Composition and pricing rules of the variable costs in highway plant shift prices (JTG/T 3833-2018, items 5-7)
Per the general notes of the "Highway engineering plant shift-cost quota" (JTG/T 3833-2018), items 5-7 of the 7 cost components of a plant shift price are variable costs: labor cost (wages of operators attending the plant, incl. wages, allowances, subsidies, auxiliary wages, labor protection, etc.); power and fuel cost (electricity, solid fuels - coal/firewood, liquid fuels - gasoline/diesel/heavy oil, and water consumed in operation); vehicle and vessel tax (per state and provincial regulations). When compiling, labor and power/fuel consumptions are taken from this quota; labor and fuel unit prices are computed per JTG 3830-2018; shift prices for engineering vessels and diving equipment follow local provisions; other costs enter per annual working shifts at the standards of the provinces and departments of the State Council.
Applicable Codes
- 《公路工程机械台班费用定额》JTG/T 3833—2018
- 《公路工程建设项目概算预算编制办法》JTG 3830—2018
Topic Positioning
The scope and pricing rules of "variable costs" within highway plant shift prices, per the general notes of the "Highway engineering plant shift-cost quota" (JTG/T 3833-2018) — for compiling and reviewing plant shift prices and computing plant costs in highway estimates and budgets.
Core Conclusions
JTG/T 3833-2018 divides the 7 cost components of the plant shift price into fixed and variable:
- Items 1-4 are fixed costs: depreciation, overhaul, maintenance, and erection/dismantling auxiliary cost. When compiling shift prices they are adopted directly except in remote regions such as Qinghai, Xinjiang, and Tibet; in those regions, where fixed costs need adjustment due to differing plant service lives and large price differences in repair wages and parts/materials, coefficients may be set and applied by the provincial transport authority.
- Items 5-7 are variable costs:
- Labor cost: working-day wages of the operators attending the plant (incl. wages, allowances, subsidies, auxiliary wages, labor protection, etc.);
- Power and fuel cost: electricity, solid fuels (coal, firewood), liquid fuels (gasoline, diesel, heavy oil), and water consumed by the plant in operation;
- Vehicle and vessel tax: the vehicle and vessel tax payable per state and provincial (autonomous region, municipality) provisions. Pricing rules (key): when compiling a plant shift price, labor and power/fuel consumptions are taken from this quota (quantities locked to the quota); labor unit prices and power/fuel prices are computed per the "Measures for compiling estimates and budgets of highway engineering construction projects" (JTG 3830-2018). Shift prices of engineering vessels and diving equipment follow the local authorities. Other costs, when payable, enter the shift price per annual working shifts at the standards of the provinces and the relevant departments of the State Council. Two more calibers: plant transfer costs are excluded from this quota; losses from refueling and fuel filtering and power losses in the transmission line from the transformer to the plant are already included (do not charge again).
Applicable Boundaries
This caliber applies to the highway estimate/budget system (JTG/T 3833-2018 + JTG 3830-2018). Other industries' shift-cost quotas (e.g., railway TB/T 10814-2024) also have 7 components but differ in pricing rules and base-period price levels — no mixing. In remote regions (Qinghai, Xinjiang, Tibet) fixed costs may be adjusted, with coefficients set by the provincial transport authority; labor and power/fuel unit prices are not in this quota and are computed separately per JTG 3830-2018; vessel and diving-equipment shift prices follow local provisions.
Further Reading
See the "Highway engineering plant shift-cost quota" (JTG/T 3833-2018) general notes: item 5 (fixed costs and remote-region adjustment), item 6 (variable-cost composition and pricing, annual-working-shift charging), item 7 (plant transfer costs excluded), item 8 (fuel-filtering losses and transmission losses included); pricing per the "Measures for compiling estimates and budgets of highway engineering construction projects" (JTG 3830-2018).