Signature elements on the title page of highway estimate and budget documents: compiler/checker signatures + professional qualification seals, project name, compiling unit, date, volume number (JTG 3830-2018 Section 2.3; Jiao Gong Lu Fa [1996] No. 611)
Per Clause 2.3.2 of JTG 3830-2018, the cover and title page of highway estimate/budget documents follow the current "Measures for compiling design documents of highway capital construction projects"; the reverse of the title page must carry the project name, compiling unit, names of the compiling and checking personnel with their professional (qualification) seals, compilation date, and volume number (per Clause 3.1.1 of Jiao Gong Lu Fa [1996] No. 611). The signing parties are the compiler and checker; the seal is the professional qualification seal, not the company chop.
Applicable Codes
- JTG 3830-2018 公路工程建设项目概算预算编制办法 第2.3节
- 交公路发〔1996〕611号 公路基本建设工程投资估算编制办法 第3.1.1条
- 交公路发〔2007〕358号 公路工程基本建设项目设计文件编制办法
- DB63/T 2011-2022 公路养护工程预算编制指南
- DB63/T 2012-2022 公路养护小修保养工程指标预算编制指南
Topic Positioning
The signature and seal elements required on the title page (signature page) of highway estimate, budget (and investment-estimate) documents: compiler/checker signatures + professional qualification seals, project name, compiling unit, compilation date, volume number, etc. Per Section 2.3 of JTG 3830-2018 "Measures for compiling estimates and budgets of highway engineering construction projects" and Clause 3.1.1 of Jiao Gong Lu Fa [1996] No. 611 "Measures for compiling investment estimates of highway capital construction projects".
Core Conclusions
- Document composition (JTG 3830-2018 Clause 2.3.1, verbatim): "Estimate and budget documents shall consist of a cover, title page, contents, compilation explanations, and all computation forms."
- Title-page basis (Clause 2.3.2, verbatim): "The cover and title page shall be made per the current 'Measures for compiling design documents of highway capital construction projects'. The reverse of the title page and the contents shall be made per Appendix A of these measures." The cover/title-page format is thus not set by the estimate/budget measures but by the design-document measures; the reverse and contents follow Appendix A of JTG 3830-2018.
- Signature and seal elements (Jiao Gong Lu Fa [1996] No. 611 Clause 3.1.1, estimate-document caliber, consistent with estimates/budgets): "The reverse of the title page shall carry the construction project name, the compiling unit, the names of the compiling and checking personnel with qualification seals, the compilation date, and which volume of how many."
- Checklist: (1) project name; (2) compiling unit; (3) compiler's signature + professional qualification seal; (4) checker's signature + professional qualification seal; (5) compilation date; (6) volume __ of __.
- Local corroboration: Qinghai "Guide for compiling budgets of highway maintenance works" (DB63/T 2011-2022) Appendix A Table A.2 title-page format: "compiled: signed and with professional (practice) qualification seal; checked: signed and with professional (practice) qualification seal"; the "Guide for compiling indicator budgets of highway minor-repair maintenance works" (DB63/T 2012-2022) Clause 5.2.2 likewise requires the project name, compiling unit, compiler/checker names with qualification seals, date, and volume number.
Applicable Boundaries
- Applies to title pages of investment estimates, estimates, and budgets of highway capital construction projects; maintenance budgets (incl. minor repair) use the same format.
- The title-page seal is the professional (qualification) seal (cost engineer's practice seal), not the company chop; the company chop usually goes on the cover or the consultancy's signature page, per the firm's quality management.
- Cost engineers must sign and seal the cost documents they are responsible for; the specific obligations are governed by the "Interim measures for highway engineering cost management" (Ministry of Transport Order No. 67 of 2016) (the clause text was not located in local evidence — verify before citing); provincial transport authorities may issue supplements per JTG 3830-2018 Clause 1.0.8.
- This card covers only title-page signature elements, not the 10 contents of the explanations or the group-A/B division and form order (see the document-composition card).
Further Reading
- JTG 3830-2018 Section 2.3 (document composition), Appendix A (title-page reverse and contents formats).
- "Measures for compiling design documents of highway capital construction projects" (Jiao Gong Fa [2007] No. 358, effective 1 October 2007) cover/title-page provisions and companion form examples.
- "Measures for compiling investment estimates of highway capital construction projects" (Jiao Gong Lu Fa [1996] No. 611) Clause 3.1.1 "1. cover and contents".
- Qinghai DB63/T 2011-2022 Appendix A Table A.2 (title-page format example); DB63/T 2012-2022 Clause 5.2.2.
Keywords
- 概算预算
- 扉页
- 签字盖章
- 执业印章
- 资格印章
- 编制复核
- JTG 3830-2018
- 签署页