General Code for Civil Buildings (GB 55031)
- 01
Current building-area calculation rules: GB 55031-2022 Section 3.1 (mandatory) vs GB/T 50353-2013, and debunking "50353-2023"
GB/T 50353-2023 does not exist; the current recommended code remains GB/…
GB 55031-2022 民用建筑通用规范 第3.1节 建筑面积与高度GB/T 50353-2013 建筑工程建筑面积计算规范2026-09-25 - 02
Determination of full-area vs half-area gross floor area: the four space-category rules of GB 55031-2022 Section 3.1, special parts (balconies / sloped roofs / basements) and the six categories not counted
For the full/half determination, first verify the three preconditions (p…
GB 55031-2022 · General Code for Civil Buildings 第 3.1.1、3.1.3、3.1.4、3.1.5、3.1.6 条GB/T 50353-2013 · Code for Calculation of Gross Floor Area of Building Works 第 3.0.1、3.0.3、3.0.5、3.0.21 条DB11/T 2032-2022《工程建设项目多测合一技术规程》第 6.2.6 条2026-09-25 - 03
GB 55031-2022 "General code for civil buildings": fully mandatory status, the nine standards whose mandatory provisions it repealed, and the main technical changes
GB 55031-2022 was approved by MOHURD Announcement No. 118 of 2022 and to…
GB 55031-2022 民用建筑通用规范GB 50352-2019 民用建筑设计统一标准JGJ 100-2015 车库建筑设计规范2026-09-25