Highway 2018 quota norms system: composition of the cost of works (construction and installation) — 8 cost items, separation of net price and VAT, and bases to which percentage rates are applied (JTG 3830-2018 section 3.1)
Per JTG 3830-2018 clause 3.1.1, highway cost of works (construction and installation) = direct costs + permanent equipment procurement cost + preliminaries + overheads (company and site) + statutory levies and fees + profit + taxes and duties (VAT under the current standard) + special costs (8 items); except special costs, all follow the separation of net price and VAT rule, computed at prices (percentage rates) excluding deductible input VAT. Norm-based cost of works = norm-based direct cost + 40% of norm-based permanent equipment procurement cost + preliminaries + overheads (company and site) + statutory levies and fees + profit + taxes and duties + special costs. Bases to which percentage rates are applied (Form 08): preliminaries and overheads (company and site) on the sum of norm-based labour cost and norm-based plant cost, or norm-based direct cost; statutory levies and fees on labour cost; profit on (norm-based direct cost + preliminaries + overheads (company and site)); taxes and duties on (direct costs + preliminaries + overheads (company and site) + statutory levies and fees + profit).
Applicable Codes
- JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1节
- JTG/T 3832-2018 · Budget Quota of Highway Engineering 附录四
- JTG/T 3833 · Quota for Shift Costs of Highway Engineering Machinery
Topic Positioning
Composition, pricing rules and bases to which percentage rates are applied for highway cost of works (construction and installation) under the 2018 quota norms system, per section 3.1 of JTG 3830-2018 'Administrative Compilation Rules for Estimates and Budgets of Highway Construction Projects'.
Core Conclusions
1. Composition (clause 3.1.1, 8 items): the original text — 'The cost of works (construction and installation) comprises direct costs, permanent equipment procurement cost, preliminaries, overheads (company and site), statutory levies and fees, profit, taxes and duties, and special costs', i.e. cost of works (construction and installation) = direct costs + permanent equipment procurement cost + preliminaries + overheads (company and site) + statutory levies and fees + profit + taxes and duties + special costs.
2. Pricing rules (clause 3.1.1):
- Separation of net price and VAT: except special costs, all items follow the 'separation of net price and VAT' rule — every cost is computed at prices (percentage rates) excluding deductible input VAT, with VAT rates for specific factor prices per the finance/tax authorities.
- Norm-based basis (for fee bases and summary tables): norm-based cost of works comprises norm-based direct cost, 40% of norm-based permanent equipment procurement cost, preliminaries, overheads (company and site), statutory levies and fees, profit, taxes and duties and special costs; norm-based direct cost comprises norm-based labour cost, norm-based material cost and norm-based plant cost. Norm-based labour/material/plant/equipment costs are taken at base prices per Appendix IV 'Norm-Based Labour, Material and Equipment Unit-Price Table' of the 'Highway Works Budget Quota Manual' (JTG/T 3832-2018) and the current 'Highway Works Plant Rate Norms per Machine-Shift' (JTG/T 3833).
3. Direct costs (clause 3.1.2): direct costs = labour cost + material cost + construction plant cost.
- Labour cost: labour-days from the preliminary estimate/budget quota norms x all-in daily labour rate; the daily labour rate is set, published and dynamically adjusted by provincial transport authorities, and serves only as the basis for compiling preliminary estimates/budgets, not for actual wage payment.
- Material cost: calculated at the material price at the works location. Norm-based material price for estimating = (material price at source (ex-works / ex-yard) + freight and handling charges) x (1 + off-site transport wastage rate) x (1 + purchasing and custody charges percentage rate) - recoverable packaging value. Material price at source: purchased materials (referring to prices published by the regional transport authority and surveyed market prices) and self-quarried materials (sand, stone, clay — quarrying unit price per the quota norms plus auxiliary-production on-costs (indirect costs) and mineral resource tax, if any). Freight and handling charges are calculated at surveyed market freight rates; with multiple supply points, weighted average by distance, volume and rate; no adjustment coefficient is applied to the average motor-haul distance, and no on-site haul distance or double-handling distance may be added beyond the site warehouse or material stack. When cement is motor-hauled over 500 km, the off-site transport wastage rate for bagged cement increases by 0.5 percentage points. Purchasing and custody charges are calculated by multiplying the sum of material price at source, freight and handling charges and off-site transport wastage by the percentage rate.
4. Bases to which percentage rates are applied (per the Form 08 notes):
- Preliminaries, overheads (company and site): on (norm-based labour cost + norm-based plant cost) of the item, or norm-based direct cost x percentage rate;
- Statutory levies and fees: on labour cost of the item x percentage rate;
- Profit: on (norm-based direct cost + preliminaries + overheads (company and site)) x profit rate;
- Taxes and duties: on (direct costs + preliminaries + overheads (company and site) + statutory levies and fees + profit) x tax rate.
Applicable Boundaries
- Applies to highway preliminary estimate and budget compilation (JTG 3830-2018); not to railway (TB 10801-2024's sixteen-step procedure) or building/municipal (GB/T 50500 BOQ-based pricing) — each industry's composition and bases differ, no mixing.
- This is the 2018 new framework (8 items); 2018-system budgets must use it, not the old cost items of earlier highway administrative compilation rules for estimates and budgets.
- The daily labour rate serves only preliminary estimate/budget compilation, not wage payment; no double-counting of on-site haul or double handling for materials.
- Special costs (site construction fees etc.) do not participate in the separation of net price and VAT and are listed in full; statutory work safety levy (earmarked funds) per clause 3.1.11 (the calculation base is the cost of works excluding the levy itself x percentage rate, not less than 1.5%).
Further Reading
- JTG 3830-2018: clause 3.1.1 (composition, separation of net price and VAT, norm-based cost of works basis), clause 3.1.2 (direct costs: labour cost, material cost, with Tables 3.1.2-1 gross-mass coefficients/unit gross mass and 3.1.2-2 off-site transport wastage rates), clause 3.1.3 onward (permanent equipment procurement cost, preliminaries, overheads (company and site), statutory levies and fees, profit, taxes and duties, special costs).
- Companion quota norms: Highway Works Budget Quota Manual (JTG/T 3832-2018) Appendix IV norm-based labour, material and equipment unit-price table; Highway Works Plant Rate Norms per Machine-Shift (JTG/T 3833).
- Form 08 (comprehensive cost calculation) notes and the summary table (comprehensive Table 36.1): the tie-out norm-based cost of works = norm-based direct cost + norm-based permanent equipment procurement cost x 40% + preliminaries + overheads (company and site) + statutory levies and fees + profit + taxes and duties + special costs.
Keywords
Related Cards
- →
Railway estimate/budget preliminaries and on-costs (indirect costs): composition, calculation base, and percentage rates (TB 10801-2024 Clauses 3.6/3.9; TB 10811-2024 Table 2.9.1)
Preliminaries (7 items: winter (cold-weather) and rainy-season construction increase; night-work increase; minor temporary works cost; tools, utensils, instruments and meters cost; setting-out re-survey, work handover, and site clearing; mandatory health, safety and environmental (HSE) provisions and construction environmental protection; protection of completed works and equipment) = (base-period labour cost + base-period plant and small tools cost) x preliminaries percentage rate; on-costs (indirect costs) = overheads (company and site; 12 items) + profit, on the same base (base-period labour cost + base-period plant and small tools cost) x on-costs percentage rate (TB 10811-2024 Table 2.9.1; 16 work categories, 8.9%-58.6%).
- →
Work safety levy for non-railway works (building / municipal / highway / water conservancy): accrual basis, non-competitive nature, and ring-fenced use rules
Building/municipal: the mandatory health, safety and environmental (HSE) provisions are a non-competitive preliminary item priced at percentage rates set by national and provincial provisions (GB/T 50500-2024 Clause 3.2.5; GB 50722-2011 Clause 5.2.9); highway: accrued as the cost of works (construction and installation) (excluding the work safety levy itself) × percentage rate, with the rate not less than 1.5% (JTG 3830-2018 Clause 3.1.11); in all industries, tender (priced offers) must list it separately, it must not be a competitive bid item, and after the supervising engineer's certification and sign-off it is disbursed on actual expenditure — diversion strictly prohibited, no lump-summing (Ministry of Transport Order No. 25 of 2017, Article 21).
- →
Three bases for the composition of the construction price: cost elements, BOQ-based pricing, and final-account listing
The construction price (cost of works (construction and installation)) has three composition bases: (1) by cost elements (GB/T 50875-2013 Clause 2.2.10) = labour cost + material cost + construction machinery usage cost + management fee + profit + statutory levies and fees + taxes and duties (VAT under the current standard); (2) by BOQ-based pricing (GB/T 50500-2024) = divisional/sub-divisional works cost + preliminaries + other-item cost + VAT — the 2024 edition abolishes the separate statutory-levies item, the all-in unit rate being a fully inclusive price excluding VAT, and the VAT base deducting provisional sums for nominated specialist subcontract works; (3) by final-account listing (Clause 10.3.2) — 13 items. Mind the differences between the 2013 and 2024 bases when comparing.
- →
Definition of winter construction and calculation of the winter construction cost increment
Winter construction begins when the outdoor daily mean temperature stays stably below 5 °C for 5 consecutive days and ends when it stays above 5 °C for 5 consecutive days; the winter construction increment is charged under the industry quota — railway folds it into construction measure fees as (base-period labor cost + base-period construction plant usage cost) × rate (16 project classes × 8 region codes, Table 2.6.1); highway uses (quota labor cost + quota construction machinery usage cost) × temperature-zone rate, amortized over the whole year.
Cited By
- ←
Where statutory levies went after the 2024 BOQ pricing system dropped them as a separate line: social insurance and housing fund for production workers into labour cost; social insurance and housing fund for management staff and the works pollution charge (environmental protection tax) into overheads; urban maintenance and construction tax and surcharges likewise into overheads
The levies were not abolished but 'unbundled and no longer separately listed': GB/T 50500-2024 clause 3.1.2 makes the BOQ four parts - the works bill, the bill of preliminaries, the bill of provisional sums and other charges, and value added tax - leaving no slot for statutory levies at BOQ level; clause 3.1.6 requires the all-in unit rate and the item price to be 'fully inclusive pre-tax prices excluding VAT', which semantically absorbs the former levies into labour cost and overheads. The concrete destinations are fixed by the provincial expense norms: social insurance and housing fund for production workers (construction workers) go into labour cost; social insurance and housing fund for management staff and the works pollution charge (adjusted to the environmental protection tax under state provisions) go into overheads; urban maintenance and construction tax, education surcharge and local education surcharge also go into overheads.
- ←
Reading published price information as tax-inclusive or net, and the de-taxing conversion: de-tax by element (goods 13%, transport 9%, levy rate 3%), then custody, then into the all-in unit rate - with the order-bias test and double-tax prevention
Published prices are often tax-inclusive or freight-inclusive: read the release notes first. Tax-inclusive prices de-tax by each element's own rate (goods 13%, transport services 9%, simplified levy 3%) before purchasing and custody; a tax-inclusive delivered price divided once by 1.13 never adds freight or custody again. 'Add freight then divide the whole by 13%' differs algebraically from 'divide first, add later' only in form - both de-tax freight at 13%; the bias test is delta = F x (1/1.09 - 1/1.13) x (1+k). Net prices enter the all-in unit rate with VAT listed separately - one VAT only, throughout (GB/T 50500-2024 clauses 2.0.9, 3.1.6, 3.2.11).
- ←
Determining plant and small tools cost within the all-in unit rate: consumption × plant rate per machine-shift, 7-item/4-item composition of the plant rate per machine-shift, and adjustment for price differentials
Plant and small tools cost = construction machinery usage cost + construction instrument and meter usage cost, both determined as machine-shift consumption under quota norms (prescribed resource consumption standards) × plant rate per machine-shift (GB/T 51095-2015 Clause 5.3.9; TB 10801-2024 Section 3.3). The plant rate per machine-shift for construction machinery has 7 items = depreciation + overhaul + maintenance + assembly and disassembly + labour + power + other costs; the plant rate per machine-shift for instrument and meter has 4 items = depreciation + maintenance + verification + power; both are computed on an 8-hour working shift. Where machine-shift cost quota norms exist, take the price per the quota norms (railway TB/T 10814-2024, base-period price excluding deductible input value added tax (VAT)); the difference between base period and compilation period is listed as an adjustment for price differentials of plant and small tools cost. When fuel and power prices fluctuate beyond the agreed risk band (no-adjustment tolerance, e.g. ±5%; where not agreed, 5%), price adjustment (for fluctuation) applies; the price difference carries VAT only, with no management fee or profit (GB/T 50500-2024 Clauses 8.7.2, 3.3.5).
- ←
Reading the all-in unit rate pricing schedule of the fee quota norms line by line: charging bases (labour cost / labour cost plus plant and small tools cost), the order of charging (overheads, profit, risk cost -> all-in unit rate; pre-tax project cost -> VAT -> unit works cost), and a comparison of provincial bases (Shaanxi 2025 tables 5-1/5-2/5-3; Hubei 2024) with sector bases (highway form 08; railway table 2.6.2)
The main line of the all-in unit rate pricing program: labour, materials and plant (including dynamic adjustment / price differentials) -> direct cost subtotal -> overheads and profit (base: 'labour cost plus plant and small tools cost'; some provinces use 'labour cost') x rate -> (the Hubei basis adds a separate risk-factor line) -> all-in unit rate = the sum of all items; unit works cost = element works + preliminaries + other items = pre-tax (net-of-tax) project cost, then x VAT rate and added. In the Shaanxi 2025 'Shaanxi construction works fee rules', table 5-2 (base = labour cost plus plant and small tools cost) and table 5-3 (base = labour cost) list the social security costs of construction workers separately into the all-in unit rate as labour cost x rate, and table 5-1 places VAT after 'pre-tax project cost'; in the Hubei 2024 fee quota norms, overheads / profit = (labour cost + plant and small tools cost) x rate with the risk factor alone on line 6, while Annex 4 (tender price ceiling program) still keeps an independent 'statutory levies and fees' line (a trace of the 2013 BOQ basis). Highway JTG 3830-2018 form 08: preliminaries / overheads take quota labour cost + quota plant cost (or quota direct cost) as base, statutory levies take labour cost as base, profit takes (quota direct cost + preliminaries + overheads) as base, and taxes and duties take (direct cost + preliminaries + overheads + statutory levies + profit) as base.
- ←
Layered build-up of the fully loaded all-in rate: the base chain from labour, materials and plant through overheads, profit, statutory levies and taxes; the three charging-base regimes; why percentage rates cannot be added directly; and the cost boundary and conversion against the BOQ all-in unit rate (which excludes statutory levies as a separate line and VAT)
The fully loaded all-in rate must be built up layer by layer: overheads and profit are usually charged on labour cost plus plant and small tools cost, or on labour cost alone; statutory levies mostly on labour cost; VAT on the fully inclusive price excluding VAT. Each layer has a different, progressively larger base, so multiplying one base by (1 + the sum of the rates) overstates the result (a worked example overstates by about 33%). The correct chain is D = A + B + C -> overheads E and profit F charged on their own bases -> fully inclusive price excluding VAT P = D + E + F -> VAT T = P x t -> Q = P + T. The BOQ all-in unit rate under GB/T 50500-2024 cl. 2.0.9 and 3.1.6 is a pre-tax price excluding VAT (cl. 3.1.2's four BOQ categories no longer list statutory levies separately); the conversion is fully loaded all-in rate Q = (BOQ all-in unit rate Qc + statutory levies R) x (1 + VAT rate t).
- ←
Special-region construction additions in highway estimates and budgets (plateau, wind-sand, coastal): region definition, charging base and rate sources (JTG 3830-2018 clause 3.1.6 item 4, Appendix F)
The highway special-region construction addition holds only plateau, wind-sand and coastal items: plateau starts at 2000m altitude; wind-sand follows Appendix F's three zones and nine classes (semi-arid / semi-humid = zone 1; arid and extremely arid-cold = zone 2; extremely arid-hot = zone 3; cover over 50% fixed, 10%~50% semi-fixed, under 10% shifting); the coastal scope is set by the coastal provinces' transport authorities. All three charge on the sum of norm labour and norm plant of each works class, at the rates of Tables 3.1.6-4 / -5 / -6; a route crossing several altitude or wind-sand zones computes separately or weight-averages by quantity (route length). This system has no alpine-cold, remote-region or primeval-forest items.
- ←
The computation programme of a single-item railway building and installation estimate (TB 10801-2024 Table 2.6.2): the 16-step accumulation order, each step's charging base, and where the special construction addition sits
Per TB 10801-2024 Table 2.6.2's sixteen accumulating steps: quota direct works cost = (1)+(2)+(3); direct works cost = (4)+(5)+(9)+(10) (including extra-price freight, price differences total, fill material); construction-measures cost = [(1)+(3)] x the measures rate; the special construction addition 'is computed on the compilation-period labour and compilation-period plant'; direct cost = (11)+(12)+(13); on-costs = [(1)+(3)] x the on-costs rate; single-item estimate value = (14)+(15). Key base rules: the measures and on-costs bases are base-period labour + base-period plant; the special construction addition enters the direct cost only and never rolls into other charging bases. Equipment runs its own programme: equipment freight = (1) x the freight rate; value = (1)+(2).
- ←
Composition of the duty-paid arrival cost of imported equipment (its original price) and the three-step tax chain: customs duty, then consumption tax (an inclusive tax whose base must first be grossed up), then import-stage VAT - the formula chain, variable definitions and how each charging base is fixed
Per GB/T 50875-2013 clauses 2.2.5, 2.2.7 and 2.2.8, the duty-paid arrival cost of imported equipment = CIF (= FOB + international freight + international transport insurance) + import-related charges (bank financial charges, foreign-trade agent commission, import duty, consumption tax, import-stage VAT and vehicle purchase tax for imported vehicles). The order must be duty, then consumption tax, then VAT: duty = CIF x duty rate; consumption tax = (duty-paying value + duty) / (1 - consumption tax rate) x consumption tax rate (an inclusive tax - the tax-inclusive base must first be restored); import-stage VAT = (duty-paying value + duty + consumption tax) x VAT rate (VAT Regulations Article 14: composite taxable value = duty-paying value + duty + consumption tax). The bases must not be crossed: bank financial charges on FOB, foreign-trade commission on CIF.
- ←
Sources, bases and regional treatment of night-work additional cost rates: highways under JTG 3830-2018 Table 3.1.6-3 as a separate item; railways folded into the composite construction-measures rate of TB 10811-2024 Table 2.6.1 (16 works classes x regions 1-8); building and municipal works per provincial fee norms on base x rate
No unified national rate exists for night-work additional cost; the taking follows each sector's pricing system: 1) highways - JTG 3830-2018 clause 3.1.6 item 3 and Table 3.1.6-3, on the base of norm labour plus norm plant of the night-work items: structures II 0.903%, structures III 1.702%, technically complex major bridges 0.928%, steel and steel structures 0.874%, rates not regionalised; 2) railways - no separate item, folded into construction-measures cost per TB 10811-2024 Table 2.6.1's 16 works classes x regions 1-8 composite rates on base-period labour plus plant; 3) building / municipal works - the provincial fee norm's 'night-work addition = base x rate', the base being norm base price, norm labour or labour plus plant as the local pricing authority fixes - no cross-province borrowing.
- ←
Determining overheads (company and site) and profit within the all-in unit rate: the dual track of the percentage-rate method and independent market-level measurement (including railway on-costs percentage rates)
Overheads (company and site) and profit are determined on the dual track of fee standards/percentage-rate method + market-level correction: estimates/budgets and tender price ceilings (employer's maximum acceptable price) are computed per the percentage rates in the norms for on-costs and expenses (railway merges the two into on-costs (indirect costs) = (base-period labour cost + base-period plant and small tools cost) × on-costs percentage rate, TB 10811-2024 Table 2.9.1, 16 categories, 14.3%–58.6%); tenders (priced offers) are independently measured by the enterprise; profit is a competitive cost but bidding below enterprise cost is prohibited. Price adjustment for cost fluctuation carries value added tax (VAT) only, with no overheads or profit.
- ←
Charging boundary of material price differentials (construction-period adjustment): VAT only - no overheads or profit, and no participation in the charging bases of total-price preliminaries or statutory levies (GB/T 50500-2024 Article 3.3.5 paragraph 4, Article 8.7.6)
Differentials formed by construction-period material price settlement adjustments carry VAT only - no overheads or profit, and they do not join the charging bases of total-price preliminaries or statutory levies. Basis: GB/T 50500-2024 Article 3.3.5 paragraph 4 - differentials of labour, materials and the fuel-power element of plant within all-in unit rates carry VAT but not overheads or profit; Article 8.7.6 items 3 (preliminaries) and 7 (overheads and profit) are listed among fees not adjusted for cost fluctuation; and since total-price preliminaries charge on labour plus plant, and statutory levies on quota labour, material differentials - being material in nature - fall outside both bases anyway. Express contract terms prevail.
- ←
Three-step test for the unit price basis of cofferdam and island-building clay (borrowed fill): no extra charge where the quota already includes borrowing; priced per quota consumption where clay is listed as a material and adjusted as executed; purchased fill follows the fill material cost / norm-based material price basis
Cofferdam clay unit prices follow a three-step test (a decision order, not three alternatives): (1) where the quota item's work content already includes borrowing, no clay material cost is charged - the railway TB/T 10823-2024 Volume 2 plastic woven sack cofferdam work content includes excavation, manual bagging and haulage within 20 m, and its consumption table lists no soil material; (2) where the quota lists clay in the material consumption, price by the quota consumption and adjust at settlement per the actual borrowing (SJG 181.2-2024 Article 8.1.7 paragraph 2); (3) where purchase is genuinely required, the railway uses the fill material cost basis - fill material cost = sum of fill consumption x fill price (TB 10801-2024 Article 3.5.2), the fill price excluding deductible input VAT and being determined by the design institute through investigation and analysis (TB 10811-2024 Article 2.5.1); highways take purchased materials by reference to published prices combined with surveyed market prices, and self-quarried clay at the quota winning price plus auxiliary production on-costs and mineral resources tax.
- ←
The definition of preliminaries and its two charging bases: measurable preliminaries (priced like divisional-work costs) and comprehensively charged preliminaries (a rate on divisional-work costs plus measurable preliminaries)
Preliminaries defined (GB/T 50500-2024 clause 2.0.3): the costs of the technical, welfare, work-safety and environmental-protection items arising in construction preparation, construction and acceptance - tied to the works as a whole and to contract performance, not to any single divisional-work item. At budget stage two bases apply (GB/T 51095-2015 clause 5.3.10; DB42/T 823-2021 clause 6.3.10): measurable preliminaries price by the same method as divisional-work costs (clauses 5.3.8 / 5.3.9; 6.3.8 / 6.3.9); comprehensively charged preliminaries = (the unit work's divisional-work costs + measurable preliminaries) x the rate. At final account the preliminaries are recomputed as the full preliminaries of the completed works per GB/T 50500-2024 clause 10.3.3 - interim listings do not bind.
- ←
The basis and cost attribution of the equipment-versus-material division in construction pricing (GB/T 50531-2009 general provisions, including process-type principal materials treated as equipment)
Per GB/T 50531-2009: divide equipment from material by supply scope, character and the standard's definitions - never by article name alone (clause 3.1.1); equipment-class costs enter permanent equipment procurement, material-class costs enter building-works or installation-works costs by discipline (clauses 1.0.3, 3.2.2). Equipment covers building services equipment, process equipment and process-type principal materials (long-distance pipelines, cables and the like special valves priced as equipment); the equipment scope = body + 5 items supplied with it (spares and fittings, companion piping and instruments, factory ladders platforms and railings, inspection and metering tackle, oils chemicals and packing). Fallback: not made on site counts as equipment, partly off-site with site assembly counts as equipment, catalogue products fabricated on site may count as material (clause 3.1.7).
- ←
Highway works staple-and-supplementary food freight subsidy: composite mileage computation, rate selection and boundary rules (JTG 3830-2018 / JTG 3820-2018 clause 3.1.7)
Composite mileage = grain haul × 0.06 + fuel haul × 0.09 + vegetable haul × 0.15 + water haul × 0.70, all four hauls being whole-line averages; the subsidy is charged on the norm-based direct cost of each works class at the rates of Table 3.1.7-2; where the composite mileage falls between the listed mileages the rate may be interpolated, and works within 3 km charge this item as 3 km (JTG 3830-2018 clause 3.1.7 item 2; JTG 3820-2018 clause 3.1.7, on the same basis).
- ←
Summary and comparison requirements when highway estimates (budgets) are compiled in several sections: the summary estimate (budget) table (form 01-1), form 02-1, and comparison with the preceding stage's total cost (JTG 3830-2018 Clauses 1.0.6, 2.3.3, 2.3.5)
Per JTG 3830-2018, when a highway estimate (budget) is compiled in several sections, the principles shall be unified, the sectional costs summarized into the project total, and the total compared with the preceding stage's total (Clause 1.0.6); when compiled by sections or parts, a "summary estimate (budget) table" (form 01-1) must be compiled (Clause 2.3.5 item 3), with form 02-1 summarizing labor, main materials and equipment, and plant shifts; the explanations must contain the economic comparison of design alternatives and the comparison of quantities and costs with the preceding stage (Clause 2.3.3 items 6 and 7).
- ←
Highway estimate/budget project-table compilation rules: ten items of Part 1 cost of works (temporary works through special fees) and the part-item-sub-item-section-detail five-level coding (JTG 3830-2018 Section 2.4, Appendix B)
Per Clause 2.4.2 Figure 2.4.2 of JTG 3830-2018 (see Appendix B Table B.0.1), Part 1 cost of works divides into ten items: (1) temporary works; (2) subgrade works; (3) pavement works; (4) bridge and culvert works; (5) tunnel works; (6) intersection works; (7) traffic engineering and route facilities; (8) greening and environmental protection works; (9) other works; (10) special fees ((1) construction site development fee (2) work safety fee); item numbering uses the five levels part(1 digit)-item(2)-sub-item(2)-section(2)-detail(2), the ten items being numbered 101-110.
- ←
Distinction and division between subgrade and pavement in highway works: term definitions, the dividing plane (bottom of pavement structure = top of subgrade = top of roadbed) and the roadbed/embankment depth numbers, plus classification, pricing, and acceptance split calibers
Subgrade and pavement are divided at "bottom of pavement structure = top of subgrade = top of roadbed": below the plane is the subgrade (the pavement's foundation, a strip structure receiving traffic loads transmitted through the pavement); above is the pavement (the collective term for structural courses: surface course + base + subbase). Depth numbers: roadbed 0-0.80 m (upper roadbed 0-0.30 m, lower 0.30-0.80 m), upper embankment 0.80-1.50 m (GB/T 50083-2014 Clauses 5.1.1/5.2.2/5.2.3/5.2.4). In engineering composition, a highway consists of subgrade works, pavement works, and other works (GB/T 50841-2013 Clause 4.2.2); in estimates/budgets they are listed as items 2 and 3 of Part 1 (JTG 3830-2018 Section 2.4).
- ←
Highway comprehensive labor shift price: no trade differentiation, 8 h/day (tunnel 7 h, diving 6 h), includes individual social insurance and housing fund, and three differences from the labor market price (JTG 3830-2018 Clause 3.1.3)
Per Clause 3.1.3 of JTG 3830-2018: highway estimate (budget) quota labor uses a comprehensive shift price without trade differentiation (all labor at one price); working time is normally 8 h/day, tunnels 7 h, diving 6 h; the price already includes the individually paid pension, unemployment, and medical insurance (excluding maternity) and housing fund — the enterprise-paid portions and winter/rainy/night allowances, heating subsidy, staple-food subsidy, and home-visit travel are computed separately; the comprehensive shift price differs from the labor market price in three ways (working time, four-insurance-one-fund, other costs) and serves only estimate/budget compilation, not actual wages.
- ←
Definitions, cost composition and applicable conventions of the direct-cost rate, the all-in unit rate and the fully loaded all-in rate compared (Order No. 107 of the Ministry of Construction, GB/T 50500-2024, GB/T 51095-2015, etc.)
The three rate conventions widen in scope in turn: the direct-cost rate (labour plus materials plus plant only, with on-costs, profit and taxes computed separately) is contained in the all-in unit rate (labour plus materials plus plant and small tools plus overheads plus profit plus risk fees within the agreed band; GB/T 50500-2024 clause 2.0.9 expressly excludes VAT, which is carried separately), which is contained in the fully loaded all-in rate (further including statutory levies and taxes, tax-inclusive; GB/T 51095-2015 clause 6.2.3 requires its use for the tender price ceiling and tenders). Note that the "all-in rate method" defined in Order No. 107 of the Ministry of Construction is a fully loaded unit rate - the same name as, but different content from, the "all-in unit rate" of current BOQ pricing; the "all-in rate" of highway works is likewise a wide convention including statutory levies and taxes (and additionally equipment procurement cost and preliminaries).
- ←
Highway works JTG 3830-2018 composition of overheads (company and site): the five items — basic fee, staple and non-staple food freight subsidy, staff home-visit travel expenses, staff heating subsidy and financial costs — and the bases to which percentage rates are applied (clause 3.1.7)
JTG 3830-2018 clause 3.1.7: highway overheads (company and site) comprise basic fee, staple and non-staple food freight subsidy, staff home-visit travel expenses, staff heating subsidy and financial costs. The basic fee is calculated on the sum of (norm-based labour cost + norm-based construction plant and machinery cost) at the percentage rates in Table 3.1.7-1; the other four are each calculated on the norm-based direct cost of the respective works category at the percentage rates in Tables 3.1.7-2~3.1.7-5 (the heating subsidy by the temperature zone of the works location; see Appendix D). Composite mileage for the food subsidy = grain haul distance x 0.06 + fuel haul distance x 0.09 + vegetable haul distance x 0.15 + water haul distance x 0.70; for works with a composite mileage within 3 km, the fee is calculated as 3 km.
- ←
Highway 2018 system item-numbering rule for estimates and budgets: five levels - part (1 digit), item (2), sub-item (2), section (2), detail (2) (JTG 3830-2018 Clause 2.4.3; see Appendix B)
Per Clause 2.4.3 of JTG 3830-2018 "Measures for compiling estimates and budgets of highway engineering construction projects", the estimate/budget item number consists of 5 levels: part (1 digit), item (2 digits), sub-item (2 digits), section (2 digits), detail (2 digits), expanded layer by layer in that order — see Appendix B. Clause 2.4.1 provides: the serial numbers and contents of parts 1-5 and of the "items" remain unchanged when compiling; missing sub-item content may be added nearby as needed and arranged in the order actually appearing at the level concerned, without keeping the serial numbers of missing items below "item" level.
- ←
Should the construction-installation cost in a design estimate carry provisional sums? — the stage division of provisional sums (BOQ/contract level) vs reserve funds (estimate level)
No. The construction-installation cost (works cost) in a design estimate must not carry provisional sums. Provisional sums are a contract-price account of BOQ pricing (construction tendering and implementation) (defined in GB/T 50500-2024, 2.0.13; scope limited by 1.0.2; employer-controlled, unused portions revert, 8.3.1); the estimate's uncertain/unforeseeable costs are carried by the reserve funds (basic + price-difference) in the total estimate, whose composition — works costs + other construction costs + reserves + construction-period loan interest + VAT (T/ZBD 100.3-2022, 4.1.1 and Annex A) — has no "provisional sum" account.
- ←
Highway works have no separate "engineering instruments and meters use fee" account: non-fixed-asset instruments go into the construction auxiliary fee (Table 3.1.6-8 rates), quota shift prices per JTG/T 3833-2018, and comparison with the railway and housing/municipal calibers
The highway JTG 3830-2018 system has no separate "engineering instruments and meters use fee" account: (1) purchase, amortization, and repair of non-fixed-asset instruments are inside the construction auxiliary fee (production tools and utensils use fee), computed on each class of works' quota direct cost per Table 3.1.6-8 rates, construction monitoring costs included with no separate charge; (2) instrument shifts consumed within the budget quota are priced per the JTG/T 3833-2018 shift-cost quota (one of its 13 classes, 972 items; 7-component shift price) and enter the quota plant cost; (3) the employer-listed tools and instruments purchase fee (Clause 3.3.7) belongs to other construction costs and must not be mixed. Railway lists a separate "construction instruments use fee"; housing/municipal merges it into "construction plant and instruments use fee" — calibers differ, no cross-application.
- ←
Highway estimate/budget "other works construction costs": nine items and the project management fee rules (JTG 3830-2018 section 3.3)
Per clause 3.3.1 of JTG 3830-2018, the nine items of "other works construction costs" are: project management fee, research and test fees, project preliminary-stage fees, special appraisal (assessment) fees, combined trial-run fees, production-preparation costs, works traffic-maintenance management fees, works insurance, and other related costs. Project management fee (clause 3.3.2) has 5 sub-items: owner management fee, project informatization fee, supervision fee, design-document review fee, completion/acceptance testing fee; the owner management fee is computed progressively on quota construction-installation costs at Table 3.3.2-1 rates. Note: "land-use and demolition compensation costs" is a separate item in the 2018 edition (section 3.2), not among the nine.
- ←
Highway works estimate/budget works insurance fee rules: base = construction-installation cost (excluding equipment), rate 0.4% (JTG 3830-2018 clause 3.3.9)
Per clause 3.3.9 of JTG 3830-2018 "Measures for compiling estimates and budgets of highway construction projects", the works insurance fee is computed on the base of the construction-installation cost (excluding equipment cost) at a rate of 0.4%, covering contractor's all risks (CAR) and third-party liability insurance. The corresponding formula in summary table 36 is "works insurance fee = (construction-installation cost − equipment purchase cost) x rate", i.e. item (12) minus item (4), then the rate applied — the same at both estimate and budget stages.
- ←
Highway works JTG 3830-2018 material off-site transport wastage rate table: the rule that the wastage rate for bagged cement hauled by motor beyond 500 km increases by 0.5 percentage points, and the Table 3.1.2-2 values
Per the note to Table 3.1.2-2 "Material off-site transport wastage rate table" of the "Administrative compilation rules for estimates and budgets of highway construction projects" (JTG 3830-2018): "For cement carried by motor transport, when the haul distance exceeds 500 km, the wastage rate of bagged cement increases by 0.5 percentage points." The base off-site transport wastage rate for cement (bagged and bulk, including one handling) is 1.0%, plus 0.4% for each additional handling; beyond 500 km bagged cement takes 1.5% (1.0%+0.5%) — bagged only, with no cumulative stepping. The wastage enters the norm-based material price for estimating = (material price at source + freight and handling charges) × (1 + off-site transport wastage rate) × (1 + purchasing and custody charges rate) − recoverable packaging value. The same note appears in Table 3.1.2-2 of the "Administrative compilation rules for feasibility-stage cost estimates of highway construction projects" (JTG/T 3820-2018), on an identical basis.
- ←
Highway JTG 3830-2018 production preparation fee (clause 3.3.7) charging standards: production personnel training fee = design staffing x 3,000 yuan/person, plus traffic-maintenance management fee / works insurance fee (3.3.8-3.3.10)
Per JTG 3830-2018 clause 3.3.7, the production personnel training fee is "computed at design staffing and 3,000 yuan/person", i.e. = design staffing x 3,000 yuan/person; this sub-item has no rebuild/expansion discount (the "rebuild (expansion) projects at 70% of the tabulated fee" after table 3.3.7 applies only to office and living furniture purchase). The same clause's tooling purchase fee and emergency traffic-keeping equipment purchase fee are computed as per equipment purchase cost (clause 3.1.3); clause 3.3.9 works insurance fee = construction-installation cost (excluding equipment) x 0.4%.
- ←
Can high-slope monitoring, tunnel monitoring measurement and other construction-monitoring fees be listed separately in highway estimates/budgets? They are inside the construction-auxiliary fee and may not be computed separately (JTG 3830-2018 clause 3.1.6 item 6)
No. Per JTG 3830-2018 "Measures for compiling estimates and budgets of highway construction projects" clause 3.1.6 item 6 sub-item 3): "Construction-monitoring fees such as high-fill and soft-ground settlement monitoring, high-slope stability monitoring, bridge construction monitoring, tunnel construction monitoring measurement and advance geological forecast are contained in the construction-auxiliary fee and may not be computed separately." Correct practice: charge the construction-auxiliary fee on quota direct costs at Table 3.1.6-8 rates and describe the work content in the project execution plan; the JTG/T 3832-2018 budget quota system likewise has no standalone monitoring items.
- ←
Highway estimate/budget statutory fees (规费) base: charged on the sum of labor costs of each works class (JTG 3830-2018 clause 3.1.8) and the distinction from quota labor
Per JTG 3830-2018 clause 3.1.8, highway statutory fees comprise five items — pension, unemployment, medical (including maternity), work-injury insurance and housing fund; "each statutory fee is charged on the base of the sum of labor costs of each works class, at standards set by state or local laws, regulations, rules and provisions." That base is the compilation-period labor cost at the works location's composite day rate, not the "quota labor" priced at Appendix IV base prices of JTG/T 3832-2018 (the latter serving only quota direct costs and the bases of measures/enterprise-management/profit fees); the composite day rate already includes the employee-paid pension, unemployment, medical (excluding maternity) and housing fund, while the statutory fee charges the enterprise-paid portion.
- ←
Composition of highway estimate and budget documents: cover/title page/contents/explanatory notes/computation tables, Group A/Group B division and table computation order (JTG 3830-2018 section 2.3)
Per clause 2.3.1 of JTG 3830-2018, highway estimate and budget documents consist of the cover, title page, contents, explanatory notes and all computation tables; the explanatory notes must contain 10 items (clause 2.3.3); documents divide into Group A (fee computation tables) and Group B (base-data computation tables of the construction-installation cost), submitted with the design documents together with computable electronic cost data, Group B's "itemized works estimate (budget) table" (table 21-2) being submittable electronically only; when compiled by sections or parts, a "summary total estimate (budget) table" (table 01-1) must be compiled. Tables compute in the order of figure 2.3.6: table 22 -> 09 -> 21-2 -> 04 -> 01 -> 01-1 -> explanatory notes.
- ←
Highway 2018 quota-norm system — taxes and duties: VAT output tax listed separately; taxes and duties = (direct cost + permanent equipment procurement cost + preliminaries + overheads (company and site) + statutory levies and fees + profit) × construction VAT rate (JTG 3830-2018 clause 3.1.10)
Per clause 3.1.10 of JTG 3830-2018 "Administrative Compilation Rules for Estimates and Budgets of Highway Construction Projects": taxes and duties mean the VAT output tax that state tax law requires to be included in the cost of works (construction and installation), and the formula is: taxes and duties = (direct cost + permanent equipment procurement cost + preliminaries + overheads (company and site) + statutory levies and fees + profit) × construction VAT rate. Together with the clause 3.1.1 rule of separation of net price and VAT, all six bracketed items are computed at prices (rates) exclusive of deductible input VAT — input VAT enters no cost item and taxes and duties are listed separately in the project cost. The compilation rules do not lock the rate value; follow the finance and tax authorities — since 1 April 2019 the construction VAT rate under the general taxation method is 9% (MOF/STA/GAC Announcement No. 39 of 2019). Special costs (site construction fee, statutory work safety levy) do not enter the tax base.
- ←
Unit price of electricity for electric plant under self-generated power in highway works: A = 0.15 x K / N (JTG 3830-2018 Clause 3.1.2; K per the JTG/T 3833-2018 shift-cost quota)
With self-generated power, the unit price per kW.h of electricity for electric plant is computed per Clause 3.1.2 of JTG 3830-2018: A = 0.15 x K / N, where A is the price per kW.h (yuan), K the generating-set shift price (yuan, per JTG/T 3833-2018, fixed + variable costs), N the total set power (kW), and 0.15 a code-given constant. A is used for the plant shift power cost = shift electricity consumption x A; purchased grid power does not use this formula; the same clause is JTG 3820-2018 Clause 3.1.2 at the estimate stage.
- ←
Highway employer's (owner's) management fee rate coefficient adjustments: stand-alone tunnels / stand-alone super-major bridges x 1.3, offshore works x 1.2 (JTG 3830-2018 clause 3.3.2)
Per clause 3.3.2 of JTG 3830-2018: for stand-alone tunnels with twin-bore length over 5,000 m, and stand-alone super-major bridges such as cable-stayed bridges with water depth over 15 m and span >= 400 m and suspension bridges with span >= 800 m, the employer's (owner's) management fee is computed at the table 3.3.2-1 rate x 1.3; offshore works (monthly average working days under 15 d year-round in the construction period due to wind and waves) x 1.2; the two coefficients do not stack.
- ←
Highway works preliminary estimate (budget) employer's (owner's) management fee: computed progressively on the norm-based cost of works per JTG 3830-2018 table 3.3.2-1 rates (with full rate table and worked example)
Per clause 3.3.2 of JTG 3830-2018, the employer's (owner's) management fee is computed progressively by the banded rates of table 3.3.2-1 on the base of the norm-based cost of works. The norm-based cost of works (clause 3.1.1 caliber) = norm-based direct cost + 40% of norm-based permanent equipment procurement cost + preliminaries + overheads (company and site) + statutory levies and fees + profit + taxes and duties (VAT under the current standard) + special fees — at norm-based base prices, excluding compilation-period price differences. Rates decrease band by band from 4.858% (<=5 million yuan) to 1.057% (1,000-1,500 million yuan), progressive like income tax; e.g. at a base of 1,500 million yuan the fee = 22.57515 million yuan.
- ←
Highway permanent land-occupation fee composition and the five classes of land-use and demolition compensation costs (JTG 3830-2018 section 3.2)
Per clause 3.2.2 of JTG 3830-2018 "Measures for compiling estimates and budgets of highway construction projects", the permanent land-occupation fee has 5 items: land compensation, resettlement subsidy for requisitioned arable land, arable-land reclamation fee, forest-vegetation restoration fee, and pension insurance for land-lost farmers; clause 3.2.1 defines land-use and demolition compensation costs as 5 classes: permanent land-occupation fee, temporary land-occupation fee, demolition compensation, soil-and-water conservation compensation, and other costs. Each is computed per state and provincial (works-location) government provisions.
- ←
Highway JTG 3830-2018 Table 3.6.1 computation sequence for the cost of works (construction and installation): how the 8 components add up, the 7.42% profit, and the two different tax bases
Per Clause 3.6.1, Table 3.6.1 of JTG 3830-2018 (computation procedure and method for each cost), the cost of works (construction and installation) is built up in this order: direct cost (labour cost + material cost + plant cost) -> permanent equipment procurement cost (Form 05) -> preliminaries and overheads (company and site) (on the sum of norm-based labour cost plus norm-based plant cost, or norm-based direct cost x the prescribed percentage rate) -> statutory levies and fees (on the sum of the labour costs of the various classes of works, at the standards laid down by law) -> profit (7.42% of the sum of norm-based direct cost plus preliminaries plus overheads) -> taxes and duties ((direct cost + permanent equipment procurement cost + preliminaries + overheads + statutory levies and fees + profit) x construction VAT rate, Formula 3.1.10) -> special items (construction site development fee + statutory work safety levy; the levy = cost of works excluding the levy itself x rate, not less than 1.5%); added together the 8 components give the cost of works. Basis note: filling note 5 for Form 03 excludes the permanent equipment procurement cost from the tax base, unlike Formula 3.1.10, which includes it.
- ←
Whether purchased materials enter the bases to which percentage rates are applied for preliminaries and overheads (company and site) in highway preliminary estimates (budgets): the ministry JTG 3830-2018 base system and local exclusion rules (Qinghai DB63/T 2011-2022, Beijing DB11/T 1509-2018)
The ministry JTG 3830-2018 does not itemize exclusions of purchased materials; it distinguishes through base rules: preliminaries items based on "norm-based labour cost + norm-based plant and small tools cost" (winter/rainy/night/plateau/sand-storm/coastal/traffic-interference construction additions, site transfer fee) naturally contain no material cost; the auxiliary works allowance and overheads (company and site) based on "norm-based direct cost" (= norm-based labour cost + norm-based material cost + norm-based plant and small tools cost, all at JTG/T 3832-2018 appendix IV base prices) include purchased materials at quota base prices. Express exclusions are local: Qinghai DB63/T 2011-2022 clause 6.1.1.2 excludes purchased subgrade maintenance fill, greening nursery stock, commercial cement concrete, commercial asphalt mixes and stabilized-soil mixes, purchased concrete units, and permanent equipment procurement cost from the bases for preliminaries and overheads (company and site); Beijing DB11/T 1509-2018 clause 13.3.2.3 sets the purchased finished-material percentage rate uniformly at 0 (no comprehensive rate) and the paving/installation quota percentage rate at 10 for structures (general). Note clause 3.1.2 ("commercial cement concrete, asphalt mixes and stabilized-soil mixes carry no purchasing and custody charges; purchased units, finished and semi-finished products at 0.42%") is a purchasing and custody rule, not a fee-base rule.
- ←
Publication and dynamic adjustment of the labour workday rate (all-in daily labour rate) under the 2018 highway quota system: set and published by the provincial transport authority (JTG 3830-2018, Clause 3.1.2)
Per Clause 3.1.2, item 1 of JTG 3830-2018, labour cost in highway estimates (budgets) = labour workdays from the estimate/budget quota norms x the all-in daily labour rate; "the labour workday rate is set and published by the provincial transport authority and dynamically adjusted in due course", serving only as a basis for compiling estimates and budgets, not as a basis for the wages actually paid by contractors. The all-in daily labour rate is not differentiated by trade and already includes the individual's pension, unemployment and medical (excluding maternity) insurance contributions and housing fund; it differs from the labour market price in the working-hour basis (8 h/day, 7 h for tunnels, 6 h for diving), the enterprise's four insurances and one fund, and winter/rainy/night allowances — the two must not be mixed. It must also be distinguished from the "norm-based labour cost" computed at the base prices in Appendix IV of JTG/T 3832-2018 (used for the norm-based direct cost and for the bases to which percentage rates are applied).
- ←
Highway 2018 quota system profit: base = quota direct costs + measures + enterprise management, rate 7.42% (JTG 3830-2018 clause 3.1.9)
Per clause 3.1.9 of JTG 3830-2018 "Measures for compiling estimates and budgets of highway construction projects", highway profit is computed at 7.42% of "quota direct costs plus preliminaries and overheads" — a nationally uniform rate regardless of works class or region; profit enters the tax base (tax = (direct costs + permanent equipment procurement cost + preliminaries + overheads + statutory levies and fees + profit) x construction VAT rate, formula 3.1.10), so a wrong profit propagates into tax.
- ←
Highway combined trial-run fee: charged at 0.04% of quota construction-installation costs (JTG 3830-2018 clause 3.3.6)
Per clause 3.3.6 of JTG 3830-2018, combined trial-run fee = quota construction-installation costs x 0.04% (verbatim: "The combined trial-run fee is computed on the base of quota construction-installation costs at a rate of 0.04%"). It covers all costs of full-load combined trial runs of complete M&E equipment of highway projects, excluding commissioning costs payable within equipment installation costs; it belongs to section 3.3 "other works construction costs", applies uniformly to estimates and budgets, and takes the quota-caliber construction-installation costs, not market-priced.
- ←
Highway traffic-interference construction addition: charged by table across 8 bands of average two-way daily traffic (JTG 3830-2018 clause 3.1.6, Table 3.1.6-7)
Per clause 3.1.6 of JTG 3830-2018 "Measures for compiling estimates and budgets of highway construction projects": traffic-interference addition = (quota labor + quota plant cost) of the traffic-affected works x rate; the banding index is "average two-way traffic per day-night during construction (motor plus non-motor vehicles)" in 8 bands (51-100 up to over 5000), rates by works class from Table 3.1.6-7: earthwork 1.499%-6.468%, rockwork 1.279%-5.462%, haulage 1.451%-6.285%, pavement 1.390%-5.475%, Structures I 0.924%-3.647%, Structures II 1.007%-3.943%, Structures III 0.948%-3.713%; steel and steel structures marked "—" (not applicable). New works, closed construction with traffic interruption, and rebuild/widening with bypass roads do not charge the traffic-interference addition.
- ←
Highway JTG 3830-2018 plateau-region construction addition: from 2000 m elevation, base quota labor + quota plant cost, stepped rates in Table 3.1.6-4
Per clause 3.1.6 item 4 of JTG 3830-2018 "Measures for compiling estimates and budgets of highway construction projects", the plateau-region construction addition is charged from 2000 m elevation (inclusive) upward: the extra cost of reduced labor and plant efficiency in regions above 2000 m due to climate and air pressure; charged on the base of quota labor + quota construction-plant cost of each works class at Table 3.1.6-4 rates (first step 2000-2500 m: earthwork 13.295%, rockwork 13.711%, pavement 14.572%, structures 13.364%; then every 500 m to above 5000 m). Where a route crosses two or more elevation zones, compute separately or derive an average addition rate by quantity proportion, then compute the whole-line fee.
- ←
What the "approved (validated) documents" point to in the basis of the highway revised estimate: for a revised estimate, the preliminary-design approval document (JTG 3830-2018 Clause 2.2.1 item 4)
Verbatim from Clause 2.2.1 item 4 of JTG 3830-2018 "Measures for compiling estimates and budgets of highway engineering construction projects": "the approved (validated) document of the feasibility study report (for a revised estimate, the preliminary-design approval document) and related materials" — i.e., for a revised estimate the approved (validated) document is the preliminary-design approval document; only the ordinary design estimate is based on the feasibility-study approval. By contrast, Clause 2.2.2 bases the construction-drawing budget on "the approved preliminary design documents (or technical design documents, if any)" — the later the stage, the newer the basis.
- ←
Highway works preliminary estimate (budget) site construction fee: base to which percentage rates are applied = norm-based cost of works − special costs, progressive percentage rates per Table 3.1.11 (JTG 3830-2018 clause 3.1.11)
Per clause 3.1.11 of JTG 3830-2018 'Administrative Compilation Rules for Estimates and Budgets of Highway Works Construction Projects': the site construction fee is calculated on the 'site construction base to which percentage rates are applied = norm-based cost of works − special costs' at the percentage rates in Table 3.1.11 using the progressive bracket-excess method (5.338% for 5 million yuan and below, stepping down band by band to 1.118% above 10,000 million yuan, 15 bands); special costs = site construction fee + statutory work safety levy (earmarked funds). Distinguish it from the statutory work safety levy (earmarked funds) in the same clause: statutory work safety levy (earmarked funds) = cost of works (construction and installation) (excluding the levy itself) × percentage rate (not less than 1.5%) — the base is different and the two must not be mixed.
- ←
Highway 2018 quota system works classification: the 10 classes of JTG 3830-2018 clause 3.1.4 (Structures II = minor, medium, major and super-major bridges) and their use as fee-band selectors
Per clause 3.1.4 of JTG 3830-2018 "Measures for compiling estimates and budgets of highway construction projects", the 2018 highway estimate/budget system classifies works into 10 classes (earthwork, rockwork, haulage, pavement, tunnels, Structures I, Structures II, Structures III, technically complex bridges, steel and steel structures), with Structures II meaning minor, medium, major and super-major bridges; the main spans of steel pipe-arch, cable-stayed and suspension bridges and of major bridges with single span >=120 m (inclusive) and foundation water depth >=10 m (inclusive) form the separate class "technically complex bridges"; steel and steel structures of all works fall in class 10. Clause 3.1.5: purchased subgrade fill, greening seedlings, commercial cement concrete, commercial asphalt and stabilized mixes, and purchased concrete components are excluded from the bases of preliminaries and overheads (company and site). Works class is the banding basis for preliminaries and overheads (company and site) rates.
- ←
Composition of labor cost (quota labor cost) in the highway 2018 system: three classes of wage-type costs and the comprehensive shift-price caliber (JTG 3830-2018 Clause 3.1.2)
Per Clause 3.1.2 of JTG 3830-2018, highway estimate (budget) labor cost has three classes of wage-type costs: (1) time-rate or piece-rate wages; (2) allowances and subsidies (mobility allowance, special-region allowance, high-temperature/cold temporary allowance, work-at-height allowance, etc.); (3) wages paid under special circumstances (sickness, work injury, maternity, family-planning leave, marriage/bereavement leave, personal leave, home-visit leave, regular leave, suspended-work study, performance of state or social duties, at a proportion of the time/piece rate). Labor cost = quota labor shifts x comprehensive shift price (set, published, and dynamically adjusted by the provincial transport authority; not differentiated by trade; already including the individual's pension, unemployment, and medical insurance (excluding maternity) and housing fund), used only as the estimate/budget basis, not as an actual-wage basis; must be distinguished from the "quota labor cost" (percentage-rate base caliber) computed at the JTG/T 3832-2018 Appendix IV base prices.
- ←
Quota basis of labor/material/plant consumption in highway estimate (budget) compilation: JTG 3830-2018 clause 2.1.1 adopts JTG/T 3831-2018 estimate quota and JTG/T 3832-2018 budget quota
Clause 2.1.1 of JTG 3830-2018 provides: when compiling estimates and budgets, the labor, material/equipment and plant-shift consumption follow the current "Highway Works Estimate Quota" (JTG/T 3831) and "Highway Works Budget Quota" (JTG/T 3832), and the labor/material/plant costs are computed at the project-location workday unit prices, material budget prices and plant shift prices fixed by the measures. Design estimates use the 3831 estimate quota, construction-drawing budgets the 3832 budget quota — the two must not be mixed; plant shift prices pair with the "Plant shift fee quota of highway works" JTG/T 3833-2018.
- ←
Highway JTG 3830-2018 site construction fee: 5.338% on the first 5 million yuan, progressive computation per Table 3.1.11, and the base to which percentage rates are applied (special costs)
Per clause 3.1.11 and Table 3.1.11 "site construction fee rate table" of the Administrative Compilation Rules for Estimates and Budgets of Highway Works (JTG 3830-2018), the site construction fee is a special cost within the cost of works (construction and installation), alongside the statutory work safety levy (earmarked funds), with the base to which percentage rates are applied for site construction = norm-based cost of works − special costs, charged progressively rather than as the full amount × one percentage rate. First band: base up to 5 million yuan at 5.338% (example 500 × 5.338% = 26.69, i.e. 266,900 yuan); later bands decrease with the base (5-10 million 4.228%, 10-50 million 2.665%, ... above 10,000 million 1.118%).
- ←
Three-stage pairing of the highway 2018 pricing system: estimates with the "Highway engineering estimation indicators" JTG/T 3821-2018, design estimates with JTG/T 3831-2018, budgets with JTG/T 3832-2018, all sharing the plant shift-cost quota JTG/T 3833-2018
Per Ministry of Transport Announcement No. 86 (17 December 2018), the highway 2018 pricing system took effect on 1 May 2019: investment estimates use the "Highway engineering estimation indicators" JTG/T 3821-2018 (compiled per JTG 3820-2018); design estimates use the "Highway works estimate quota" JTG/T 3831-2018; construction-drawing budgets use the "Highway works budget quota" JTG/T 3832-2018 (estimates and budgets both per JTG 3830-2018); all three stages share the "Highway engineering plant shift-cost quota" JTG/T 3833-2018. JTG M20-2011, JTG B06-2007, JTG/T M21-2011, and JTG/T B06-01/02/03-2007 were abolished the same day.
- ←
Highway estimate (budget) work-safety fee: base = construction-installation costs excluding the fee itself, rate >=1.5% (JTG 3830-2018 clause 3.1.11), fee content and management requirements
Highway work-safety fee = construction-installation works costs (excluding the work-safety fee itself) x work-safety rate, the rate at not less than 1.5% (JTG 3830-2018 clause 3.1.11); it is one of the 'special costs' in the 8-item composition, covering eight categories of safety expenditure; per Article 21 of Ministry of Transport Order No. 25 of 2017, it must be separately accrued in bid prices and not treated as a competitive price item, reviewed and signed off by the supervising engineer, and, with the employer's consent, disbursed against actual costs within the project construction cost — diversion strictly prohibited. Comparison: railway (TB 10811-2024) books 3.0% of construction-installation costs — the two bases differ, so do not mix them.
- ←
Highway estimate/budget equipment purchase costs: four components — original price, freight, transport insurance, procurement and storage (JTG 3830-2018 clause 3.1.3)
Per clause 3.1.3 of JTG 3830-2018 "Measures for compiling estimates and budgets of highway construction projects": equipment purchase costs = equipment original price + freight + transport insurance + procurement-and-storage fee, taxes computed per compilation-period authority provisions; equipment enters at budget price with a planned purchase list (spec, model, quantity); installation costs of equipment needing installation are not part of this item and follow the construction-installation cost provisions separately; the equipment/material division follows Appendix C.
- ←
Highway investment estimate — permanent equipment procurement cost at the project-proposal stage: by the Appendix C rate on the norm-based cost of works (excluding special fees and itself) (JTG 3820-2018 Clause 3.1.3)
Per Clause 3.1.3 item 1 of JTG 3820-2018 "Measures for Compiling Investment Estimates of Highway Works Construction Projects", at the project-proposal stage: permanent equipment procurement cost = norm-based cost of works (excluding special fees and itself) x the Appendix C rate; the permanent equipment procurement cost attracts no preliminaries or overheads (company and site). At the feasibility-study stage the list method applies instead (equipment quantity x equipment budget price, incl. original price / freight and handling charges / transport insurance / purchasing and custody charges) or the reference values of Appendix I of the "Highway Works Estimation Indicators" JTG/T 3821-2018.