Overview of engineering budget preparation and review: the seven-step preparation workflow and the three-layer review framework
The construction-drawing based budget (pre-tender estimate) is a pre-construction forecast calculation of works costs based on the construction drawing design documents, per prescribed procedures, methods and bases (GB/T 50875-2013, Clause 3.2.8). Preparation main line: lock the pricing bases → measure quantities per the quota norms' method of measurement → rate build-up (all-in unit rate = labour cost + materials + plant and small tools cost + management fee + profit + statutory levies and fees + taxes and duties; prepare supplementary unit-rate build-up schedules for work items not covered by the quota manuals) → apply on-costs → summarize → explanatory notes of the estimate → check and review; review main line: five methods (comprehensive / standard / grouping / comparison / key-item review, GB/T 51095-2015, Clause 5.1.5), focusing on quantities, labour/material/plant prices, pricing by applying quota line items, and on-cost application; deliverables follow three-level management (preparation–review–approval) with two-level review, and the recheck ratio is generally no less than 10%.
Applicable Codes
- GB/T 51095-2015 建设工程造价咨询规范
- GB/T 50875-2013 工程造价术语标准
- DB42/T 823-2021 建设工程造价咨询质量控制规范
- DL/T 5468-2013 输变电工程施工图预算编制导则
- T/ZBD 100.5-2023 建设工程结算审核作业指引
Topic Positioning
An overview/navigation card for preparing and reviewing the engineering budget (construction-drawing based budget, i.e. pre-tender estimate): one map stringing together the "seven-step preparation workflow" and the "three-layer review framework (methods — content — judgment)", pointing to the detailed topic cards — suitable as the starting point for entering budget work.
Core Conclusions
Preparation main line: ① lock the pricing bases (quota norms edition, published price information issue, pricing standard version); ② quantity take-off (measurement) per the budget quota norms' item division and method of measurement (GB/T 51095-2015, Clause 5.3.8); ③ rate build-up — the all-in unit rate covers labour cost, materials, plant and small tools cost, management fee, profit, statutory levies and fees, and taxes and duties, with labour/materials/plant determined from norm resource consumption and preparation-period market prices, and on-costs applied per the supporting norms for on-costs and expenses while considering market levels (Clause 5.3.9); for work items not covered by the quota manuals, prepare supplementary unit-rate build-up schedules (Clause 5.3.12), and the on-cost basis must match the quota line items applied; ④ summarize and write the explanatory notes of the estimate; ⑤ check and review — deliverables follow three-level management and two-level review of preparation, review and approval (Clause 3.3.2), and the reviewer's recheck ratio is generally no less than 10% (Clause 3.3.4). Review main line: five review methods (comprehensive, standard, grouping, comparison, key-item — Clause 5.1.5), prioritizing items with large quantities, high costs and complex structures, and verifying the correctness and completeness of quantity take-off, factor prices of labour/materials/plant, pricing by applying quota line items, and the taking of management fee, profit, statutory levies and fees, and taxes and duties.
Applicable Boundaries
This card is an overview framework and does not replace the depth of each topic; it is mainly in the general building-cost consulting context. The document composition and fee systems of railway, power, highway and other sector budgets differ (e.g., railway preliminaries = (base-period labour cost + base-period plant and small tools cost) × percentage rate; power budgets must go through preparation–check–review–approval procedures with signatures and seals) and should be used with the sector preparation measures.
Further Reading
- Common preparation and review bases: GB/T 51095-2015 Clauses 3.3.2, 3.3.4, 5.1.5, 5.3.8–5.3.12 and Appendix C; GB/T 50875-2013 Clause 3.2.8; DB42/T 823-2021 Clauses 6.1.5, 6.3.9, 6.3.12
- Sector bases: railway TB 10801-2024 estimate (budget) preparation measures; power DL/T 5468-2013, DL/T 5591-2021; final account review T/ZBD 100.5-2023
- Sub-topics (see cited cards): the five review methods and reconciliation checks, double counting investigation, budget document completeness recheck, reduction scope and red lines, explanatory notes of the estimate composition, supplementary quota items preparation, market price enquiry pricing, and the GB/T 50500-2024 on-cost basis changes