all-in workday (mixed crew converted)
- 01
Highway comprehensive labor shift price: no trade differentiation, 8 h/day (tunnel 7 h, diving 6 h), includes individual social insurance and housing fund, and three differences from the labor market price (JTG 3830-2018 Clause 3.1.3)
Per Clause 3.1.3 of JTG 3830-2018: highway estimate (budget) quota labor…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.3条2026-09-25 - 02
Difference between norm-based labour cost and actual wages: nature, composition, basis, and adjustment mechanism
Norm-based labour cost = norm-based labour consumption × all-in labour r…
TB 10801-2024 铁路基本建设工程设计概(预)算编制办法TB 10811-2024 铁路基本建设工程设计概(预)算费用定额JTG 3820-2018 公路工程建设项目投资估算编制办法2026-09-25 - 03
Determining labour consumption in quota norms: composition, time-study methods and data-processing flow
Labour consumption in quota norms = basic labour + auxiliary labour + ex…
GB/T 50875-2013 工程造价术语标准GB/T 50851-2013 建设工程人工材料设备机械数据标准DB11/T 2382-2024 建设工程施工消耗量标准2026-09-25