labour cost
- 01
Labour cost pricing basis within the all-in unit rate: norm-based labour cost (base-period workday rate) versus current-period published labour price information and labour market prices, the applicable rules at the tender price ceiling and tender stages, and the test that the labour cost differential and the labour cost inside the all-in unit rate are not adjusted twice
Labour cost in the all-in unit rate = norm (budget) labour consumption x…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.9、3.1.6、3.3.5、5.2.1、5.2.4、5.2.8、6.1.1、6.1.3、6.2.1、8.6.3、8.7.1条,App. A.2.1、A.2.4GB/T 51095-2015 建设工程造价咨询规范 第5.3.9条、App. CTB 10801-2024 铁路基本建设工程设计概(预)算编制办法 第3.1.1~3.1.5条、第4.1.1~4.1.2条2026-10-25 - 02
Highway comprehensive labor shift price: no trade differentiation, 8 h/day (tunnel 7 h, diving 6 h), includes individual social insurance and housing fund, and three differences from the labor market price (JTG 3830-2018 Clause 3.1.3)
Per Clause 3.1.3 of JTG 3830-2018: highway estimate (budget) quota labor…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.3条2026-09-25 - 03
Determining labour cost in the all-in unit rate: the two-step "norm resource consumption × labour unit price" method and its standard basis
Labour cost in the all-in unit rate is determined in two steps as "norm…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.9、8.6.3条GB/T 51095-2015 建设工程造价咨询规范 第5.3.9、7.4.2条TB 10801-2024 铁路基本建设工程设计概(预)算编制办法 第3.1节2026-09-25 - 04
Railway 2024 estimates and budgets: dividing the cost scope between labour cost and on-costs - attribution to production workers (all-in labour cost) vs management personnel (overheads) (TB 10801-2024 clauses 3.1/3.9)
Labour cost means the various costs incurred for the production workers…
TB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction ProjectsTB 10811-2024 · Fee schedule for design estimates and budgets of capital railway works2026-09-25 - 05
Composition and pricing rules of the variable costs in highway plant shift prices (JTG/T 3833-2018, items 5-7)
Per the general notes of the "Highway engineering plant shift-cost quota…
《公路工程机械台班费用定额》JTG/T 3833—2018《公路工程建设项目概算预算编制办法》JTG 3830—20182026-09-25