Highway JTG 3830-2018 purchasing and custody charge rates for materials: steel 0.75%, fuel and explosives 3.26%, other materials 2.06%, purchased components 0.42%, commercial mixes exempt — and the basis for the norm-based material price for estimating

Per clause 3.1.2 of JTG 3830-2018 "Administrative compilation rules for estimates and budgets of highway construction projects", the purchasing and custody charge is calculated on the combined base "material price at source + freight and handling charges + off-site transport wastage" multiplied by the rate: steel 0.75%; fuel and explosive materials 3.26%; other materials 2.06%; purchased components, products and semi-products 0.42%; commercial cement concrete, asphalt mixes and all types of stabilized-soil mixes carry no purchasing and custody charge. Material price for estimating = (material price at source + freight and handling charges) x (1 + off-site transport wastage rate) x (1 + purchasing and custody charge rate).

Applicable Codes

  • JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第 3.1.2 条
  • JTG/T 3833 · Quota for Shift Costs of Highway Engineering Machinery

Topic Positioning

A key value card for material-cost compilation under the highway 2018 quota norms: the purchasing and custody charge rates prescribed by clause 3.1.2 of JTG 3830-2018 (steel 0.75% etc.), the base to which these percentage rates are applied, and the composition of the norm-based material price for estimating, together with the calibers for freight and handling charges and off-site transport wastage.

Core Conclusions

[Purchasing and custody charges] a) The various costs required in organising procurement and custody, plus storage wastage of materials in site warehouses. b) Calculated on the combined base "material price at source + freight and handling charges + off-site transport wastage", multiplied by the purchasing and custody charge rate. c) Rates (JTG 3830-2018 clause 3.1.2 verbatim): steel 0.75%; fuel and explosive materials 3.26%; other materials 2.06%; purchased components, products and semi-products 0.42%; commercial cement concrete, asphalt mixes and all types of stabilized-soil mixes carry no purchasing and custody charge. [Norm-based material price for estimating] = (material price at source + freight and handling charges) x (1 + off-site transport wastage rate) x (1 + purchasing and custody charge rate). Commercial cement concrete, asphalt mixes, all types of stabilized-soil mixes, and purchased components, products and semi-products are priced by the same method as materials. [Price at source] a) Purchased materials: determined comprehensively by reference to prices published by the transport authority of the administrative region and to surveyed market prices. b) Self-quarried materials (sand, stone, clay etc.): calculated at the quarrying unit rate in the quota norms plus auxiliary-production on-costs (indirect costs) and mineral resource tax (if any). [Freight and handling charges] The costs of materials from the supply point to the site warehouse (the place at the works where materials are stored), including loading and unloading charges and haulage charges, and, where incurred, storage charges and other incidentals (weighing, tagging, bracing, road and bridge tolls etc.). a) Materials carried by rail, water and road: freight calculated at surveyed market rates. b) Where a material has two or more supply points, freight shall be calculated by weighted average according to the differing distances, volumes and rates; because the estimate and budget quota norms already take account of the characteristics of site access roads and already include "site minor haulage" costs, no adjustment coefficient may be applied to the average motor-haul distance, and no on-site haulage distance or double-handling distance may be added beyond the site warehouse or stacking area. c) Materials in containers or packaging, and long, bulky or light materials: calculated on gross mass per Table 3.1.2-1; for drummed asphalt, petrol and diesel, packaging cost is calculated at one used petrol drum amortized per tonne (recovery disregarded). [Off-site transport wastage] Wastage occurring in the normal course of transport, rates per Table 3.1.2-2; note: for cement carried by motor vehicle over 500 km, the wastage rate for bagged cement increases by 0.5 percentage points. [Machine-shifts] Machine-shift rates for estimating are calculated per the "Highway works plant rate norms per machine-shift" (JTG/T 3833); the plant rate per machine-shift comprises fixed costs (depreciation, overhaul, maintenance, erection and dismantling auxiliary charges etc.) and variable costs (operators' labour cost, fuel and power, vehicle and vessel tax).

Applicable Boundaries

  • Only for highway construction projects compiling estimates and budgets under JTG 3830-2018; the railway system (TB 10801-2024 etc.) uses different formulas and calibers (wastage is merged into the purchasing and custody charge) and cannot be applied by analogy.
  • The base to which the percentage rate is applied is the combined "price at source + freight and handling charges + off-site transport wastage", not the price at source alone.
  • Distinguish "steel" (rebar, structural sections and similar bare materials, 0.75%) from "purchased components, products and semi-products" (precast girders, finished bearings etc., 0.42%); commercial cement concrete, asphalt mixes and stabilized-soil mixes carry no purchasing and custody charge.
  • Where a province's or city's published price information is issued on a basis that already includes the purchasing and custody charge (an "all-in price"), it must not be charged again — read the current price release notes for the period before use.
  • No on-site haulage distance or double-handling distance may be added to motor transport distances (the quota norms already include site minor haulage); where cement is carried by motor vehicle over 500 km, the wastage rate for bagged cement increases by 0.5 percentage points.

Further Reading

  • JTG 3830-2018 clause 3.1.2 (material costs), with Table 3.1.2-1 (gross-mass coefficients and unit gross mass of materials) and Table 3.1.2-2 (off-site transport wastage rates for materials).
  • For plant rates per machine-shift, see "Highway works plant rate norms per machine-shift" JTG/T 3833 (composition of fixed costs + variable costs).