GB/T 50854-2024 "Standard for Calculation of Quantities of Building and Decoration Works": positioning and revision highlights, and its distinction from GB/T 50353-2013 "Code for Calculation of Gross Floor Area"
GB/T 50854-2024 is the "Standard for Calculation of Quantities of Building and Decoration Works" (replacing GB 50854-2013), governing the method of measurement and the preparation of the bill of quantities; the correct number of the "Code for Calculation of Gross Floor Area" is GB/T 50353-2013 (current) — the two names and numbers must not be mixed. Main revisions of 50854-2024: item descriptions (work item specifications), units of measurement and methods of measurement, and work contents; deletion of demolition works; formwork moved into the work-item BOQ while other preliminary items are priced per item.
Applicable Codes
- GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准
- GB/T 50353-2013 建筑工程建筑面积计算规范
- GB 55031-2022 民用建筑通用规范
Topic Positioning
Distinguishes two frequently confused standards: GB/T 50854-2024 "Standard for Calculation of Quantities of Building and Decoration Works" (governing the method of measurement and the preparation of the bill of quantities) and "Code for Calculation of Gross Floor Area" GB/T 50353-2013 (governing GFA computation), and summarizes the main revisions of 50854-2024. For quickly confirming "which code to consult" in cost estimating, quantity take-off, and permitting scenarios.
Core Conclusions
The name "Code for Calculation of Gross Floor Area GB/T 50854-2024" mismatches its number: GB/T 50854-2024 is the "Standard for Calculation of Quantities of Building and Decoration Works", revised from GB 50854-2013, specifying billed (BOQ) items and methods of measurement by discipline in appendices; GFA computation is governed by "Code for Calculation of Gross Floor Area" GB/T 50353-2013 (current) — e.g., a natural storey is measured by the sum of horizontal areas within the exterior structure perimeter, storeys with structural height >= 2.20 m count in full and those below count half. Revision highlights of GB/T 50854-2024: (1) item descriptions (work item specifications) revised, deleting content unrelated to design documents; (2) units of measurement and methods of measurement revised; (3) work contents revised to reflect the principal construction processes; (4) BOQ items for demolition works and obsolete processes deleted, with items matching current design and construction processes added; (5) preliminary items revised — formwork computed within the work-item BOQ, other preliminary items priced per item.
Applicable Boundaries
This card is for standard identification and framework mapping, not a substitute for specific item calculation. Work-item take-off follows the appendices of GB/T 50854-2024; GFA computation follows GB/T 50353-2013, and since 2023-03-01 civil buildings are additionally bound by the fully mandatory GB 55031-2022 Section 3.1, which prevails in conflict; the rumoured "GB/T 50353-2023" does not exist.
Further Reading
GB/T 50854-2024 foreword (revision summary) and methods of measurement of Appendices A-R by discipline; GB/T 50353-2013 Clause 3.0.1 (natural-storey area division), Clause 3.0.18 (sloped enclosures segmented by structural clear height: >= 2.10 m full area, 1.20-2.10 m half, < 1.20 m none); GB 55031-2022 Section 3.1 mandatory GFA rules.
Keywords
- GB/T 50854-2024
- 房屋建筑与装饰工程工程量计算标准
- 工程量计算标准
- GB/T 50854
- GB/T 50353-2013
- 建筑工程建筑面积计算规范
- method of measurement
- preparation of the bill of quantities