GB 55031-2022 "General code for civil buildings": fully mandatory status, the nine standards whose mandatory provisions it repealed, and the main technical changes

GB 55031-2022 was approved by MOHURD Announcement No. 118 of 2022 and took effect 2023-03-01 as a fully mandatory code (all provisions mandatory, prevailing over inconsistent current standards); upon implementation it repealed the listed mandatory provisions of nine current standards (GB 50352-2019, JGJ 100-2015, JGJ 64-2017, JGJ 113-2015, JGJ 102-2003, JGJ 336-2016, JGJ 214-2010, JGJ 103-2008, JGJ 345-2014 — the standards themselves remain valid). Main technical changes: gross floor area (GFA) measured to the outer face of the exterior envelope; above/below-ground division rules; residential daylighting no longer mandatory; continuity of accessibility; roof slope >= 2% and wind-uplift resistance; skylights and canopies must use laminated glass.

Applicable Codes

  • GB 55031-2022 民用建筑通用规范
  • GB 50352-2019 民用建筑设计统一标准
  • JGJ 100-2015 车库建筑设计规范
  • JGJ 64-2017 饮食建筑设计标准
  • JGJ 113-2015 建筑玻璃应用技术规程
  • JGJ 102-2003 玻璃幕墙工程技术规范
  • JGJ 336-2016 人造板材幕墙工程技术规范
  • JGJ 214-2010 铝合金门窗工程技术规范
  • JGJ 103-2008 塑料门窗工程技术规程
  • JGJ 345-2014 公共建筑吊顶工程技术规程

Topic Positioning

An overall framework card for GB 55031-2022 "General code for civil buildings": fully mandatory status, the list of nine standards whose mandatory provisions were repealed, and the main technical changes — quickly grasping what this code "is, governs, and changed".

Core Conclusions

Approved by MOHURD Announcement No. 118 of 2022, effective 2023-03-01, all provisions mandatory and prevailing over inconsistent current standards. Six chapters: general provisions; basic requirements; gross floor area (GFA) and height; building exterior sites; common building spaces; building components and construction — setting bottom lines for civil building spaces and elements. Upon implementation it repealed the listed mandatory provisions (the standards themselves remain valid) of nine standards: GB 50352-2019, JGJ 100-2015, JGJ 64-2017, JGJ 113-2015, JGJ 102-2003, JGJ 336-2016, JGJ 214-2010, JGJ 103-2008, JGJ 345-2014. Main changes: gross floor area (GFA) computed to the outer face of the exterior envelope (including insulation and finishes; curtain walls by the outer panel edge); above/below-ground division by the outdoor level and the half-storey-height rule; residential daylighting no longer mandatory; system continuity of accessibility; material-graded roof slope >= 2% with drainage computation; prefabricated roofs checked for wind uplift and, in severe/cold regions, falling ice and snow; skylight and canopy glazing must be laminated.

Applicable Boundaries

Applies to the whole process of construction, use, and maintenance of new, expanded, and renovated civil buildings. Only the listed mandatory provisions were repealed — the general provisions of those standards remain referenceable; other specialties have their own general codes of the same level; local rules may supplement, refine, and raise requirements.

Further Reading

MOHURD Announcement No. 118 of 2022 (item-by-item repeal list); the commentary (function-performance clauses: all of 2.1, 2.2.1-2.2.4, 4.1.1, 4.3.1, 5.1.1, 5.7, 6.1.1, 6.2.1, 6.3.1, 6.7, etc.); area details compared in the GB/T 50353-2013 related cards.