Curtain boxes and curtain tracks (rods): BOQ itemisation, quota item selection and units - proprietary erection and site fabrication listed apart, measurement by extended metres, tracks never merged with boxes
Curtains, curtain boxes and tracks are itemised per GB/T 50854-2024 Table H.10.1 (code 010810), measured by length (extended metres) from the drawings, never developed area; proprietary boxes take 'proprietary erection' items and site-made boxes 'fabrication and erection' items, the proprietary box entering as an unpriced main material; curtain tracks and rods are not inside the box items - every quota volume sets separate items, and they must be listed apart.
Applicable Codes
- GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准 App. H H.10 Table H.10.1(code 010810)
- DB11/T 2382-2024 建设工程施工消耗量标准 App. A A.8.10 Table A.8.10(A-8-72~A-8-77)
- TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程 册说明九.8
- 湖南2025版 房屋建筑与装饰工程消耗量标准 门窗工程说明 第八条
- 陕西新编消耗量定额 8-84~8-86、8-89~8-92
Positioning
The complete basis from BOQ itemisation to quota item choice for curtain boxes and curtain tracks (rods): one item or two, by length or developed area, proprietary versus site-made. For the door-and-window division of building fit-out (GB/T 50854-2024 Appendix H) and the corresponding items of provincial and railway quotas.
Core conclusions
1. BOQ: by length, tracks and boxes set apart GB/T 50854-2024 Appendix H (doors and windows) H.10: item setting, descriptions, unit and rules for curtains, curtain boxes and tracks follow Table H.10.1 'curtains, curtain boxes, tracks (code 010810)', unit m, quantity by design length; work content includes fabrication and erection. The table lists 'curtains', 'curtain boxes' and 'tracks' as separate items of one section - track (rod) and box are two independent BOQ items, never merged into one.
2. Three local quotas agree: by length, items set apart
- Railway TB/T 10831-2024 Volume 10, volume note 9 quantity rule 8: 'curtain boxes and curtain tracks compute by design length.'
- Hunan 2025: 'VIII. architraves, curtain boxes, curtain tracks: ... 3. curtain boxes and curtain tracks compute by extended metres.'
- Shaanxi draft: items 8-84~8-86 'curtain box' and 8-89~8-92 'curtain track', all per 10m (extended metres), box and track in separate sections. So 'boxes by developed area' is a common misconception - every listed basis goes by extended metres / design length.
3. Proprietary and site-made items apart; the proprietary box is unpriced main material
- Beijing DB11/T 2382-2024 Appendix A Table A.8.10 sets only proprietary boxes (4 bands) and rods / tracks (2 bands):
- A-8-72 roller and venetian blinds, hardwood, per m, all-in labour II 0.1520 workdays, main material hardwood curtain box (proprietary) 1.0000 m, M8x110 expansion bolts 4.5900 pairs, ironware 1.1070 kg;
- A-8-73 veneered board, unit m2 in the original text, labour II 0.1630, veneered box (proprietary) 1.0000 m, ironware 1.3000 kg;
- A-8-74 plastic, m2, labour II 0.0900, plastic box 1.0000 m;
- A-8-75 aluminium, m2, labour II 0.0900, aluminium box 1.0000 m, bolts 1.5200 pairs;
- all with other materials 1.5% and other plant 2.0%. The proprietary box prices separately as unpriced main material; the item carries erection consumption only.
- Note: A-8-72 is per m while A-8-73/74/75 are marked m2 in the original - verify against the standard and the local authority before use; do not assume the whole table is per m.
- Site fabrication (timber grounds plus plywood assembly) takes the local 'curtain box fabrication and erection' items, e.g. Shaanxi 8-84 (box without track, timber-ground plywood, 10m), 8-85 (plywood), 8-86 (proprietary plastic, 140 wide). Work content verbatim:
- fabrication and erection: 'setting out, marking, selecting, making and fixing timber grounds, preservative oil, cutting, trimming boards, nailing face boards, edge finishing';
- proprietary erection: 'setting out, marking, drilling, fixing ironware, derusting, red-lead, assembling the plastic box'. The proprietary item covers erection only; the fabrication item covers fabrication - never charge both.
4. Tracks and rods listed and priced apart
- Beijing A.8.10: A-8-76 'single rod (track)', per m, labour II 0.0110 workdays, exposed rod 1.0000 m, bolts 1.3500 pairs; A-8-77 'single rod (track)', per m, labour II 0.0200, rod 1.0000 m, bolts 2.7000 pairs.
- Shaanxi 8-89~8-92 divide by fixing and track count - concealed single / double, exposed single / double - per 10m, mains one-piece aluminium single track 10.100m, double 10.100m, proprietary rod 10.100 / 20.200m, labour 0.300 / 0.473 / 0.383 / 0.421 workdays per 10m.
- So tracks and rods are never inside the box items - list by track count (single / double) and fixing (exposed / concealed) with their own items; conversely, the box item never carries the track's erection labour.
Applicable boundaries
- BOQ per GB/T 50854-2024 H.10 (replacing GB 50854-2013); describe the box's material, specification and protection and the track's form (single, double) - they drive pricing and settlement.
- Quota consumption from the current local / sector volume only - no cross-regional or cross-sector borrowing of contents; the four bases cited share only 'by length, boxes and tracks apart'; labour and material contents differ.
- Beijing Table A.8.10 mixes m and m2 - follow the original text and local interpretation; proprietary and fabricated items are mutually exclusive - no double charge.
- Boxes integral with ceilings (concealed light troughs, shaped-ceiling linings) need case-by-case judgement against the design, possibly under ceiling items.
- Itemisation and units only - no prices here.
Further reading
- GB/T 50854-2024 Appendix H H.10, Table H.10.1 (010810); DB11/T 2382-2024 Appendix A Table A.8.10 (A-8-72~77); TB/T 10831-2024 volume note 9 rule 8; Hunan 2025 door-and-window note VIII; Shaanxi 8-84~8-86, 8-89~8-92.
Keywords
- 窗帘盒
- 窗帘轨
- 窗帘杆
- 成品窗帘盒
- 010810
- 延长米
- 门窗工程
- quota line item