quota line item
- 01
Deciding when firestop collars are required on plastic drainage pipes (GB 50015-2019 clause 4.4.10 and the fire-code family), measurement per piece and BOQ / quota item application (including the dedicated items of Beijing DB11/T 2382-2024 with the collar as main material priced by pipe size), and the pricing boundaries against floor-penetration sleeves and firestop sealing materials
Firestop collars on plastic drainage pipes measure per piece ('ge'), ban…
GB 50015-2019 建筑给水排水设计标准 第4.4.10条GB 55037-2022 建筑防火通用规范 第6.3.4条GB 50016-2014(2018年版)建筑设计防火规范 第6.1.6条2026-10-30 - 02
The rate build-up path from quota line items to the all-in unit rate of a BOQ item and the cost calculation procedure: divisional work item cost as BOQ quantity x all-in rate, sum of quota line item amounts / BOQ item quantity (3 decimal places for quantities, 2 for rates), the three pricing methods, the analysis sheet identical to the BOQ rate, and the taxed versus tax-exclusive cost structures
The all-in unit rate of a BOQ item is converted as 'sum of quota line it…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第 2.0.9、2.0.10、3.1.5、3.1.7 条GB/T 51095-2015 · Code for construction cost consultation 第 5.3.8、5.3.9 条及App. CGB/T 50875-2013 · Standard glossary of project costs 第 2.3.6 条2026-10-25 - 03
Curtain boxes and curtain tracks (rods): BOQ itemisation, quota item selection and units - proprietary erection and site fabrication listed apart, measurement by extended metres, tracks never merged with boxes
Curtains, curtain boxes and tracks are itemised per GB/T 50854-2024 Tabl…
GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准 App. H H.10 Table H.10.1(code 010810)DB11/T 2382-2024 建设工程施工消耗量标准 App. A A.8.10 Table A.8.10(A-8-72~A-8-77)TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程 册说明九.82026-10-23 - 04
Composition and determination of the work content of quota sub-items / BOQ items: main processes + auxiliary content included by default, under "unlisted not separately counted, auxiliary must be included, processes not split"
The work content of a quota sub-item = the listed main construction proc…
GB/T 50860-2024 构筑物工程工程量计算标准GB/T 50857-2024 市政工程工程量计算标准GB 50860-2013 构筑物工程工程量计算规范2026-09-25 - 05
Avoiding mispricing when material names are similar but specifications differ: three lines of specification-checking defense across preparation, pricing, and audit
The three forms of mispricing (specifications missing from item characte…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 51095-2015 建设工程造价咨询规范DB42/T 823-2021 建设工程造价咨询质量控制规范2026-09-25 - 06
Whether one work content can apply multiple quota items: multi-sub-item rate build-up for BOQ items is allowed; duplicate application for the same process is prohibited
Determined in two layers: (1) one BOQ item applying multiple quota sub-i…
GB 50860-2013 构筑物工程工程量计算规范GB/T 50860-2024 构筑物工程工程量计算标准GB/T 50857-2024 市政工程工程量计算标准2026-09-25