Composition of highway estimate and budget documents: cover/title page/contents/explanatory notes/computation tables, Group A/Group B division and table computation order (JTG 3830-2018 section 2.3)
Per clause 2.3.1 of JTG 3830-2018, highway estimate and budget documents consist of the cover, title page, contents, explanatory notes and all computation tables; the explanatory notes must contain 10 items (clause 2.3.3); documents divide into Group A (fee computation tables) and Group B (base-data computation tables of the construction-installation cost), submitted with the design documents together with computable electronic cost data, Group B's "itemized works estimate (budget) table" (table 21-2) being submittable electronically only; when compiled by sections or parts, a "summary total estimate (budget) table" (table 01-1) must be compiled. Tables compute in the order of figure 2.3.6: table 22 -> 09 -> 21-2 -> 04 -> 01 -> 01-1 -> explanatory notes.
Applicable Codes
- JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第2.3节 文件组成
- 《公路工程基本建设项目设计文件编制办法》
Topic Positioning
The composition system of highway estimate and budget documents: overall composition (cover, title page, contents, explanatory notes, all computation tables), the ten items of the explanatory notes, the Group A/B division and submission requirements, and the computation order and relations of the various tables — per section 2.3 "document composition" of JTG 3830-2018, for compiling, reviewing and completeness-checking estimate/budget documents.
Core Conclusions
- Overall composition (clauses 2.3.1, 2.3.2, 2.3.4)
- "Estimate and budget documents consist of the cover, title page, contents, explanatory notes and all computation tables."
- Cover and title page follow the current "Measures for compiling design documents of highway capital construction projects"; the second page of the title page and the contents follow appendix A of these measures.
- Computations of material/equipment and plant shift prices and all fees must be presented through the prescribed unified tables, formats per appendix A.
Contents of the explanatory notes (clause 2.3.3, 10 items) (1) basis of the project design documents; (2) compilation scope, project overview etc.; (3) quotas and fee standards adopted, bases/sources of workday labor, material/equipment and plant shift budget prices, unit-price analyses of new technologies; (4) main content of relevant agreements and meeting minutes; (5) total estimate/budget amount, total quantities of labor, steel, cement, asphalt etc.; (6) economic comparison of design alternatives; (7) project comprehensive techno-economic indicators, comparing quantities and costs of this stage against the previous stage; (8) explanations of other fee items and pricing bases; (9) name and version of the highway cost software used; (10) other matters needing explanation.
Group A/B division and submission (clause 2.3.5)
- "Group A documents are the fee computation tables; Group B documents are the base-data computation tables of the construction-installation cost."
- Groups A and B are submitted with the design documents per the submission copies required by the current design-document measures, together with computable electronic cost data and detailed unit-price analyses of new technologies.
- Group B's "itemized works estimate (budget) table" (table 21-2) may be submitted electronically only, or on paper as needed.
- Estimates/budgets are compiled per one project (one route or one independent major (medium) bridge or tunnel); where sections or parts are compiled separately, a "summary total estimate (budget) table" (table 01-1) must be compiled.
- Table computation order (clause 2.3.6, figure 2.3.6) Core chain: material budget price table (22) -> labor/material/plant price summary (09) -> itemized works estimate (budget) table (21-2) -> comprehensive rate computation table (04, 04-1) -> section total estimate (budget) table (01) -> summary total estimate (budget) table (01-1) -> explanatory notes; auxiliary tables include 00 (totals of labor, main materials, plant shifts), 05 (equipment cost), 24 (shift price computation), 23-1 (self-quarried material pit prices), 23-2 (self-arranged material transport unit freight), and the stage-to-stage cost comparison table.
Applicable Boundaries
- Scope: compiling and reviewing estimate/budget documents of highway projects (one route or one independent major (medium) bridge/tunnel); JTG 3830-2018 is current, replacing the 2007 edition (JTG B06-2007).
- Provincial transport authorities may issue local supplementary provisions per clause 1.0.8 (local rates, table formats) — compile per the project location's current rules.
- Not applicable to railway, building, municipal, hydraulic industries — each has its own measures (e.g. railway TB 10801/TB 10811); table formats and document compositions must not be mixed.
- Table formats must follow appendix A — no self-invented formats; Groups A and B must be complete with the computable electronic cost data at submission.
Further Reading
- JTG 3830-2018 section 2.3 (document composition), appendix A (cover, title page, contents and all table formats), figure 2.3.5 (contents of Groups A and B), figure 2.3.6 (computation order and relations of tables).
- "Measures for compiling design documents of highway capital construction projects" (cover/title page and submission copies).
- Companion cost calibers: section 3.1 (8 components of the construction-installation cost), section 3.3 (nine components of other construction costs) — use together with this card.
Keywords
- JTG 3830-2018
- administrative compilation rules for estimates and budgets
- 文件组成
- 甲组文件
- 乙组文件
- explanatory notes of the estimate
- 总概预算汇总表
- highway works