Deciding between earthwork and rockwork quotas in excavation, and the three soil / rock classification systems with the route to quota items

The test is excavation difficulty, not the geological name: soil dug with shovels, picks and mattocks and fully loaded by machines direct takes earthwork quotas; ground needing ripping, prying, pneumatic breakers or blasting takes rockwork quotas, the line falling between hard soil (class 4) and soft rock (class 5); the class is fixed from the geological survey report against the classification table of the quota volume in use. Building and municipal works use classes 1-2 / 3 / 4 soils and extremely soft to extremely hard rock in five grades; highways use loose / ordinary / hard soil and soft / moderately hard / hard rock (mapping to the 6- and 16-grade I-XVI systems); the Protodyakonov system counts I-IV as soil and V-XVI as rock; then the item follows the method, excavation form (trench / pit / general), depth and dry / wet soil.

Applicable Codes

  • GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准(App. A Table A.4.3-1、Table A.4.3-2)
  • GB 50021-2001(2009年版)岩土工程勘察规范 第3.2.2条
  • GB 50218 工程岩体分级标准
  • DB11/T 2382-2024 建设工程施工消耗量标准 第4.2节、第7.1节
  • TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程 册说明
  • TB/T 10822-2024 铁路工程预算定额 Vol. 1 路基工程
  • JTG/T 3832-2018 公路工程预算定额 Ch. 1 路基工程 说明
  • DB63/T 2013-2022 公路养护工程预算定额 App. A
  • SJG 111.1-2022 城市地下综合管廊工程消耗量标准(Vol. 1)1.1.2

Scope of the question

Whether excavation takes earthwork or rockwork quotas turns on digging difficulty, not geological name. This card gives the test, the three classification systems (building / municipal, highway, Protodyakonov) and the route from survey data to quota items.

Core conclusions

1. The test: digging difficulty, not geological name Every quota volume gives a soil and rock classification table in its notes, grading by name plus digging method (what tools), which separates the earthwork item zone from the rockwork zone:

  • Digging with shovels, picks and mattocks, machines loading full direct - earthwork quotas;
  • Ripping, prying with crowbars, pneumatic hammers, breakers or blasting - rockwork quotas. The line falls between hard soil (class 4) and soft rock (class 5).

2. Fixing the class (survey data against the quota table)

  • GB/T 50854-2024 Appendix A (A.4.3): the soil class and rock class of item descriptions may follow Tables A.4.3-1 and A.4.3-2, adding dry / wet soil where needed; where classes cannot be fixed accurately, describe from the geological survey report.
  • SJG 111.1-2022 (1.1.2): classes are fixed by checking the survey data against the appendix Protodyakonov table.
  • DB11/T 2382-2024 (4.2.1): earth and rock works set out their items per construction method, working conditions and depth, the acceptance-standard process division and the soil and rock classes of GB 50021.

3. Building / municipal soil table (per GB 50021 definitions)

Soil class Soils Digging method
Classes 1-2 silt, sands (silty, fine, medium, coarse, gravelly), silty clay, weak-moderate saline soil, soft soil (mucky soil, peat, peaty soil), soft-plastic red clay, hydraulic fill shovel with some pick and mattock work; machines load full direct
Class 3 clay, gravelly soils (rounded and angular gravel) mixed soils, plastic and stiff-plastic red clay, strongly saline soil, plain fill, compacted fill mainly pick and mattock with some shovel; machines need partial ripping to load full, or load direct but not full
Class 4 gravelly soils (cobbles, crushed stone, boulders, block stone), stiff red clay, ultra-saline soil, miscellaneous fill all pick and mattock with some crowbar; machines need general ripping to load full
Note: soil names and meanings per GB 50021.

4. Rock grading (building / municipal) Rock grades as extremely soft, soft (soft-grade), relatively soft, relatively hard and extremely hard. Provincial tables give representative rocks and saturated uniaxial strengths: extremely soft (completely weathered rocks and semi-lithified rocks; partly hand tools, partly blasting) under 5 MPa; soft (strongly weathered hard / relatively hard rock, moderately to strongly weathered relatively soft rock, fresh to slightly weathered shale / mudstone / argillaceous siltstone; pneumatic picks and blasting) 5-15 MPa. GB 50021-2001 Article 3.2.2 grades rock masses on rock hardness, mass integrity and basic quality grade (Tables 3.2.2-1 to 3); absent saturated strengths, point-load strengths convert per GB 50218; extremely broken masses need no hardness grading.

5. Highway system (three soils + three rocks) Highway quotas classify by digging difficulty into six classes: soils loose, ordinary, hard; rocks soft, moderately hard, hard; against the 6- and 16-grade systems - loose (I-II), ordinary (III), hard (IV), soft rock (V-VI), moderately hard (VII-IX), hard (X-XVI).

6. Protodyakonov system Mining, oil and gas fields and utility tunnels classify by Protodyakonov: I-IV soil, V-XVI rock.

7. Class to item: three steps

  1. Fix the class: survey rock names / saturated uniaxial strengths against the table in the quota volume's notes (not the national standard directly);
  2. Split soil / rock: the soil zone takes earthwork items, the rock zone rockwork;
  3. Pick the item number, subdividing within earthwork or rockwork by:
    • method: manual / mechanical. Building and municipal: manual excavation consumptions measured per soil class, mechanical excavation comprehensively across classes (DB11/T 2382-2024 4.2.2);
    • form: trench, pit, general earthworks (DB11/T 2382-2024 4.2.3; TB/T 10831-2024 notes) - bottom width up to 7 m and length over 3x width a trench; length up to 3x width and bottom area up to 150 m2 a pit; beyond, general;
    • depth bands: e.g. railway buildings band manual excavation at 2 m;
    • dry / wet: the permanent water table from the survey divides dry above and wet below; where dewatered, the lowered table governs (TB/T 10831-2024);
    • rockwork consumptions measured per breakage method, including code-permitted overbreak (DB11/T 2382-2024 4.2.6).

Applicability limits

  • Systems differ by industry and region - judge by the executed volume's tables: building / municipal four soils + five rock grades; highway three + three; Protodyakonov I-XVI. No cross-industry mixing.
  • Quota classes are engineering classes by digging difficulty, not geological taxonomy; geological names (e.g. strongly weathered granite) do not equate to quota classes.
  • Absent saturated strengths, point-load conversion per GB 50218; extremely broken masses skip hardness grading.
  • Dry / wet soil, muck and frozen soil carry their own divisions and coefficients (wet-soil manual / machine factors, digging inside sheeting factors) - read the volume notes.
  • Item numbers and consumptions change with versions; execute the current one.

Further reading

  • GB/T 50854-2024 Appendix A Tables A.4.3-1 (soils) and A.4.3-2 (rocks); GB 50021-2001 (2009 edition) Article 3.2.2 Tables 3.2.2-1 to 3; DB11/T 2382-2024 Sections 4.2 and 7.1 (Table 7.1.4); TB/T 10831-2024 Volume 10 volume notes (classification table, trench / pit division, dry-wet / muck / frozen soil, coefficients); TB/T 10822-2024 Volume 1 Chapter 1 (rock items banded soft / moderately hard / hard); JTG/T 3832-2018 Chapter 1 notes (six classes against 6 / 16 grades); DB63/T 2013-2022 Appendix A Table A.1; SJG 111.1-2022 clause 1.1.2; Shaanxi new quota Chapter 1 Tables 1-1 and 1-2.