The per-set (per-group) measurement of sanitary ware: what water and drainage fittings a set contains, how twin (double-basin) wash basins count, and whether fixture-matched fittings charge separately
GB/T 50856-2024 Table K.3.1 sanitary ware (code 031003) counts per set on the drawn quantity; one set = the fixture + the full water supply fittings (taps, flexible hoses, valves, flush pipes, sprays) + the full drainage fittings (traps, waste plugs, drain inlets) + the fixture's connecting pipes; non-independently installed fittings already sit in the fixture's work content and are not re-listed. The standards set no twin wording for double basins - deriving from one set = one basin position: two basins each independently supplied and drained count 2 sets; a one-piece twin sharing one supply and drain counts 1. Fitting installation costs are inside the fixture items and not re-charged, materials priced separately as unset main materials; only independently installed taps, floor drains and floor cleanouts itemise and measure alone.
Applicable Codes
- GB/T 50856-2024 通用安装工程工程量计算标准 App. K Table K.3.1(卫生器具,code 031003)
- DB11/T 2382-2024 建设工程施工消耗量标准 第6.10节 卫生器具(6.10.61~6.10.70)
- DB11/T 638-2016 房屋修缮工程工程量计算规范 App. C Table C.7.3(code 930703)
- TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程 Ch. 1Ch. 3第一节 九、卫生器具安装(FY-2358~FY-2362)
Scope of the question
The per-set measurement of water and drainage sanitary ware (wash basins, bidets, showers etc.): why the unit is the set, what a set contains, how twin (double-basin) wash basins count, and whether the matched taps, angle valves, flexible hoses, traps and waste plugs are already inside the BOQ / quota items or charge separately.
Core conclusions
1. The standard definition of a set
National BOQ basis: GB/T 50856-2024 Appendix K (water supply, drainage, heating and gas) - sanitary ware items, descriptions, units and rules per Table K.3.1. Table K.3.1 sanitary ware (code 031003) counts per set on the drawn quantity (hand dryers and a few items per piece). What a set contains - Table K.3.1 notes, source:
- All sanitary ware work content includes the water fittings - taps, flexible metal hoses, valves, flush pipes, sprays - and the drainage fittings - traps, waste plugs, drain inlets - plus the fixture's connecting pipes.
- Water and drainage fittings mean independently installed taps, floor drains and floor cleanouts; non-independent ones sit inside the related fixture's or equipment's work content.
- Wash basin types include washing, hair-wash and hand basins. Other notes: installation forms - floor-standing, wall-hung, pedestal, counter-top, under-counter, embedded; assemblies - cold, mixed, manual, pedal; grease separators - floor or suspended; functional-tub wiring and commissioning itemise under Appendix D electrical works. Repair-code corroboration: DB11/T 638-2016 Appendix C Table C.7.3 (code 930703) note: fitting installation in finished-fixture items chiefly means water fittings (taps, valves, sprays) and drainage fittings (traps, waste plugs, drain inlets and the connecting pipes). Quota corroboration - a set = 1 basin + 1 set of fittings: Beijing DB11/T 2382-2024 basin item C10-6-5 (Table C.10.43 bidet installation), unit per set, containing per set: basin 1.0100, bracket with anchors 1.0100 sets, ceramic-seal tap 15 1.0100, angle valve 1.0100 sets, flexible hose 15 (L=500) 1.0100 sets, waste plug 1.0050, class-2 labour 0.2740 workdays; work content: hole making and blocking, site hauling, visual check, basin and bracket installation, fitting installation, connection to supply and drainage, water test. Railway TB/T 10831-2024 Volume 10 wash-basin installation FY-2358 to FY-2362 likewise per 10 sets, work content: pipe cutting, threading, basin, fittings and bracket installation, connection. Each set carries one basin plus one set of fittings - the benchmark for counting twin basins.
2. How twin (double-basin) wash basins count
No standard or quota carries twin wording; derive from one set = one basin position (one supply-and-drain point):
- Two basins each independently supplied (taps, angle valves, waste plugs, traps - the common twin-counter arrangement) - 2 sets: the physical count is exactly 2 fixtures + 2 sets of fittings + 2 connections, matching 2 quota sets and the drawn quantity (2 positions).
- A one-piece finished twin basin sharing one supply and drain - 1 set: the drawing shows one finished fixture; check the item's consumptions suffice, else substitute materials or compile a supplementary item. Basis: GB/T 50856-2024 Table K.3.1 counts basins per drawn quantity per set, and note 1 includes the connecting pipes and all fittings - the measured object is a basin position with a complete supply and drain, not a bare shell; Beijing DB11/T 2382-2024 Article 6.10.67 likewise counts sanitary ware per drawn quantity.
3. Are the matched taps and angle valves inside the quota?
Two layers, never one blanket yes or no:
- Installation / work content - included, never re-charged. Matched (non-independent) taps, hoses, valves, traps, waste plugs, inlets and connecting pipes sit inside the fixture installation items - no separate fitting items or installation charges. Headline: what work content includes is not charged again; what is separately itemised is not charged twice.
- Materials - usually unset (main) materials priced separately: the fixture and matched fittings price per design specification (parenthesised quota materials priced as executed, without double-charging the quota-included part).
- Only independently installed fittings itemise alone: standalone taps, floor drains, floor cleanouts. Beijing Article 6.10.69: tap and like fitting installation counts per drawn quantity by material and size.
4. Related Beijing clauses (Section 6.10 item 7)
- 6.10.61 items set per fixture type and size with the relevant codes.
- 6.10.62 fixture supply and drain branch pipes follow the pipe installation items.
- 6.10.63 pedal-switch fixtures include bends, sprays and pedal valves.
- 6.10.64 shower rooms compile on twin-pipe finished showers.
- 6.10.65 accessible-fixture grab rails follow building and decoration items.
- 6.10.66 wall-hung WCs follow concealed-cistern items.
- 6.10.68 automatic cisterns for flushing channels count per drawn quantity by volume.
- 6.10.70 flushing-channel pipes measure by drawn length.
Applicability limits
- This is the national BOQ basis (GB/T 50856-2024 Table K.3.1) plus local quota pricing; local definitions of a set may differ - follow the current local volume notes and the contract.
- The twin-basin rule derives from one set = one basin position; the standards do not say twin verbatim, and local quotas or contracts may read it differently - confirm in writing at tender stage to avoid settlement disputes.
- Installation included does not mean materials included: main materials price per design; only independent fittings itemise.
- DB11/T 2382-2024 is Beijing-only, cited for the basis; base prices move with compilation-date levels.
- No project amounts here; the conclusions are generic measurement and pricing bases.
Further reading
- GB/T 50856-2024 Appendix K Table K.3.1 (031003) and its notes 1-7; K.9.8.
- DB11/T 2382-2024 Section 6.10 item 7 (6.10.61-6.10.70); Appendix C Table C.10.43 (C10-6-5) and the fixture consumption tables.
- DB11/T 638-2016 Appendix C Table C.7.3 (930703) and note.
- TB/T 10831-2024 Volume 10 Chapter 3 Section 1 item 9 (2) wash-basin installation FY-2358 to FY-2362 (per 10 sets).