Engineering Knowledge Cards.
Confidence HighUpdated 2026-10-30

Deciding when firestop collars are required on plastic drainage pipes (GB 50015-2019 clause 4.4.10 and the fire-code family), measurement per piece and BOQ / quota item application (including the dedicated items of Beijing DB11/T 2382-2024 with the collar as main material priced by pipe size), and the pricing boundaries against floor-penetration sleeves and firestop sealing materials

Firestop collars on plastic drainage pipes measure per piece ('ge'), banded by main-pipe / nominal diameter, counted as shown on the design: DB11/T 2382-2024 clause 6.10.44 - collar installation counts by main-pipe diameter as shown - with dedicated items under Table C.10.25-6 (DN50 -> C10-4-82, DN100 -> C10-4-84, unit 'piece', work content marking, drilling, setting, bolting, collar installation), the 'firestop collar' main material listed separately at 1.0000 piece per piece. GB/T 50856-2024 Appendix K Table K.2.1 (pipe accessories, 031002) and the local list guide Table N.1 (other and ancillary works, 031301) set no dedicated collar item - add a supplementary item (last three digits 801~999) or fold into the plastic drainage pipe's all-in unit rate. The setting test is not a blanket 'DN110': GB 50015-2019 clause 4.4.10 requires collars on both sides of fire walls (no diameter threshold); in high-rise buildings, exposed soil stacks of dn110 and over crossing floors take a collar below the slab (all three preconditions); pipes crossing shaft walls take collars outside the shaft wall; GB/T 51410-2020 clause 5.2.4 adds that pipes over 50mm nominal take a collar or firestop wrap below vertical penetrations or on both sides of horizontal ones.

Applicable Codes

  • GB 50015-2019 建筑给水排水设计标准 第4.4.10条
  • GB 55037-2022 建筑防火通用规范 第6.3.4条
  • GB 50016-2014(2018年版)建筑设计防火规范 第6.1.6条
  • GB/T 51410-2020 建筑防火封堵应用技术标准 第5.2.4条
  • GB 50242-2002 建筑给水排水及采暖工程施工质量验收规范 第5.2.4条
  • GB/T 50856-2024 通用安装工程工程量计算标准 App. KTable K.2.1、App. NTable N.1
  • CJJ/T 29-2010 建筑排水塑料管道工程技术规程 第5.1.17条
  • DBJ/T 15-248-2022 建筑工程消防施工质量验收规范 第5.4.4、5.4.9条
  • DB11/T 2382-2024 建设工程施工消耗量标准 第6.10.44条、Table C.10.25-6
  • 京建发〔2012〕538号 2012预算定额 通用安装第十册第四章
  • DBD 29-903-2025 天津市安装工程工程量清单计价指引 表N.1、表K.2
  • GA 304 塑料管道阻火圈

Positioning

The complete decision chain for firestop collars on plastic drainage pipes (PVC-U included) - whether and on which side, then how to measure, which item to apply, how the main material prices, and where the boundaries run against sleeves and firestop sealing - for pricing and review of water and drainage installation works.

Core conclusions

1. Setting conditions (place and preconditions judged apart - no blanket DN110)

GB 50015-2019 (building water and drainage design standard) clause 4.4.10: openings and sleeve gaps of metal drainage pipes through floors and fire walls are sealed with firestop materials. Plastic drainage pipes carry fire stops as follows: 1 pipes crossing fire walls - stops on the pipe on both sides of the wall; 2 in high-rise buildings, exposed drainage stacks of dn110 or over crossing floors - stops on the pipe below the slab; 3 drainage pipes crossing shaft walls - stops on the pipe outside the shaft wall. Commentary: the floor case holds three preconditions - (1) a drainage pipe in a high-rise; (2) exposed, not run in a shaft or duct; (3) plastic pipe of outside diameter 110mm or over - all three together, resting on fire-sealing refractory tests of plastic-pipe penetrations. The shaft-wall rule follows the fire compartmentation of GB 50016-2014; a 'pipe shaft' is a space with an access door, entered or not - not a duct. Collars comply with GA 304 (firestop collars for plastic pipes). Companion codes:

  • GB 55037-2022 clause 6.3.4: 'Pores where cables and pipes pass fire walls, fire partitions, shaft walls, movement joints and floors take firestop sealing; the assembly's fire resistance is never below the element's.' Sealing detail per GB/T 51410.
  • GB 50016-2014 (2018) clause 6.1.6: other pipes should not cross fire walls; where they must, the gaps are packed tight with firestop materials and insulation at the crossing is non-combustible; combustible or hardly-flammable pipes take fire measures on both sides - for plastics that shrink or ablate at heat, thermally expanding collars or fire-rated shafts serve.
  • GB/T 51410-2020 clause 5.2.4: plastic pipes through fire-rated structure - the annular gap packed with mineral wool backing covered by intumescent sealant, or sealed with fire-stop boards plus intumescent sealant at the board-to-pipe gap; 'pipes over 50mm nominal additionally take a firestop collar or wrap below vertical penetrations or on both sides of horizontal ones'. Up to DN50 the intumescent seal alone closes the hole; over DN50 the collar or wrap is mandatory.
  • GB 50242-2002 clause 5.2.4: plastic drains carry expansion joints per design (spacing otherwise no more than 4m); 'exposed plastic drainage pipes in high-rise buildings take firestop collars or fire sleeves per design', by observation.
  • CJJ/T 29-2010 clause 5.1.17: high-rise plastic drainage systems of 110mm and over take collars at penetrations per design, tight against the slab soffit or wall, fixed with expansion bolts.
  • DBJ/T 15-248-2022 clauses 5.4.4 / 5.4.9: collars pass incoming inspection (certificates, consistency, full count, appearance and specification); 'collars are never wrapped and are fixed firm' - 20% of lots, no fewer than 5 places, by observation and records. Order of decision (strictest first): (1) fire wall / partition crossing - both sides, no diameter threshold; (2) high-rise + exposed + stack dn110 and over through a floor - below the slab; (3) shaft-wall crossing - outside the shaft wall; (4) where the design or a local standard adopts GB/T 51410's 'over DN50', the stricter governs; (5) no collar never means no sealing - the pores stay under GB 55037-2022 clause 6.3.4's mandatory firestopping.

2. Measurement and BOQ itemisation

  • Unit and rule: per piece, banded by main-pipe (nominal) diameter, counted as shown. DB11/T 2382-2024 clause 6.10.44: 'collar and anti-leak stopper installation counts by main-pipe diameter as shown on the design.' Jing Jian Fa [2012] No. 538, volume 10 chapter 4, rule 3 the same.
  • BOQ items: GB/T 50856-2024 Appendix K Table K.2.1 'pipe accessories (031002)' holds no collar item; the local guide Table N.1 'other and ancillary works (031301)' lists only chasing (031301001), drilling (031301002), sleeves (031301003), proprietary supports (031301004), supports / hangers and base steels (031301005). So choose one: (1) a supplementary item with digits 7-9 in 801~999 (the guide's general notes so provide); (2) fold into the plastic drainage pipe item's all-in rate with the collar's specification and count stated in the item description / work content - no omission, no duplication.
  • Quota items (Beijing sample): DB11/T 2382-2024 sets dedicated collar items under continuation Table C.10.25-6 (plastic sleeve fabrication and erection), unit 'piece', work content 'marking, drilling, setting, bolting, collar installation', banded by nominal diameter (up to): DN50 -> C10-4-82, DN100 -> C10-4-84 (like items continue by band - seat against the current book's contents). Per piece: C10-4-82 - all-in labour II 0.0800 workdays, firestop collar 50 at 1.0000, M12 expansion bolts 4.1200 sets, masonry drill bit 0.0400, d100 nylon disc 2.0000, other plant 3.0000%; C10-4-84 - labour II 0.1000, collar 110 at 1.0000, auxiliaries as before.
  • Quota items (Tianjin sample): guide DBD 29-903-2025 (on GB/T 50500-2024, GB/T 50856-2024, DBD 29-001-2025 and base prices DBD 29-301~313-2020) sets no collar item; its general notes: items outside the national measurement standard 'compile per the national codes; combinable base-price items are combined or supplemented per the design'. Whether the Tianjin base prices hold a dedicated collar item must be read in DBD 29-301~313-2020 volume 8 - never invent numbers.

3. Main-material treatment

The collar lists at 1.0000 piece per installed piece, coded by diameter (collar 50, collar 110) - the main material prices by matching size (intumescent collars selected by pipe size, at compilation-period market or published prices); installation auxiliaries (M12 bolts 4.1200 sets per piece and the like) ride in the item and never recharge.

4. Boundaries against sleeves and firestop materials

  • Sleeves: separate items, never inside the collar. BOQ 031301003 'sleeve' (description: name, material, specification, packing); the note - 'sleeve names cover waterproof, ordinary steel and fire sleeves at foundations, walls, beams and floors; rigid and flexible sleeves list separately' - the fire sleeve is a sleeve item, distinct from the collar. Beijing chapter 4 notes: sleeve items include hole-sealing labour and materials, packing compiled as oil-mat (convertible per design); reserved-hole and hole-sealing items serve only the no-sleeve case - sleeve items include them, never recharge; insulated pipes take the sleeve item at insulation outside diameter. Collars price per piece by main-pipe diameter - each its own.
  • Firestop sealing materials (intumescent mastic, inorganic putty, fire-stop bags, modules, boards, foam, sealants, seal paints, wraps): complementary to collars, never interchangeable. Per GB/T 51410-2020 clause 5.2.4, the annular gap takes mineral-wool backing plus intumescent sealant (or boards plus sealant); over DN50 a collar or wrap follows below vertical / beside horizontal penetrations - the collar a formed product (GA 304), the wrap a windable band. Pricing lists them apart: sealing by its position (hole volume / area) and material, collars per piece; where both sit on one penetration, check the work contents against 'sealing included and re-listed' or 'sealed by volume and counted per piece' double counting.

Applicable boundaries

  • Measurement and quota bases sampled from Beijing DB11/T 2382-2024, Jing Jian Fa [2012] No. 538 volume 10 chapter 4 and Tianjin DBD 29-903-2025; other provinces - check the local quota for dedicated items, numbers and bands (the common basis: per piece, banded by main-pipe size, main material by size).
  • GB 50015-2019's dn110 serves only the high-rise + exposed + floor-crossing stack case - never extended to fire walls or shaft walls; stacks hidden in shafts or ducts fail 'exposed'.
  • GB/T 51410-2020's 'over DN50' and GB 50015-2019's 'dn110 and over' are different codes' lines - design and pricing take the stricter and cite the clause.
  • Setting conditions and pricing bases only, no material prices; main materials at compilation-period market or published prices.
  • Acceptance: collars unwrapped, fixed firm, tight to the soffit or wall, bolted - failed acceptance never enters completed quantities.

Further reading

  • GB 50015-2019 clause 4.4.10 and commentary; GB 55037-2022 clause 6.3.4; GB 50016-2014 (2018) clause 6.1.6 and commentary; GB/T 51410-2020 clause 5.2.4 with Figure 8; GB 50242-2002 clause 5.2.4; CJJ/T 29-2010 clause 5.1.17; DBJ/T 15-248-2022 clauses 5.4.4 / 5.4.9; GA 304.
  • Beijing DB11/T 2382-2024 clauses 6.10.43~6.10.46 and Appendix C Table C.10.25-6 items from C10-4-82; Jing Jian Fa [2012] No. 538 volume 10 chapter 4 notes 7 and 9, rules 2 and 3.
  • GB/T 50856-2024 Appendix K Table K.2.1 (031002) and Appendix N Table N.1 (031301); Tianjin DBD 29-903-2025 Tables K.2 / N.1 with general notes 4, 5 and 9, and base prices DBD 29-301~313-2020 volume 8.