Engineering Knowledge Cards.
Confidence HighUpdated 2026-10-01

When site levelling may be charged as a bill / quota item: in-place grading within plus/minus 300 mm qualifies; vertical-layout excavation (earth or rock) is excluded and measures as general earthworks

Site levelling is an "area-basis yard grading" item, not an earthwork: defined as the in-place cut, fill, haul and grading within plus/minus 300 mm of the building's site level before foundation earthworks (GB/T 50854-2024 clause A.4.12), measured on the building's first-floor floor area at design-shown dimensions, the area of basement structure projecting beyond the first floor merging in (table A.3.1, code 010103). Within plus/minus 30 cm, list as site levelling; vertical-layout excavation (or hillside cutting) beyond plus/minus 30 cm lists as excavation; rock likewise - vertical rock cuts or hillside hewing over 300 mm execute as general rock excavation - plus/minus 300 mm is the mutually exclusive line between "site levelling" and "general earth (rock) works"; one section takes one only.

Applicable Codes

  • GB/T 50854-2024 · Standard for measurement of building construction and fitting out works App. A Table A.3.1(code 010103)、第A.4.12条
  • DB11/T 638-2016 · Code for Measurement of Quantities of Building Repair Works (Beijing) Table A.2.1 注4
  • DB11/T 2382-2024 · Standard for Construction Consumption of Construction Works (Beijing) 第4.2.7、4.2.12、4.2.13条
  • TB/T 10831-2024 · Budget Quota of Railway Engineering (Volume 10: Housing Works) 册说明(十一)1、Ch. 1第一节三、Ch. 2第二节说明二
  • GB/T 50858-2024 · Standard for Measurement of Quantities of Landscape and Greening Works App. A Table A.1.1 绿地整理
  • GB 50500-2008《建设工程工程量清单计价规范》附录A 注4(已废止,仅作沿革对照)
  • GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works (现行清单计价标准)

Topic Positioning

When "site levelling" may be charged by area in building, repair and railway house works; when it must switch to general earth (rock) excavation by volume (the "vertical layout excluded" rule); and the companion measurement and exclusivity rules.

Core Conclusions

1. Definition (the qualifying technical condition) GB/T 50854-2024 clause A.4.12, original: "site levelling means the in-place cut, fill, haul and grading within plus/minus 300 mm of the building's site level before foundation earthworks." - an AREA-basis yard-grading item, not an earthwork.

2. Item setting and measurement (GB/T 50854-2024 Annex A) Table A.3.1 "site levelling and others (code 010103)": quantities by the building's first-floor floor area at design-shown dimensions; where the basement's structural outer line projects beyond the first floor's, the projected area merges in; work content - cut, fill, haul and grade. Unit m2.

3. The exclusivity line: within plus/minus 30 cm charge levelling; vertical cuts beyond it charge excavation DB11/T 638-2016 (repair works measurement code), table A.2.1 note 4, original: "cut, fill, haul and grading within plus/minus 30 cm of the building yard list under site levelling; within plus/minus 10 cm under yard matting; vertical-layout excavation beyond plus/minus 30 cm lists under earth excavation." Historical comparison (GB 50500-2008 Annex A note 4 - withdrawn, for legacy contracts only): "cut, fill, haul and grading within plus/minus 30 cm list as site levelling; vertical-layout excavation or hillside cutting beyond plus/minus 30 cm lists as earth excavation." Rock alike - DB11/T 2382-2024 clause 4.2.7: "vertical-layout rock cuts or hillside hewing over 300 mm thick execute the general rock excavation items." Key point: plus/minus 300 mm is the mutually exclusive line between "site levelling" and "general earth (rock) works" - one section takes one basis only: charging vertical earthworks by volume bars charging levelling by area on the same section, and vice versa - one of the commonest double counts in earthworks.

4. Typical qualifying cases

  • Sites whose natural-to-design level difference falls within plus/minus 300 mm, graded in place;
  • ordinary projects without vertical-layout earthworks, on naturally even ground;
  • grading before piling and foundation works (always a separate charge - next point);
  • measured over the building's (structure's) first-floor envelope, basement projections merging in.

5. Pre-piling grading charges separately (expressly outside the quota items) TB/T 10831-2024 Volume 10, section 2 note 2, original: "this section's items exclude pre-piling site grading, surface compaction and underground obstacle treatment - computed where occurring."

6. Quota-side measurement (same basis as the bill) TB/T 10831-2024 Volume 10 volume notes (XI) 1, original: "site levelling computes on the building's (structure's) first-floor floor area (area within the structural envelope); where the basement's structural outer line projects beyond the first floor's, the projected area merges." Section 1.1 item 3 sets two items per 100 m2: manual levelling (FY-65, cut-fill grading within plus/minus 30 cm) and machine levelling (FY-66, dozing).

7. Local variants (Beijing) DB11/T 2382-2024 clause 4.2.12: "levelling computes on the building's first-floor floor area; where a basement single-storey area exceeds the first-floor area, on the largest basement storey area." Clause 4.2.13: "rolling and native-soil tamping compute on the rolled or tamped area." Differing from the railway "projection merges" wording - follow the contracted pricing system.

Applicability Boundaries

  • Levelling applies only to grading within plus/minus 300 mm; vertical-layout excavation and hillside cutting (rock included) beyond the band never charge levelling - they charge general earth (rock) excavation by volume, never both on one section.
  • Systems differ (GB/T 50854-2024; DB11/T 638-2016; DB11/T 2382-2024; TB/T 10831-2024 - projection merging versus largest-basement-storey); follow the contracted system and its rules.
  • Landscape works run their own basis, never the building levelling items: GB/T 50858-2024 Annex A table A.1.1 note 3 - "green-site preparation means cut-fill loosening, raking, debris clearing and levelling, and waste haulage where the existing planting soil is 0.3 m thick or less", planting-soil backfill and green-slope shaping already inside - no separate listing.
  • Distinguish the employer's "site preparation cost": SJG 86-2020 clause 4.4.2 defines it as the employer's pre-start grading and clearance - an estimate-stage employer cost (GB/T 50875-2013 clause 2.2.34 alike); never a substitute for the bill's site levelling item.
  • Charging conditions and measurement only; no base prices or regional price levels - prices follow the contracted system, quota edition and compiling period.
  • GB 50500-2008 clauses are withdrawn - legacy comparison only.

Further Reading

  • GB/T 50854-2024, Annex A table A.3.1 (010103) and clause A.4.12 (term).
  • DB11/T 638-2016, Annex A table A.2.1 note 4 (the 30 / 10 / beyond-30 three-way split).
  • DB11/T 2382-2024, clauses 4.2.7, 4.2.12 and 4.2.13.
  • TB/T 10831-2024, volume notes (XI) item 1, section 1.1 item 3 (FY-65, FY-66), section 2 note 2 (pre-piling grading separate).
  • GB/T 50858-2024, Annex A table A.1.1 note 3; SJG 86-2020 clause 4.4.2; GB/T 50875-2013 clause 2.2.34.
  • Lineage: GB 50500-2008 Annex A note 4 (withdrawn); the current standard is GB/T 50500-2024.

Keywords

  • 平整场地
  • ±300mm
  • 竖向布置挖土
  • 挖一般土方
  • 首层建筑面积
  • 010103
  • GB/T 50854-2024
  • 场地找平