Highway comprehensive labor shift price: no trade differentiation, 8 h/day (tunnel 7 h, diving 6 h), includes individual social insurance and housing fund, and three differences from the labor market price (JTG 3830-2018 Clause 3.1.3)
Per Clause 3.1.3 of JTG 3830-2018: highway estimate (budget) quota labor uses a comprehensive shift price without trade differentiation (all labor at one price); working time is normally 8 h/day, tunnels 7 h, diving 6 h; the price already includes the individually paid pension, unemployment, and medical insurance (excluding maternity) and housing fund — the enterprise-paid portions and winter/rainy/night allowances, heating subsidy, staple-food subsidy, and home-visit travel are computed separately; the comprehensive shift price differs from the labor market price in three ways (working time, four-insurance-one-fund, other costs) and serves only estimate/budget compilation, not actual wages.
Applicable Codes
- JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.3条
Topic Positioning
The setting caliber of the "comprehensive shift price" in highway estimates (budgets): why it is not trade-differentiated, how many hours a shift contains, what the price includes, and how it differs from the highway labor market price — per Clause 3.1.3 of JTG 3830-2018 "Measures for compiling estimates and budgets of highway engineering construction projects".
Core Conclusions
No trade differentiation (key sentence, Clause 3.1.3): "Highway estimate (budget) quota labor uses a comprehensive shift price without trade differentiation — all highway labor (e.g., general hands, concrete workers, steel fixers, carpenters, riggers, stressing crews, tunnel face excavators, traffic-works installers, plant operators) takes the same comprehensive shift price."
Contents of the price (verbatim): "The comprehensive shift price already includes the individually paid pension, unemployment, and medical insurance (excluding maternity) and the housing fund within the social insurance contributions."
Working time per shift (verbatim): "The comprehensive shift price normally considers 8 working hours per day, tunnels 7 h, diving 6 h." That is, general highway labor 8 h/shift, tunnel works 7 h, diving 6 h — with shorter effective working time and heavier labor, one "shift" of tunnel or diving work corresponds to fewer actual hours, a difference already reflected in the quota labor consumptions and the price conversion.
Three differences from the labor market price (verbatim): (1) working time — the comprehensive shift price takes 8 h/day (tunnel 7 h, diving 6 h) while market labor hours generally differ; (2) enterprise-paid "four insurances and one fund" — in highway estimates (budgets) the enterprise-paid social insurance and housing fund are computed separately, whereas the market labor price generally includes them; (3) other costs — winter/rainy/night-shift allowances, site transfer, heating subsidy, staple-food subsidy, and home-visit travel are computed separately in highway estimates (budgets), whereas the market price does not separate them.
Usage rules: labor cost = quota labor shifts (quota consumptions) x comprehensive shift price (set, published, and dynamically adjusted by the provincial transport authority); the shift-conversion differences are already embodied in the consumptions and the price — no further conversion of shift counts when compiling; the comprehensive shift price serves only estimate/budget compilation, not actual wages, and does not equal the market price.
Applicable Boundaries
- Applies to highway estimate and budget compilation (JTG 3830-2018); the comprehensive shift price applies to all highway labor without trade differentiation.
- Not for railway, housing/municipal, or other systems — each industry has its own labor shift caliber; use the project's own system, no mixing.
- Enterprise-paid social insurance, housing fund, winter/rainy/night allowances, site transfer fee, heating subsidy, staple-food subsidy, and home-visit travel must be computed separately per the measures — not deemed included in the shift price; the individually paid maternity insurance is outside the inclusion.
- The comprehensive shift price is a pricing caliber, not a settlement price — do not use it to fix actual wages.
Further Reading
- JTG 3830-2018 Clause 3.1.3 (comprehensive shift price: no trade differentiation, 8/7/6 h, individual insurances included, three differences from the market price), Clause 3.1.2 (labor cost = quota shifts x comprehensive price; provincial publication and dynamic adjustment).
- Companion quota: JTG/T 3832-2018 Appendix IV "unit price table of quota labor, materials, equipment" (quota labor base price).
- Industry comparison: the railway labor shift caliber (TB 10801-2024 with TB 10811 fee quotas) differs — never apply railway calibers to highway budgets.