all-in daily labour rate
- 01
Highway comprehensive labor shift price: no trade differentiation, 8 h/day (tunnel 7 h, diving 6 h), includes individual social insurance and housing fund, and three differences from the labor market price (JTG 3830-2018 Clause 3.1.3)
Per Clause 3.1.3 of JTG 3830-2018: highway estimate (budget) quota labor…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.3条2026-09-25 - 02
Highway estimate/budget statutory fees (规费) base: charged on the sum of labor costs of each works class (JTG 3830-2018 clause 3.1.8) and the distinction from quota labor
Per JTG 3830-2018 clause 3.1.8, highway statutory fees comprise five ite…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第 3.1.8 条(规费)JTG 3830-2018 第 3.1.2 条(人工费、综合工日单价)JTG 3830-2018 第 3.1.1 条(建安费组成、定额人工费定义)2026-09-25 - 03
Pricing chain of plant shift labor cost in the highway 2018 system: quota locks consumptions, price from the provincially published comprehensive shift price (JTG/T 3833-2018 general note 6 + JTG 3830-2018 Clause 3.1.2)
In the 2018 highway system, the machine-shift labour cost does not lock…
JTG/T 3833-2018 · Quota for Shift Costs of Highway Engineering Machinery 总说明第五条、第六条JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.2条JTG 3820-2018 · Measure for Compilation of Investment Estimates of Highway Construction Projects 机械台班费用计算表(21表)填表说明2026-09-25 - 04
Publication and dynamic adjustment of the labour workday rate (all-in daily labour rate) under the 2018 highway quota system: set and published by the provincial transport authority (JTG 3830-2018, Clause 3.1.2)
Per Clause 3.1.2, item 1 of JTG 3830-2018, labour cost in highway estima…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.2条、第2.1.1条、第3.1.1条、第3.1.8条JTG/T 3832—2018 · Budget Quota of Highway Engineering 附录四'定额人工、材料、设备单价表'JTG/T 3833 · Quota for Shift Costs of Highway Engineering Machinery2026-09-25 - 05
Composition of labor cost (quota labor cost) in the highway 2018 system: three classes of wage-type costs and the comprehensive shift-price caliber (JTG 3830-2018 Clause 3.1.2)
Per Clause 3.1.2 of JTG 3830-2018, highway estimate (budget) labor cost…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.2条JTG 3820-2018 · Measure for Compilation of Investment Estimates of Highway Construction ProjectsJTG/T 3832-2018 · Budget Quota of Highway Engineering 附录四2026-09-25