51004-2015 建筑地基基础工程施工规范 第8.1.9条

Topic Positioning

The earthworks application rules of TB/T 10831-2024 Volume 10: first test "trench-pit / general earthworks", then fix manual/mechanical items by method and depth; with mechanical excavation, the <=0.30 m manual bottom cleaning at pit base and slopes is inside the mechanical items and not separately booked; plus the volume-note adjustment factors.

Core Conclusions

  1. Trench-pit vs general division (note 2): "Trench-pit means trenches with bottom width (design bedding or foundation width, same below) <=7 m and bottom length >3 x bottom width, or pits with bottom length <=3 x bottom width and bottom area <=150 m2; beyond these ranges, unless site grading, general earth-rock." Independent column and strip footings (area <=150 m2) use trench-pit items; large rafts and basements use general earthworks items.

  2. Manual/mechanical boundary: apply per the actual method (per the project execution plan) — manual items where machines cannot work (corners, confined spots), mechanical where they can. The only hard clause (note 5.10): "The manual earthwork items for depth >2 m apply to manual excavation <=6 m; where manual depth exceeds 6 m, treat as mechanical excavation. Where isolated spots >6 m still use manual digging, for the excess each additional 1 m multiplies the corresponding quota by 1.15." That is: <=6 m manual or mechanical by fact; >6 m must be mechanical.

  3. Items (unit 100 m3): manual general excavation FY-1~FY-6, manual trench-pit excavation FY-7~FY-12 (both by soil class I-II/III/IV x depth <=2 m / >2 m); mechanical general excavation FY-31~FY-33, mechanical dig-and-load FY-34~FY-36; mechanical trench-pit excavation FY-37~FY-39, dig-and-load FY-40~FY-42; plus frozen soil (FY-13, FY-14, FY-43, FY-44), sludge and flowing sand (FY-20, FY-45~FY-47), haulage (FY-15~FY-19, FY-48~FY-52).

  4. Manual bottom cleaning with mechanical excavation (note 4, key point): "Mechanical earthwork already comprehends manual cleaning and trimming of the <=0.30 m left at base and slopes; it must not be adjusted in use." That is: (1) the mechanical items' labor includes the <=0.30 m base and slope cleaning and trimming; (2) budgets must not add manual items for bottom cleaning nor adjust the mechanical items. The same system agrees: the bridge volume's mechanical excavation (QY-1~QY-7) content likewise includes "manual digging within 0.3 m of the pit bottom and trimming of walls and bottom". Technologically, GB 51004-2015 Clause 8.1.9 requires "the 200-300 mm of soil above the pit bottom shall be trimmed and removed manually" — matching this pricing caliber: the labor is inside the mechanical items and not listed separately; if the actual reserve/cleaning exceeds 0.30 m, the quota is silent — analyze separately and obtain the employer's confirmation.

  5. Application factors (note 5 — multiply onto items, not quantities): (1) wet soil — manual digging/hauling of wet soil: labor x 1.18; mechanical: labor and plant x 1.15. Dry/wet judged by the standing groundwater level in the investigation data (above dry, below wet; with dewatering, by the post-dewatering level, dewatering cost separate); soil beyond the liquid limit and flowing is sludge; at 0 degrees C and below with ice, frozen soil (including short-term and seasonal). (2) Manual trench-pit digging inside sheeting: labor x 1.43. (3) Digging between piles — manual items labor x 1.25; mechanical items labor and plant x 1.10. (4) Local deepening below raft bedding: trench-pit rules, labor and plant x 1.25. (5) Manual vertical haulage: x 1.50 on the manual haulage items, distance = vertical. (6) Dozer pushing with average layer <=0.30 m: labor and plant x 1.25. (7) Excavation on dynamic-compacted ground: labor and plant x 1.15. (8) Lime-soil backfill around foundations (basements): "fill reinforcement" items of the pile and foundation section, labor and plant x 1.10. (9) Mats under excavators and road-laying materials for trucks: costs separate. Also: grade-losing efficiency of manual/cart/truck climbing (<=15%) is comprehended in the haulage items; dozer/loader climbing uses the slope's inclined length with Table 3 factors.

Applicable Boundaries

  • Only TB/T 10831-2024 Volume 10 (FY items); bridge pits use Volume 2 QY, subgrade earthworks Volume 1 LY — no cross-volume misuse.
  • "Mechanical earthwork includes <=0.30 m manual cleaning" applies to mechanical excavation only; pure manual items (FY-1~FY-12) follow the manual quotas and do not include it.
  • Items are compiled for dry soil; wet soil, sludge, and frozen soil judged per note 3 (standing level, liquid limit, 0 degrees C with ice).
  • Factors adjust consumptions, not quantities; "mechanical earthwork ... must not be adjusted" is prohibitive.
  • Manual digging beyond 6 m is the exception: only the excess beyond 6 m adjusts +1.15 per additional metre.

Further Reading

  • TB/T 10831-2024 Volume 10 notes (trench-pit/general division; dry-wet/sludge/frozen judgment; 0.30 m inclusion; factors; climbing Table 3).
  • Chapter 1 Section 1 earthworks: (1) manual FY-1~FY-24; (2) mechanical FY-25~FY-52.
  • Cross-volume: TB/T 10823-2024 Volume 2 QY-1~QY-7 (mechanical pit excavation with the 0.3 m manual digging).
  • Technology comparison: GB 51004-2015 "Code for construction of building foundation engineering", Clause 8.1.9 (200-300 mm manual bottom trimming).