Highway JTG 3830-2018 site construction fee: 5.338% on the first 5 million yuan, progressive computation per Table 3.1.11, and the base to which percentage rates are applied (special costs)
Per clause 3.1.11 and Table 3.1.11 "site construction fee rate table" of the Administrative Compilation Rules for Estimates and Budgets of Highway Works (JTG 3830-2018), the site construction fee is a special cost within the cost of works (construction and installation), alongside the statutory work safety levy (earmarked funds), with the base to which percentage rates are applied for site construction = norm-based cost of works − special costs, charged progressively rather than as the full amount × one percentage rate. First band: base up to 5 million yuan at 5.338% (example 500 × 5.338% = 26.69, i.e. 266,900 yuan); later bands decrease with the base (5-10 million 4.228%, 10-50 million 2.665%, ... above 10,000 million 1.118%).
Applicable Codes
- JTG 3830—2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.11条、Table 3.1.11
Topic Positioning
Rate values and computation of the site construction fee in the highway 2018 quota norms system (JTG 3830-2018): 5.338% on the portion up to 5 million yuan, computed progressively per Table 3.1.11; plus the definition of the base to which percentage rates are applied and cost classification, for direct use in preliminary estimate/budget compilation.
Core Conclusions
Per clause 3.1.11 of JTG 3830-2018, the site construction fee is a "special cost" within the cost of works (construction and installation), alongside the statutory work safety levy (earmarked funds). Content: 1) office, living and production housing for contractor's premises and site laboratories built to site-standardization requirements, centralized rebar processing, centralized mixing and centralized precasting; 2) yard leveling (excluding earth/rock in mountainous heavy-hill terrain), hardening, drainage, greening, signage, sewage treatment, fencing (excluding rebar processing machinery, mixing plant and its erect/dismantle, precast component plinths, prestressing equipment, and temporary-works costs already in the quota norms); 3) erection or rental, maintenance, removal and clearing of temporary working access, footpaths, water and power branch lines and temporary structures (excluding through-roads inside the red line, entry/exit temporary roads and bypass roads); 4) depreciation, repair or rental of fixed-asset test equipment and instruments of the site laboratory; 5) construction-dust pollution prevention measures; 6) good site practice and staff health and living costs.
Rules for the base to which percentage rates are applied: the base for site construction = norm-based cost of works − special costs (special costs = site construction fee + statutory work safety levy (earmarked funds)), i.e. the base excludes the fee itself and the statutory work safety levy. Percentage rates apply progressively per Table 3.1.11 — not the full base × a single percentage rate; only the excess over a band boundary takes the next band's percentage rate.
Table 3.1.11 site construction fee rates (base unit: 10,000 yuan):
- <=500: 5.338%, example 500 × 5.338% = 26.69
- 500-1000: 4.228%, example 26.69 + (1000-500) × 4.228% = 47.83
- 1000-5000: 2.665%, example 47.83 + (5000-1000) × 2.665% = 154.43
- 5000-10000: 2.222%, example 154.43 + (10000-5000) × 2.222% = 265.53
- 10000-30000: 1.785%, example 265.53 + (30000-10000) × 1.785% = 622.53
- 30000-50000: 1.694%, example 622.53 + (50000-30000) × 1.694% = 961.33
- 50000-100000: 1.579%, example 961.33 + (100000-50000) × 1.579% = 1750.83
- 100000-150000: 1.498%, example 1750.83 + (150000-100000) × 1.498% = 2499.83
- 150000-200000: 1.415%, example 2499.83 + (200000-150000) × 1.415% = 3207.33
- 200000-300000: 1.348%, example 3207.33 + (300000-200000) × 1.348% = 4555.33
- 300000-400000: 1.289%, example 4555.33 + (400000-300000) × 1.289% = 5844.33
- 400000-600000: 1.235%, example 5844.33 + (600000-400000) × 1.235% = 8314.33
- 600000-800000: 1.188%, example 8314.33 + (800000-600000) × 1.188% = 10690.33
- 800000-1000000: 1.149%, example 10690.33 + (1000000-800000) × 1.149% = 12988.33
1000000: 1.118%, example 12988.33 + (1200000-1000000) × 1.118% = 15224.33
Classification and fee chain: the site construction fee enters neither norm-based direct cost nor preliminaries; profit is 7.42% of the sum of norm-based direct cost, preliminaries and overheads (company and site) (clause 3.1.9); taxes and duties (VAT under the current standard) = (direct costs + permanent equipment procurement cost + preliminaries + overheads (company and site) + statutory levies and fees + profit) × construction value added tax (VAT) rate (clause 3.1.10) — mind the order of items when compiling.
Applicable Boundaries
- Applies to highway works preliminary estimate/budget compilation under JTG 3830-2018, the same percentage rate table for both stages.
- The base must be "norm-based cost of works − special costs", special costs being the site construction fee plus the statutory work safety levy (earmarked funds); the base excludes both.
- Compute band by band progressively; never one percentage rate on the full base (the larger the base, the bigger the error of the flat-rate shortcut).
- The statutory work safety levy (earmarked funds) (same clause, item 2) is charged separately as cost of works (construction and installation) (excluding the levy itself) × percentage rate (≥1.5%) — do not confuse with the site construction fee.
- Supplementary quota items may reuse this table: the Beijing urbanized-section highway budget quota (2024-03-25) cites Table 3.1.11 and adds "environmental protection and good site practice addition calculated at 2.0% of the cost of works (construction and installation) (excluding special costs) as the base" — distinguish local from sector bases.
- Not for railway (TB 10801/10811 etc.) or other sector systems.
Further Reading
- Source: JTG 3830-2018 clause 3.1.11 and Table 3.1.11; read with clause 3.1.1 (8-item composition of cost of works), 3.1.9 (profit 7.42%), 3.1.10 (taxes and duties formula).
- The rules for the statutory work safety levy (earmarked funds) under the same clause are in the cited card "Highway estimate (budget) statutory work safety levy calculation rules".
- The 8-item composition and the separation of net price and VAT are in the cited card "Highway 2018 quota norms system: composition of cost of works (construction and installation)".
- Local comparison: the preface of the Beijing urbanized-section highway budget quota (2024-03-25) restates all Table 3.1.11 rates and the 2.0% environmental protection/good site practice addition clause.